flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Hotel construction pipeline hits five-year high

Hotel construction pipeline hits five-year high

Year-over-year increases for projects and rooms were up 25% and 24%, respectively, in the third quarter.


By BD+C Staff | November 10, 2014
A Marriott hotel in Orlando, Fla. Marriott is leading the U.S. hotel pipeline. P
A Marriott hotel in Orlando, Fla. Marriott is leading the U.S. hotel pipeline. Photo credit: Timjarrett, Wikimedia Commons

The hotel construction pipeline hit a five-year high in the third quarter, clocking in at 3,516 projects and 443,936 rooms, Lodging Econometrics reports.

For four consecutive quarters, the pipeline has posted double-digit year-over-year increases in terms of both projects and rooms. In Q3, year-over-year increases for projects and rooms are up 25% and 24%, respectively.

Conditions are currently favorable for developers, according to the report. This year is the fifth consecutive year that the growth of guest room demand has exceeded supply growth; supply growth has been 1.3% for four consecutive years.

Making the outlook even rosier for developers: occupancy will reach a 17-year high by the end of 2014. Average rate and revenue per available room will also reach record highs at year-end, according to the report.

Other report highlights:
• 23 of the top 25 markets are running above the nation’s average occupancy rate of 65.9%
• New York, with 176 projects and 29,775 rooms, has the largest pipeline in the country
• Houston, Washington, D.C., Los Angeles, and Miami are the next largest pipelines
• The brand at the head of the pipeline is Marriott International, followed by Hilton and Intecontinental

Read more or order a full report here.

Related Stories

| Mar 9, 2012

2012 Giants 300 survey due Friday, April 13

See how your firm ranks among the AEC industry leaders. 

| Mar 7, 2012

Firestone iPad app offers touch technology

Free app provides a preview of Firestone’s Roots to Rooftop Building Envelope Solution with an overview of all the products from ground and stormwater management solutions, to complete wall panel and commercial roofing system applications.

| Mar 7, 2012

LEO A DALY opens new office in Riyadh, Saudi Arabia

Jay N. Kline, Regional Manager – Saudi Arabia, to lead new office.

| Mar 7, 2012

Turner appointed Batson-Cook CFO and treasurer

Cecil G. Hood to continue in advisory role.

| Mar 7, 2012

Thornton Tomasetti names Dowdall VP of Kansas City office

Dowdall will be responsible for supporting the Property Loss Consulting, Building Performance and Building Sustainability practices nationally.

| Mar 7, 2012

LEO A DALY selected to design Minnesota Fallen Firefighters Memorial

The bronze, figurative sculpture of a firefighter rescuing a child, which is currently on display at the Minneapolis/St. Paul International Airport, is lit by natural light through a circular void in the monolith.

| Mar 7, 2012

Houlihan Lokey adds Steffen to Industrials Group

Steffen bolsters group with experience in the building materials and rorest product sectors.

| Mar 6, 2012

Country’s first Green House home for veterans completed

Residences at VA Danville to provide community-centered housing for military veterans.

| Mar 6, 2012

EwingCole completes first design-build project for the USMA

The second phase of the project, which includes the academic buildings and the lacrosse and football fields, was completed in January 2012.

boombox1
boombox2
native1

More In Category

Geothermal Technology

Rochester, Minn., plans extensive geothermal network

The city of Rochester, Minn., home of the famed Mayo Clinic, is going big on geothermal networks. The city is constructing Thermal Energy Networks (TENs) that consist of ambient pipe loops connecting multiple buildings and delivering thermal heating and cooling energy via water-source heat pumps.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021