flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Holistic care model, regulatory changes make outpatient facilities a high priority [2014 Giants 300 Report]

Holistic care model, regulatory changes make outpatient facilities a high priority [2014 Giants 300 Report]

With the Affordable Care Act still in its infancy, Building Teams are seeing reverberations in the investment decisions of healthcare providers.


By Amy McIntosh, Associate Editor | July 23, 2014
Catawba Valley Medical Center Pavilion, Hickory, N.C. Photo: courtesy Freeman Wh
Catawba Valley Medical Center Pavilion, Hickory, N.C. Photo: courtesy Freeman White

With the Affordable Care Act still in its infancy, Building Teams are seeing reverberations in the investment decisions of healthcare providers, including new ideas about the types of buildings they are asked to create.

“To reduce costs, many hospitals, physicians’ groups, and healthcare systems are merging to eliminate duplication of operations,” says Kelly Altes, P.E., Project Executive for KJWW Engineering Consultants and a member of BD+C’s “40 Under 40” Class of 2014. “These and other trends are in many cases the result of the Affordable Care Act, which has providers focusing more than ever on patient experiences and outcomes, as well as outpatient services. This shift is resulting in a significant increase in medical office building and clinic construction and renovation projects.”

The latest version of the annual Hospital Construction Survey conducted by the American Society for Healthcare Engineering with Health Facilities Management magazine confirms this trend. The percentage of respondents planning medical office building expansions, completely new MOBs, neighborhood outpatient facilities and primary-care clinics, and ambulatory surgery centers were all up significantly. Meanwhile, 41% said the new regulatory environment makes it less likely that they’ll proceed with large new hospital construction projects.

TOP HEALTHCARE SECTOR ARCHITECTURE FIRMS

2013 Healthcare Revenue ($)
1 HDR $191,150,000
2 Stantec 126,523,841
3 HKS 113,904,765
4 CannonDesign 108,000,000
5 Perkins+will 96,663,046
6 HOK 92,185,580
7 NBBJ 85,544,000
8 Perkins Eastman 69,750,000
9 Hammel, Green and Abrahamson 66,036,440
10 SmithGroupJJR 58,159,528
SEE FULL LIST

 

TOP HEALTHCARE SECTOR ENGINEERING FIRMS

2013 Healthcare Revenue ($)
1 AECOM Technology Corp. $180,760,000
2 Jacobs 87,770,000
3 URS Corp. 45,036,525
4 Smith Seckman Reid 40,105,600
5 KPFF Consulting Engineers 38,000,000
6 Allen & Shariff 36,000,000
7 BR+A Consulting Engineers 29,900,000
8 Affiliated Engineers 27,947,000
9 CCRD Partners 23,760,000
10 Burns & McDonnell 19,810,000
SEE FULL LIST

 

TOP HEALTHCARE SECTOR CONSTRUCTION FIRMS

2013 Healthcare Revenue ($)
1 Turner Construction $2,001,060,000
2 McCarthy Holdings 1,738,000,000
3 Skanska USA 1,207,794,377
4 Brasfield & Gorrie 974,254,444
5 Clark Group 867,497,494
6 DPR Construction 806,488,333
7 PCL Construction 721,107,363
8 Whiting-Turner Contracting Co., The 720,455,505
9 JE Dunn Construction 700,315,855
10 Balfour Beatty US 469,422,190
SEE FULL LIST

With care models changing, medical office buildings increasingly provide services that were once the exclusive province of hospitals, from cancer care to emergency treatment to operations. According to Cushman & Wakefield, 80% of surgeries can successfully be completed in an ambulatory setting.


Giants 300 coverage of Healthcare brought to you by DuPont www.fluidapplied.tyvek.com

By moving these procedures away from large hospital campuses—which are often landlocked with little room for expansion—the volume of patients requiring the hospital is reduced, making way for patients with more complex needs. Since many off-campus MOBs are part of a network associated with a larger hospital, patients who end up needing more advanced care can simply transition to the main campus.

Locations of new MOBs are carefully considered, with developers opting to place them near shopping, restaurants, major roads, and public transit. In the past, many retail centers were wary of making deals with medical tenants because of the overall stigma of having a healthcare provider near retail and dining. Retail developers also believed medical tenants wouldn’t produce attractive levels of revenue. However, some developers have decided that having healthcare tenants is better than no tenants at all. 

In particular, medical groups have made good use of large spaces vacated by defunct retail franchises, both stand-alone and within malls. Kaiser Permanente recently opened a 32,000-sf MOB in Portland, Ore., via adaptive reuse of a Circuit City location the healthcare organization bought out of receivership in 2010. Minnesota’s HealthEast Care System has created clinics in St. Paul-area spaces once occupied by Borders, Gander Mountain, and eq-life retail stores.

 

New partnerships and development models

A Cushman & Wakefield investor survey on medical office buildings reports that many healthcare providers are now seeking to form joint ventures, often between for-profit and not-for-profit health systems. These partnerships may offer the for-profit business the name recognition of the nonprofit, and give the nonprofit access to the financial and physician resources of the for-profit. When smaller clinics partner with larger, better-funded hospitals, they can pool their resources to care for more patients.

A Jones Lang LaSalle report indicates that real estate investors are increasingly enthusiastic about the profit potential of MOBs. In 2013, 78% of MOB buyers and sellers were investors rather than developers or hospitals—a dramatic shift from 36% in 2012. Hospitals and healthcare providers still control 85% of healthcare real estate and are generally not interested in selling, leading to a tight property market, JLL says. The firm predicts that hospitals may be increasingly willing to reconsider leveraging under-used property assets, in light of strong investor interest in the sector. 

