flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Home electrification will require code upgrades

Codes and Standards

Home electrification will require code upgrades

Residential electric panel capacity must be increased.


By Peter Fabris, Contirbuting Editor | August 31, 2021

Courtesy Pixabay

Electric panel capacity in most homes could be a roadblock to widespread electrification unless panel sizing is addressed in updated building and energy codes and targeted incentive programs, according to research by Pecan Street, Inc.

Electrification of homes that use natural gas and other combustion fuels is a critical step in achieving meaningful emissions cuts that will help to avoid the worst impacts of climate change, Pecan Street says. As many as 48 million single-family homes in the U.S. may need electric service panel upgrades before they can fully electrify.

The research organization estimates that more than half of the new homes being built today have electric panels that will not enable full home electrification. Electric panel upgrades are an expensive proposition for most homeowners, though.

Pecan Street advocates creating sliding incentives based on household income levels to spur electric panel upgrades. Most all-electric homes will require at least a 200 Amp electric service panel—a provision that should be added to building codes, the research organization says.

Related Stories

University Buildings | May 30, 2015

Texas senate approves $3 billion in bonds for university construction

For the first time in nearly a decade, Texas universities could soon have some state money for construction.

Multifamily Housing | May 30, 2015

Energy Department releases resources to assess building energy benchmarking policies, programs

The new handbook demonstrates methodologies using real data from New York City.

Codes and Standards | May 27, 2015

Construction industry concerns with ‘Waters of the U.S.’ rule remain

EPA and Corps of Engineers rule may lead to a longer, more expensive permitting process

Codes and Standards | May 22, 2015

Rapid growth for environmental insurance in construction industry

The U.S. Environmental Protection Agency is paying closer attention to intrusion of potentially harmful vapors into commercial and residential buildings.

Codes and Standards | May 22, 2015

Roof collapse at Minnesota water park highlights failure to enforce codes

Rural areas say they can’t afford to enforce state-adopted building code.

Codes and Standards | May 22, 2015

U.S. House scuttles EPA plan to expand definition of waters in Clean Water Act

Construction industry officials said the rule would hamper developers, cost jobs.

Codes and Standards | May 22, 2015

First EPD covering PVC water and wastewater piping published

Benchmarks impacts of seven PVC pipe products across their life cycles.

Office Buildings | May 18, 2015

New ASHRAE standard offers test method to determine heat gain of office equipment

The standard will aid engineers in configuring cooling systems in office buildings.

Codes and Standards | May 7, 2015

Widespread damage from Nepal earthquake due to poor implementation of building code

Nepal’s code author says destruction was ‘inevitable.’

Codes and Standards | May 7, 2015

Lavish residential skyscrapers prompt concern over shadows

New York, San Francisco, Washington, D.C., and Boston among cities grappling with height regulations.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021