flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Hospitality building construction costs for 2023

Hotel Facilities

Hospitality building construction costs for 2023

Data from Gordian breaks down the average cost per square foot for 15-story hotels, restaurants, fast food restaurants, and movie theaters across 10 U.S. cities.


By Gordian | July 26, 2023
Photo by Rene Asmussen

Photo by Rene Asmussen, Pexels

First impressions form fast. In the hospitality industry, which includes restaurants, hotels, and entertainment facilities, an initial good impression is critical and hinges on clean, fully functioning facilities and a friendly, competent staff.

Especially in a post-Covid society, providing clean and safe accommodations is paramount. Facilities managers and owners are now taking extra steps to ensure the highest cleanliness standards, including upgrading air filtration systems, installing no-touch technologies and contactless services, and reconfiguring spaces to promote social distancing. Additionally, automation is being implemented to combat labor shortages and improve overall efficiency.  Improvements to meet green building expectations, anticipate guests’ needs with a more personalized experience, and ensure guests’ safety are paramount. RSMeans Data from Gordian can help estimate these costs.

With localized, square-foot costs for more than 100 building models including various hospitality industry facilities, RSMeans Data allows architects, engineers, and other preconstruction professionals to quickly and accurately create conceptual estimates for future builds.

This table shows the most recent costs per square foot for 15-story hotels, restaurants, fast food restaurants, and movie theaters in select cities.    

Visit rsmeans.com/bdandc for more information about RSMeans Data from Gordian. 

Location

Hotel, 8-24 Story

Restaurant

Restaurant (Green)

Fast Food Restaurant

Movie Theater

New Orleans, LA

$217.89 

$238.14 

$291.25 

$251.92 

$189.96 

Miami, FL

$220.69 

$241.20 

$295.12 

$257.03 

$191.42 

Phoenix, AR

$227.91 

$250.51 

$305.07 

$265.07 

$198.46 

Washington D.C.

$246.63 

$268.16 

$325.45 

$284.01 

$211.49 

Seattle, WA

$268.00 

$295.66 

$356.72 

$311.43 

$233.21 

Las Vegas, NV

$266.81 

$299.07 

$361.88 

$317.05 

$235.67 

Boston, MA

$287.44 

$318.44 

$384.41 

$335.59 

$253.43 

Los Angeles, CA

$291.18 

$322.67 

$388.96 

$341.45 

$256.22 

Chicago, IL

$294.87 

$332.87 

$400.50 

$349.15 

$264.10 

New York, NY

$323.44 

$362.35 

$434.54 

$380.55 

$286.37 

Please note: Square foot models are used for planning and budgeting and are not meant for detailed estimates.

 

 

 

Related Stories

| Dec 3, 2013

Creating a healthcare capital project plan: The truth behind the numbers

When setting up a capital project plan, it's one thing to have the data, but quite another to have the knowledge of the process. 

| Nov 27, 2013

Pediatric hospitals improve care with flexible, age-sensitive design

Pediatric hospitals face many of the same concerns as their adult counterparts. Inpatient bed demand is declining, outpatient visits are soaring, and there is a higher level of focus on prevention and reduced readmissions.

| Nov 27, 2013

Exclusive survey: Revenues increased at nearly half of AEC firms in 2013

Forty-six percent of the respondents to an exclusive BD+C survey of AEC professionals reported that revenues had increased this year compared to 2012, with another 24.2% saying cash flow had stayed the same.

| Nov 27, 2013

Wonder walls: 13 choices for the building envelope

BD+C editors present a roundup of the latest technologies and applications in exterior wall systems, from a tapered metal wall installation in Oklahoma to a textured precast concrete solution in North Carolina. 

| Nov 26, 2013

Construction costs rise for 22nd straight month in November

Construction costs in North America rose for the 22nd consecutive month in November as labor costs continued to increase, amid growing industry concern over the tight availability of skilled workers.

| Nov 25, 2013

Building Teams need to help owners avoid 'operational stray'

"Operational stray" occurs when a building’s MEP systems don’t work the way they should. Even the most well-designed and constructed building can stray from perfection—and that can cost the owner a ton in unnecessary utility costs. But help is on the way.

| Nov 19, 2013

Pediatric design in an adult hospital setting

Freestanding pediatric facilities have operational and physical characteristics that differ from those of adult facilities.

| Nov 19, 2013

Top 10 green building products for 2014

Assa Abloy's power-over-ethernet access-control locks and Schüco's retrofit façade system are among the products to make BuildingGreen Inc.'s annual Top-10 Green Building Products list. 

| Nov 18, 2013

6 checkpoints when designing a pediatric healthcare unit

As more time and money is devoted to neonatal and pediatric research, evidence-based design is playing an increasingly crucial role in the development of healthcare facilities for children. Here are six important factors AEC firms should consider when designing pediatric healthcare facilities.

| Nov 15, 2013

Greenbuild 2013 Report - BD+C Exclusive

The BD+C editorial team brings you this special report on the latest green building trends across nine key market sectors. 

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021