 

Regulations transform hospital design

Though construction of big new hospitals has slowed, healthcare groups are still investing in updates to keep properties functional, safe, and competitive. A twist pointed out by the HFM/ASHE report: Obamacare’s “two-midnight rule,” whereby hospital stays lasting less than two midnights must be billed as outpatient services. Some hospitals are creating dedicated units for observation-status patients, a tactic that may reduce overall length of stay.

 Private patient rooms are the new normal, typically flooded with natural light and richly equipped with accessibility features. New Facility Guidelines Institute recommendations for 2014 emphasize sterilization and infection control in both hospitals and outpatient facilities. Some clients are also debating pros and cons of “same-handed” layouts, wherein all patient rooms are similarly oriented, versus traditional “mirror” floorplans with back-to-back headwalls. 

“To achieve desired healthcare outcomes, evidence-based design and Lean design are becoming increasingly critical tools to design facilities in ways that minimize patient stress, increase patient and staff safety, and improve staff effectiveness and quality of care,” Altes says. “As a result, we’re seeing increased attention on such things as the incorporation of natural elements; ‘family-centered’ spaces; single-bed, same-handed patient rooms; and decentralized materials management.”

 

Read BD+C's full 2014 Giants 300 Report

Related Stories

| Oct 9, 2012

Celebrating brick in architecture

The Brick Industry Association’s 2012 Brick in Architecture Awards put the spotlight on new projects that make creative use of one of humankind’s oldest and most beloved building materials.

| Oct 5, 2012

2012 Reconstruction Award Special Recognition: Joplin Interim High School, Joplin, Mo.

At 5:41 p.m. CDT on Sunday, May 22, 2011, an EF5 tornado touched down in Joplin, Mo. In the next 31 minutes, the mile-wide, multiple-vortex tornado, with winds up to 250 mph, destroyed two thousand buildings, including Joplin High and nine other schools.

| Oct 5, 2012

2012 Reconstruction Award Bronze Winner: DPR Construction, Phoenix Regional Office, Phoenix, Ariz.

Working with A/E firm SmithGroupJJR, DPR converted a vacant 16,533-sf one-time “adult-themed boutique” in the city’s reemerging Discovery Triangle into a LEED-NC Platinum office, one that is on target to be the first net-zero commercial office building in Arizona.

| Oct 5, 2012

2012 Reconstruction Award Bronze Winner: Pomeroy Senior Apartments, Chicago, Ill.

The entire interior of the building was renovated, from the first floor lobby and common areas, to the rooftop spaces. The number of living units was reduced from 120 to 104 to allow for more space per unit and comply with current accessibility requirements.

| Oct 5, 2012

2012 Reconstruction Award Bronze Winner: Walsh Group Training and Conference Center, Chicago, Ill.

With its Building Team partners—architect Solomon Cordwell Buenz, structural engineer CS Associates, and M/E engineer McGuire Engineers—Walsh Construction, acting as its own contractor, turned the former automobile showroom and paperboard package facility into a 93,000-sf showcase of sustainable design and construction.

| Oct 5, 2012

2012 Reconstruction Award Silver Winner: 220 Water Street, Brooklyn, N.Y.

The recent rehabilitation of 220 Water Street transforms it from a vacant manufacturing facility to a 134-unit luxury apartment building in Brooklyn’s DUMBO neighborhood.

| Oct 5, 2012

2012 Reconstruction Award Silver Winner: Residences at the John Marshall, Richmond, Va.

In April 2010, the Building Team of Rule Joy Trammell + Rubio, Stanley D. Lindsey & Associates, Leppard Johnson & Associates, and Choate Interior Construction restored the 16-story, 310,537-sf building into the Residences at the John Marshall, a new mixed-use facility offering apartments, street-level retail, a catering kitchen, and two restored ballrooms.

| Oct 4, 2012

2012 Reconstruction Awards Silver Winner: Allen Theatre at PlayhouseSquare, Cleveland, Ohio

The $30 million project resulted in three new theatres in the existing 81,500-sf space and a 44,000-sf contiguous addition: the Allen Theatre, the Second Stage, and the Helen Rosenfeld Lewis Bialosky Lab Theatre.

| Oct 4, 2012

2012 Reconstruction Awards Gold Winner: Wake Forest Biotech Place, Winston-Salem, N.C.

Reconstruction centered on Building 91.1, a historic (1937) five-story former machine shop, with its distinctive façade of glass blocks, many of which were damaged. The Building Team repointed, relocated, or replaced 65,869 glass blocks.

| Oct 4, 2012

2012 Reconstruction Awards Gold Winner: Rice Fergus Miller Office & Studio, Bremerton, Wash.

Rice Fergus Miller bought a vacant and derelict Sears Auto and converted the 30,000 gsf space into the most energy-efficient commercial building in the Pacific Northwest on a construction budget of around $100/sf.

boombox1
boombox2
native1

More In Category

Adaptive Reuse

Empty mall to be converted to UCLA Research Park

UCLA recently acquired a former mall that it will convert into the UCLA Research Park that will house the California Institute for Immunology and Immunotherapy at UCLA and the UCLA Center for Quantum Science and Engineering, as well as programs across other disciplines. The 700,000-sf property, formerly the Westside Pavilion shopping mall, is two miles from the university’s main Westwood campus. Google, which previously leased part of the property, helped enable and support UCLA’s acquisition.


Geothermal Technology

Rochester, Minn., plans extensive geothermal network

The city of Rochester, Minn., home of the famed Mayo Clinic, is going big on geothermal networks. The city is constructing Thermal Energy Networks (TENs) that consist of ambient pipe loops connecting multiple buildings and delivering thermal heating and cooling energy via water-source heat pumps.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021