flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Hospital construction costs for 2024

Healthcare Facilities

Hospital construction costs for 2024

Data from Gordian breaks down the average cost per square foot for a three-story hospital across 10 U.S. cities.


By Gordian | May 6, 2024
Hospital construction costs for 2024, Image by mspark0 from Pixabay

Image by mspark0 from Pixabay

In the ever-evolving landscape of healthcare, the construction of state-of-the-art facilities is a visible testament to the sector's commitment to advancing patient care. However, this progress does not come without its challenges. The industry is grappling with a complex web of factors that escalate construction costs, test its resilience, and underscore the importance of reliable, up-to-date construction cost data. 

According to Gordian’s RSMeans Data Online Building Models, the national average cost per square foot for commercial new construction of hospitals is nearly 20% higher today than in 2020. In addition to rising construction costs, other key challenges include integrating new technologies, sourcing skilled labor, managing material availability, and implementing infection control protocols. These factors can significantly impact project budgets and timelines.


More building construction cost reports from Gordian:


Current, localized construction cost data is crucial for creating accurate budgets, planning future expansions, ensuring timely project completion, and maintaining a competitive edge. 

Gordian’s data features over 100 building models, including hospital buildings. These localized models allow architects, engineers, and other preconstruction professionals to quickly and accurately create conceptual estimates for future builds. This table shows a five-year view of costs per square foot for three-story hospital buildings. 

Visit rsmeans.com/bdandc for more information about Gordian’s RSMeans Data.

Location

2020

2021

2022

2023

2024

5-Year Change

National Average

$371.48

$382.12

$400.11

$419.18

$445.26

19.9%

New York, NY

$494.19

$506.94

$523.11

$540.45

$575.76

16.5%

Chicago, IL

$444.21

$456.40

$474.03

$494.76

$525.06

18.2%

Boston, MA

$427.46

$433.44

$454.36

$479.38

$505.03

18.2%

Los Angeles, CA

$419.04

$430.83

$452.05

$475.20

$507.91

21.2%

Ann Arbor, MI

$369.02

$382.83

$396.83

$409.43

$437.62

18.6%

Omaha, NE

$340.43

$352.74

$363.59

$383.59

$408.53

20.0%

Denver, CO

$333.80

$345.51

$362.23

$378.97

$405.03

21.3%

Atlanta, GA

$329.05

$342.71

$359.46

$375.52

$402.45

22.3%

Phoenix, AZ

$327.81

$332.73

$351.97

$373.71

$398.65

21.6%

Houston, TX

$320.44

$329.72

$341.67

$357.30

$382.49

19.4%

Please note: Square foot models are used for planning and budgeting and are not meant for detailed estimates.

Related Stories

| May 29, 2012

Torrance Memorial Medical Center’s pediatric burn patients create their version of new Patient Tower using Legos

McCarthy workers joined the patients, donning construction gear and hard hats, to help with their building efforts.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

| May 23, 2012

New hospitals invest in data centers to manage growth in patient info

Silver Cross became one of the first hospitals to install patient tracking software so families know where a patient is at all times. New communication equipment supports wireless voice and data networks throughout the hospital, providing access to patients and their families while freeing clinicians to use phones and computers where needed instead of based on location.

| May 22, 2012

Batson-Cook names Partin VP of Business Development

Partin joins general contractor from Georgia Hospital Association.

| May 16, 2012

Balfour Beatty Construction taps Kiger as VP of operations

Kiger will manage current relationships and pursue other strategic clients, including select healthcare clients and strategic project pursuits in the Central Tennessee region.

| May 7, 2012

4 more trends in higher-education facilities

Our series on college buildings continues with a look at new classroom designs, flexible space, collaboration areas, and the evolving role of the university library.

| May 7, 2012

2012 BUILDING TEAM AWARDS: Fort Belvoir Community Hospital

A new military hospital invokes evidence-based design to create a LEED-certified facility for the nation’s soldiers and their families.

| May 7, 2012

2012 BUILDING TEAM AWARDS: Audie L. Murphy VA Hospital

How a Building Team created a high-tech rehabilitation center for wounded veterans of the conflicts in Iraq and Afghanistan.

| May 3, 2012

2012 BUILDING TEAM AWARDS: Rush University Medical Center

This fully integrated Building Team opted for a multi-prime contracting strategy to keep construction going on Chicago’s Rush University Medical Center, despite the economic meltdown.

boombox1
boombox2
native1

More In Category




Mass Timber

British Columbia hospital features mass timber community hall

The Cowichan District Hospital Replacement Project in Duncan, British Columbia, features an expansive community hall featuring mass timber construction. The hall, designed to promote social interaction and connection to give patients, families, and staff a warm and welcoming environment, connects a Diagnostic and Treatment (“D&T”) Block and Inpatient Tower.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021