Houston has 19 million sf of office space under construction, 54% more than a year ago, and its highest level since the booming 1980s, according to local news reports.
Nearly 40% of this new office space is corporately owned, according to the Houston Business Journal, which points specifically to a 3-million-sf campus being built by Exxon Mobil, a 1.1-million-sf campus in Westchase suburb by Phillips 66, and a 515,000-sf building that Southwestern energy is erecting.
New building begets higher land prices. CBRE research estimates that land values throughout the Houston metroplex are increasing strongly. For example, land prices in the Uptown/Galleria area range from $125 to $315 per square foot in the second quarter, according to the Houston Chronicle.
Construction workers are also benefiting from all of this activity. The Associated General Contractors of America says that Houston added more construction jobs that any major metro in the U.S. from August 2013 to August 2014. Houston’s employment in all business sectors has jumped by 10% since 2008, or twice the percentage in San Francisco, according to The Daily Beast.
The Business Journal reports that 10.8 million sf of office space are on schedule to be delivered by year’s end, a sizable jump over the 3.2 million sf delivered in 2013.
Related Stories
| Oct 27, 2010
Grid-neutral education complex to serve students, community
MVE Institutional designed the Downtown Educational Complex in Oakland, Calif., to serve as an educational facility, community center, and grid-neutral green building. The 123,000-sf complex, now under construction on a 5.5-acre site in the city’s Lake Merritt neighborhood, will be built in two phases, the first expected to be completed in spring 2012 and the second in fall 2014.
| Oct 21, 2010
GSA confirms new LEED Gold requirement
The General Services Administration has increased its sustainability requirements and now mandates LEED Gold for its projects.
| Oct 18, 2010
World’s first zero-carbon city on track in Abu Dhabi
Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.
| Oct 13, 2010
Editorial
The AEC industry shares a widespread obsession with the new. New is fresh. New is youthful. New is cool. But “old” or “slightly used” can be financially profitable and professionally rewarding, too.
| Oct 13, 2010
Test run on the HP Z200 SFF Good Value in a Small Package
Contributing Editor Jeff Yoders tests a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.
| Oct 13, 2010
Prefab Trailblazer
The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.
| Oct 13, 2010
Thought Leader
Sundra L. Ryce, President and CEO of SLR Contracting & Service Company, Buffalo, N.Y., talks about her firm’s success in new construction, renovation, CM, and design-build projects for the Navy, Air Force, and Buffalo Public Schools.
| Oct 13, 2010
Hospital tower gets modern makeover
The Wellmont Holston Valley Medical Center in Kingsport, Tenn., expanded its D unit, a project that includes a 243,443-sf addition with a 12-room operating suite, a 36-bed intensive care unit, and an enlarged emergency department.
| Oct 13, 2010
Modern office design accentuates skyline views
Intercontinental|Exchange, a Chicago-based financial firm, hired design/engineering firm Epstein to create a modern, new 31st-floor headquarters.