flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Hollister Construction completes LEED Silver bank in Woodland Park, N.J.

Hollister Construction completes LEED Silver bank in Woodland Park, N.J.

Ground-up construction project included installation of solar panels.


By By BD+C Staff | March 27, 2012

Hollister Construction Services has completed the ground-up construction of a 2,900-sf, environmentally friendly bank branch in Woodland Park, N.J.

The project, which will receive LEED Silver certification, entailed the construction of a single-story building with a three-lane drive-thru and solar panels on the roof.

Hollister Project Manager Mike McCormack oversaw the project, which was designed for a leading regional bank by architectural firm Bergmann. BD+C

Related Stories

| Aug 11, 2010

BIM school, green school: California's newest high-performance school

Nestled deep in the Napa Valley, the city of American Canyon is one of a number of new communities in Northern California that have experienced tremendous growth in the last five years. Located 42 miles northeast of San Francisco, American Canyon had a population of just over 9,000 in 2000; by 2008, that figure stood at 15,276, with 28% of the population under age 18.

boombox1
boombox2
native1

More In Category




Resiliency

U.S. is reducing floodplain development in most areas

The perception that the U.S. has not been able to curb development in flood-prone areas is mostly inaccurate, according to new research from climate adaptation experts. A national survey of floodplain development between 2001 and 2019 found that fewer structures were built in floodplains than might be expected if cities were building at random.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021