flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Hospitality building construction costs for 2023

Hotel Facilities

Hospitality building construction costs for 2023

Data from Gordian breaks down the average cost per square foot for 15-story hotels, restaurants, fast food restaurants, and movie theaters across 10 U.S. cities.


By Gordian | July 26, 2023
Photo by Rene Asmussen

Photo by Rene Asmussen, Pexels

First impressions form fast. In the hospitality industry, which includes restaurants, hotels, and entertainment facilities, an initial good impression is critical and hinges on clean, fully functioning facilities and a friendly, competent staff.

Especially in a post-Covid society, providing clean and safe accommodations is paramount. Facilities managers and owners are now taking extra steps to ensure the highest cleanliness standards, including upgrading air filtration systems, installing no-touch technologies and contactless services, and reconfiguring spaces to promote social distancing. Additionally, automation is being implemented to combat labor shortages and improve overall efficiency.  Improvements to meet green building expectations, anticipate guests’ needs with a more personalized experience, and ensure guests’ safety are paramount. RSMeans Data from Gordian can help estimate these costs.

With localized, square-foot costs for more than 100 building models including various hospitality industry facilities, RSMeans Data allows architects, engineers, and other preconstruction professionals to quickly and accurately create conceptual estimates for future builds.

This table shows the most recent costs per square foot for 15-story hotels, restaurants, fast food restaurants, and movie theaters in select cities.    

Visit rsmeans.com/bdandc for more information about RSMeans Data from Gordian. 

Location

Hotel, 8-24 Story

Restaurant

Restaurant (Green)

Fast Food Restaurant

Movie Theater

New Orleans, LA

$217.89 

$238.14 

$291.25 

$251.92 

$189.96 

Miami, FL

$220.69 

$241.20 

$295.12 

$257.03 

$191.42 

Phoenix, AR

$227.91 

$250.51 

$305.07 

$265.07 

$198.46 

Washington D.C.

$246.63 

$268.16 

$325.45 

$284.01 

$211.49 

Seattle, WA

$268.00 

$295.66 

$356.72 

$311.43 

$233.21 

Las Vegas, NV

$266.81 

$299.07 

$361.88 

$317.05 

$235.67 

Boston, MA

$287.44 

$318.44 

$384.41 

$335.59 

$253.43 

Los Angeles, CA

$291.18 

$322.67 

$388.96 

$341.45 

$256.22 

Chicago, IL

$294.87 

$332.87 

$400.50 

$349.15 

$264.10 

New York, NY

$323.44 

$362.35 

$434.54 

$380.55 

$286.37 

Please note: Square foot models are used for planning and budgeting and are not meant for detailed estimates.

 

 

 

Related Stories

Mixed-Use | Oct 4, 2018

Four-story hotel and adjacent affordable housing community opens in California’s Sonoma County

Axis/GFA Architecture and Design was the architect for the project.

Reconstruction & Renovation | Aug 21, 2018

The massive facelift of New York’s famed Waldorf Astoria moves into Phase Two

The refurbished hotel will feature fewer, but larger, guest rooms.

Hotel Facilities | Aug 10, 2018

How hospitality design makes spaces of all types better for users

Responding to these shifting expectations, building owners and design teams working in other markets now regularly embrace leading ideas from the world of hospitality and infuse them into their projects.

Hotel Facilities | Aug 1, 2018

'Home away from home' is hoteliers' newest theme

Creating an experience, with the accent on local color, is flavoring hotel design.

Mixed-Use | Jul 17, 2018

Water Street Tampa’s developer reveals details about this project’s public spaces

This $3 billion waterfront neighborhood will also include three hotels.

Sponsored | Hotel Facilities | Jul 13, 2018

Hotel renovation: More than just minding the dust

Do you know the vital signs for avoiding moisture & mold problems? Will your brand standards cause you headaches? How will you recover costs if you do get into trouble?

Adaptive Reuse | Jul 9, 2018

Work, park, live: Inside Cincinnati’s parking garage turned lifestyle hotel

The Summit hotel and conference center is a converted parking garage that was once a factory.

| May 30, 2018

Accelerate Live! talk: An AEC giant’s roadmap for integrating design, manufacturing, and construction

In this 15-minute talk at BD+C’s Accelerate Live! conference (May 10, 2018, Chicago), Skender CEO Mark Skender and Chief Design Officer Tim Swanson present the construction giant’s vision for creating a manufacturing-minded, vertically-integrated design-manufacturing-build business model.

| May 30, 2018

Accelerate Live! talk: From micro schools to tiny houses: What’s driving the downsizing economy?

In this 15-minute talk at BD+C’s Accelerate Live! conference (May 10, 2018, Chicago), micro-buildings design expert Aeron Hodges, AIA, explores the key drivers of the micro-buildings movement, and how the trend is spreading into a wide variety of building typologies.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021