In 2020, after the coronavirus pandemic hit, millions of people were stranded in their homes with little else to do outside of remote work than watch TV. That isolation created an unprecedented demand for new and original content, which in turn sparked a proliferation of streaming services that urgently needed more production space.
In 2020, there were about 12 million sf of sound stages in North America, according to CBRE estimates. And the utilization rate of that space, which three years earlier had stood at around 70 percent, was close to 100 percent, according to a Deloitte report that evaluated the Los Angeles, New York, and Toronto markets. The “high spend” on production was creating shortages and driving demand for new sound stages, stated Deloitte.
This void has inevitably attracted investment capital. In June 2020, Blackstone paid a reported $1.69 billion to acquire a 49 percent stake in Hudson Pacific Properties, which is active in sound stage acquisition, construction, and adaptive reuse. Last August, Blackstone and Hudson revealed plans to spend nearly $1 billion to build a film and TV studio campus in the United Kingdom.
Other development investors buzzing around this sector include Hackman Capital (which earlier this month acquired 130,000 sf of sound stage space from Raleigh Studios in Hollywood, and 182,000 sf of space on Sony Pictures’ animation campus); Quixote, Trammell Crow, Amazon Studios, and Square Mill Capital Management.
The race is now on to catch up with anticipated future production demand. The Hollywood Reporter published an article last month about the “boom” in building proposals, retrofits, and competition for longer-term leases. “I’ve never seen so much activity in my career,” Robert Hale, FAIA, Partner and Creative Director with the design collective RIOS, told the trade newspaper.
ARCHITECTS GETTING IN ON THE ACTION
RIOS is among the architecture and design firms that are capitalizing on this demand. Gensler has been working with Trilith Studios in Atlanta to expand its 700-acre film studio by 220,000 sf with spaces that include production workshops, smart sound stages, and a four-story creative office center that’s scheduled to open this spring.
Before the pandemic, construction accounted for 10 percent of Relativity Architects’ soundstage work; now, it represents 50 percent, confirms Tima Bell, Assoc. AIA, Principal with the Los Angeles-based firm, whom BD+C spoke with yesterday.
Bell, who grew up in L.A. (his father, Edward, was an actor and producer, and his stepmother was the actress and competitive swimmer Esther Williams), notes that studios in general had typically preferred to lease stages on a short-term basis, for as long as they needed the space to shoot a certain film. “Netflix changed everything,” he says of the streaming platform that has become a content production juggernaut. “In fact, Netflix needed space more than it needed content.”
Netflix started taking three-year leases, and quickly locked up soundstage spaces in Los Angeles, New York, and London. Other streaming platforms that subsequently came on the scene have followed suit. So while there are still stages available for leasing, their numbers are far fewer; hence, the demand for new construction.
“I’ve been in the business a long time, and content has never slowed; it has only expanded,” says Bell. Even if the amount of content produced was static, there wouldn’t be excess sound stage space for another five years. What Bell does foresee, though, is a shift in the way movies are made toward relying more on virtual sets via Extended Reality (XR) technology.
NEW BUILDS AND RENOS ABOUND
Bell says his firm’s sound stage clients run the gamut from Internet content providers, management companies, and capital investors. Production companies still would rather lease than own space, and sound stage clients only show interest after projects have secured a permit.
The “key ingredients” in designing and building studios, Bell explains, are clear floor space (i.e., no columns), ample ceiling height, and power. And because these buildings usually require a large real estate footprint, the sound stages are often located in industrial areas of cities. For example, last year Relativity was working with Capture Studios on a remodel of an existing theater in Studio City along the Los Angeles River. For that project, the Building Team removed an oversized mezzanine and opened up the second-floor ceiling. The team also redid the building’s façade.
Relativity is currently working on adaptive reuses of two cold-storage warehouses, one that will be 90,000 sf and the other 200,000 sf, of which 120,000 sf will be stages and the rest offices.
