Hollister Construction Services announced it is close to completion of a 42,000-sf office fit-out in Holtsville, N.Y.
Hollister is completing the fit-out on behalf of REIT Management and Research LLC, which purchased the 264,482-sf building from Piedmont Office Realty Trust shortly after Hollister commenced construction in September. The building is predominantly leased by the U.S. General Service Administration, which will utilize the space being constructed by Hollister as an Internal Revenue Service office.
Hollister Project Manager Mike McCormack is managing construction of the fit-out, which was designed by architectural firm Gensler. The project has included the construction of new office space, bathrooms and one tenant office unit lobby. Additionally, all new finishes and HVAC systems are being installed. BD+C
Related Stories
| Sep 28, 2011
Look who's coming to BD+C's Under-40 Leadership Summit
AEC industry "under-40 superstars" from top design and construction firms have signed up for BD+C's "Under-40 Leadership Summit."
| Sep 28, 2011
GBCI announces LEED fellow class of 2011
LEED Fellows represent green building industry's most accomplished professionals.
| Sep 28, 2011
Bradley sponsors design studio on intelligent buildings for UWM SARUP
The studio is taught by Gregory D. Thomson, assistant professor and co-director of the Institute for Ecological Design at UWM.
| Sep 23, 2011
Fire and hurricane rated glazed wall assemblies installed at multi-family residence in Florida
Fire and hurricane assemblies meet design and code requirements.
| Sep 23, 2011
ABI turns positive after four monthly declines
On the heels of a period of weakness in design activity, the Architecture Billings Index (ABI) took a sudden upturn in August.
| Sep 23, 2011
Under 40 Leadership Summit
Building Design+Construction’s Under 40 Leadership Summit takes place October 26-28, 2011 Hotel at the Monteleone in New Orleans. Discounted hotel rate deadline: October 2, 2011.