flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Hotel made from CLT opens at Fort Jackson, S.C.

Hotel Facilities

Hotel made from CLT opens at Fort Jackson, S.C.

This project used over 4,100 pieces of cross-laminated timber. It's the fourth CLT hotel in the Army's housing portfolio.


By John Caulfield, Senior Editor | November 3, 2020
Candlewood

The West Building of Candlewood Suites at Fort Jackson, S.C., a project that's part of a public-private partnership that the Army has with Lendlease and IHG Army Hotels. Images: IHG Army Hotels

Lendlease and IHG Army Hotels, which is part of the InterContinental Hotels Group, were the first to build a hotel using cross-laminated timber (CLT) in the U.S., constructed in the former troop barracks area at Redstone Arsenal in Alabama and opened in March 2016. That team recently completed its fourth CLT hotel, the first phase of the Candlewood Suites at Fort Jackson in South Carolina, which opened last month.

The first phase consists of this property’s 171-room West Building whose construction included some 4,100 pieces of black spruce CLT. The property’s East building, slated to be completed next spring, will have 146 rooms. The costs of these projects were not disclosed.

Lendlease and IHG Army Hotels have a portfolio of hotels with an aggregate 13,000-plus rooms, located on 40 U.S. military installations. This portfolio includes the largest Candlewood Suites hotel in the world, a 311-room facility that opened last July in Fort Gordon, Ga. The South Carolina project was developed under the Privatization of Army Lodging (PAL) program, and is the 14th Candlewood Suites hotel in the PAL portfolio. Lendlease and IHG Army Hotels took over operations of Fort Jackson’s lodging in 2013.

The $1.8 billion PAL program’s total construction costs to date exceed $940 million.

Also see: Time-lapse video of the Fort Jackson hotel’s construction

P3 AGREEMENT DATES BACK MORE THAN 10 YEARS

In 2009, Lendlease took ownership of more than 3,200 hotel rooms located across 10 U.S. Army installations and, with IHG, became the first developer to begin operations under PAL, an Army-led public-private partnership that was established to revitalize on-post lodging for soldiers, their families and government travelers. Under this program, Lendlease and IHG have also built hotels branded Holiday Inn Express and Staybridge Suites.

Lendlease, PAL’s executive developer under an agreement with the U.S. Department of Defense, is owner/developer, design/builder, and asset manager on the Fort Jackson hotel. InterContinental Hotels Group is the operator and manager of IHG Army Hotels.

“The PAL program is a great partnership [among] the Army, Lendlease, and IHG,” stated Scott Chamberlain, Acting Deputy Assistant Secretary of the Army for Installations, Housing, and Partnerships. “I look forward to ongoing success as we continue to meet the mission of the PAL program by improving the quality of life for service members and their families.

Each of the rooms includes a kitchenette among its amenities.

 

MAJOR INVESTMENTS IN HOUSING, AFTER MANAGEMENT FLAWS EXPOSED

Stars and Stripes reported last month that the Army plans to spend $2.8 billion in base housing over the next five years to build 3,800 new homes and renovate nearly 18,000 existing homes at Army bases. This announcement followed reports about dangerous housing conditions that include exposure to lead paint, mold and asbestos; insect infestation, and poor maintenance.

Military officials attribute some of these problems to poor oversight of private companies that manage nearly all the housing on stateside bases.

This latest investment would build on a $500 million base housing investment last fall, according to Army Secretary Ryan McCarthy.

Related Stories

Market Data | Aug 1, 2023

Nonresidential construction spending increases slightly in June

National nonresidential construction spending increased 0.1% in June, according to an Associated Builders and Contractors analysis of data published today by the U.S. Census Bureau. Spending is up 18% over the past 12 months. On a seasonally adjusted annualized basis, nonresidential spending totaled $1.07 trillion in June.

Hotel Facilities | Jul 27, 2023

U.S. hotel construction pipeline remains steady with 5,572 projects in the works

The hotel construction pipeline grew incrementally in Q2 2023 as developers and franchise companies push through short-term challenges while envisioning long-term prospects, according to Lodging Econometrics.

Adaptive Reuse | Jul 27, 2023

Number of U.S. adaptive reuse projects jumps to 122,000 from 77,000

The number of adaptive reuse projects in the pipeline grew to a record 122,000 in 2023 from 77,000 registered last year, according to RentCafe’s annual Adaptive Reuse Report. Of the 122,000 apartments currently undergoing conversion, 45,000 are the result of office repurposing, representing 37% of the total, followed by hotels (23% of future projects).

Hotel Facilities | Jul 26, 2023

Hospitality building construction costs for 2023

Data from Gordian breaks down the average cost per square foot for 15-story hotels, restaurants, fast food restaurants, and movie theaters across 10 U.S. cities: Boston, Chicago, Las Vegas, Los Angeles, Miami, New Orleans, New York, Phoenix, Seattle, and Washington, D.C.

Market Data | Jul 24, 2023

Leading economists call for 2% increase in building construction spending in 2024

Following a 19.7% surge in spending for commercial, institutional, and industrial buildings in 2023, leading construction industry economists expect spending growth to come back to earth in 2024, according to the July 2023 AIA Consensus Construction Forecast Panel. 

Hotel Facilities | Jul 21, 2023

In Phoenix, a former motel transforms into a boutique hotel with a midcentury vibe

The Egyptian Motor Hotel’s 48 guest rooms come with midcentury furnishings ranging from egg chairs to Bluetooth speakers that look like Marshall amplifiers.

Sponsored | Fire and Life Safety | Jul 12, 2023

Fire safety considerations for cantilevered buildings [AIA course]

Bold cantilevered designs are prevalent today, as developers and architects strive to maximize space, views, and natural light in buildings. Cantilevered structures, however, present a host of challenges for building teams, according to José R. Rivera, PE, Associate Principal and Director of Plumbing and Fire Protection with Lilker.

Standards | Jun 26, 2023

New Wi-Fi standard boosts indoor navigation, tracking accuracy in buildings

The recently released Wi-Fi standard, IEEE 802.11az enables more refined and accurate indoor location capabilities. As technology manufacturers incorporate the new standard in various devices, it will enable buildings, including malls, arenas, and stadiums, to provide new wayfinding and tracking features.

Engineers | Jun 14, 2023

The high cost of low maintenance

Walter P Moore’s Javier Balma, PhD, PE, SE, and Webb Wright, PE, identify the primary causes of engineering failures, define proactive versus reactive maintenance, recognize the reasons for deferred maintenance, and identify the financial and safety risks related to deferred maintenance.

Mixed-Use | Jun 12, 2023

Goettsch Partners completes its largest China project to date: a mixed-used, five-tower complex

Chicago-based global architecture firm Goettsch Partners (GP) recently announced the completion of its largest project in China to date: the China Resources Qianhai Center, a mixed-use complex in the Qianhai district of Shenzhen. Developed by CR Land, the project includes five towers totaling almost 472,000 square meters (4.6 million sf). 

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021