Bell adds that his company is in the early design stages of two ground-up studio campuses. Nondisclosure agreements prevented him from saying much more beyond that the projects range from 14 to 20 acres, and 12 to 18 stages in multiple buildings sized between 15,000 and 50,000 sf.
(On its website, Relativity Architects says it is designing a 210,000-sf studio campus in Canada that will have four production stages, post-production offices, screening rooms, and support and amenities spaces. Relativity is also engaged in a project for Ace + Mission Studios in Los Angeles that, when completed, will offer 604,494 sf of space that includes three soundstages and production offices.)
Bell says his firm is in design on other sound stage projects in New York, Atlanta, and Eastern Europe. He notes that outside of Los Angeles, the availability of tax credits plays a large role in where stages are being built.
Because it has been designing sound stages for several years, Relativity Architects has a track record that newcomers to this sub-sector do not, says Bell. “With only a couple of exceptions, most of the new entrants don’t have experience with this building type, which has circulation and technology requirements.”
Sound stages also open new creative portals for Relativity’s architects and designers who previously have worked on other building types like hospitality or housing.
Related Stories
| Oct 13, 2010
Campus building gives students a taste of the business world
William R. Hough Hall is the new home of the Warrington College of Business Administration at the University of Florida in Gainesville. The $17.6 million, 70,000-sf building gives students access to the latest technology, including a lab that simulates the stock exchange.
| Oct 13, 2010
Science building supports enrollment increases
The new Kluge-Moses Science Building at Piedmont Virginia Community College, in Charlottesville, is part of a campus update designed and managed by the Lukmire Partnership. The 34,000-sf building is designed to be both a focal point of the college and a recruitment mechanism to get more students enrolling in healthcare programs.
| Oct 13, 2010
Cancer hospital plans fifth treatment center
Construction is set to start in December on the new Cancer Treatment Centers of America’s $55 million hospital in Newnan, Ga. The 225,000-sf facility will have 25 universal inpatient beds, two linear accelerator vaults, an HDR/Brachy therapy vault, and a radiology and imaging unit.
| Oct 13, 2010
Apartment complex will offer affordable green housing
Urban Housing Communities, KTGY Group, and the City of Big Bear Lake (Calif.) Improvement Agency are collaborating on The Crossings at Big Bear Lake, the first apartment complex in the city to offer residents affordable, eco-friendly homes. KTGY designed 28 two-bedroom, two-story townhomes and 14 three-bedroom, single-story flats, averaging 1,100 sf each.
| Oct 13, 2010
Residences bring students, faculty together in the Middle East
A new residence complex is in design for United Arab Emirates University in Al Ain, UAE, near Abu Dhabi. Plans for the 120-acre mixed-use development include 710 clustered townhomes and apartments for students and faculty and common areas for community activities.
| Oct 13, 2010
HQ renovations aim for modern look
Gerner Kronick + Valcarcel Architects’ renovations to the Commonwealth Bank of Australia’s New York City headquarters will feature a reworked reception lobby with back-painted glass, silk-screened logos, and a video wall.
| Oct 13, 2010
New health center to focus on education and awareness
Construction is getting pumped up at the new Anschutz Health and Wellness Center at the University of Colorado, Denver. The four-story, 94,000-sf building will focus on healthy lifestyles and disease prevention.
| Oct 13, 2010
Community center under way in NYC seeks LEED Platinum
A curving, 550-foot-long glass arcade dubbed the “Wall of Light” is the standout architectural and sustainable feature of the Battery Park City Community Center, a 60,000-sf complex located in a two-tower residential Lower Manhattan complex. Hanrahan Meyers Architects designed the glass arcade to act as a passive energy system, bringing natural light into all interior spaces.
| Oct 13, 2010
Community college plans new campus building
Construction is moving along on Hudson County Community College’s North Hudson Campus Center in Union City, N.J. The seven-story, 92,000-sf building will be the first higher education facility in the city.
| Oct 13, 2010
Bookworms in Silver Spring getting new library
The residents of Silver Spring, Md., will soon have a new 112,000-sf library. The project is aiming for LEED Silver certification.