flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

HOK partners with Delos to accredit its designers as wellness professionals

Architects

HOK partners with Delos to accredit its designers as wellness professionals

They are also working on the first WELL-certified city district, in Tampa, Fla. 


By John Caulfield, Senior Editor | September 30, 2016

HOK will now promote the benefits for buildings to follow the performance criteria of the WELL Building standard. Image: HOK

HOK has become the latest AEC firm to form a partnership with Delos, the New York-based real estate developer whose International WELL Building Institute’s WELL Building standard establishes performance criteria for occupant health in the built environment.

Within the next 12 months, HOK has committed to put more than 100 of its designers through Delos’s program to become WELL Accredited Professionals (WELL APs).

Bill Hellmuth, AIA, LEED AP, HOK’s chief executive, has joined Delos’ Advisory Board, and will provide strategic counsel on design. HOK will also offer its experts in various practices to provide Delos with research and insight.

Advocates are attempting to promote wellness as the next big thing in nonresidential design and construction, like high performance and sustainability. BD+C’s September issue includes an extensive feature on this movement’s progress. One of the projects cited in that article is a HOK-designed interior renovation of office space in the TD Centre in Toronto to the specifications of the WELL standard for New and Existing Interiors.

“This project for TD is an example of how designers can uses WELL’s performance standards to elevate our ability to create exceptional workplaces,” said Kay Sargent, ASID, IIDA, CID, LEED AP, director of strategic accounts for HOK.

HOK and Delos are now working with Strategic Property Partners, a real estate developer, on the design of multiple buildings within SPP’s mixed-use development on 53 acres in the Channelside district of Tampa, Fla., between Amalie Arena and the central business area.

SPP is a joint venture between Cascade Investments LLC and Jeff Vinik, who owns the Tampa Bay Lightning NHL franchise and has a stake in the Boston Red Sox. This project aspires to be the world’s first WELL-certified city district under the WELL Community standard that is in its early pilot stage.

Components of that standard include enhanced walkability, robust green spaces with low-pollen trees, sound barriers to support acoustic comfort, access to healthy foods, green infrastructure, the daily monitoring and reporting of district air quality, and access to amenities of the urban waterfront.

The redevelopment of Channelside district will include the new 320,000-sf University of South Florida Morsani College of Medicine and Heart Institute, an adjoining 300,000-sf medical office building, and a parking, residential and retail building. It will also feature a 650-room luxury hotel.

SPP intends to begin vertical construction on this project late next year. When all three phases of this district are completed, sometime in the next decade, the redevelopment will have up to 9 million sf of commercial, residential (including 5,000 housing units), educational, entertainment, cultural, and retail space, with total investment exceeding $2 billion. 

Related Stories

| Nov 27, 2013

Wonder walls: 13 choices for the building envelope

BD+C editors present a roundup of the latest technologies and applications in exterior wall systems, from a tapered metal wall installation in Oklahoma to a textured precast concrete solution in North Carolina. 

| Nov 27, 2013

University reconstruction projects: The 5 keys to success

This AIA CES Discovery course discusses the environmental, economic, and market pressures affecting facility planning for universities and colleges, and outlines current approaches to renovations for critical academic spaces.

| Nov 26, 2013

7 ways to make your firm more successful

Like all professional services businesses, AEC firms are challenged to effectively manage people. And even though people can be rather unpredictable, a firm’s success doesn’t have to be. Here are seven ways to make your firm more successful in the face of market variability and uncertainty.

| Nov 26, 2013

Design-build downsized: Applying the design-build method in an era of smaller projects

Any project can benefit from the collaborative spirit and cooperative relationships embodied by design-build. But is there a point of diminishing return where the design-build project delivery model just doesn't make sense for small projects? Design-build expert Lisa Cooley debates the issue.

| Nov 25, 2013

Electronic plan review: Coming soon to a city near you?

With all the effort AEC professionals put into leveraging technology to communicate digitally on projects, it is a shame that there is often one major road block that becomes the paper in their otherwise “paperless” project: the local city planning and permitting department. 

| Nov 22, 2013

Kieran Timberlake, PE International develop BIM tool for green building life cycle assessment

Kieran Timberlake and PE International have developed Tally, an analysis tool to help BIM users keep better score of their projects’ complete environmental footprints.

| Nov 20, 2013

Architecture Billings Index slows in October; project inquiries stay strong

Following three months of accelerating demand for design services, the Architecture Billings Index reflected a somewhat slower pace of growth in October. The October ABI score was 51.6, down from a mark of 54.3 in September.

| Nov 19, 2013

Pediatric design in an adult hospital setting

Freestanding pediatric facilities have operational and physical characteristics that differ from those of adult facilities.

| Nov 18, 2013

6 checkpoints when designing a pediatric healthcare unit

As more time and money is devoted to neonatal and pediatric research, evidence-based design is playing an increasingly crucial role in the development of healthcare facilities for children. Here are six important factors AEC firms should consider when designing pediatric healthcare facilities.

| Nov 18, 2013

Lord Aeck Sargent opens metro D.C. office, updates brand

Architecture, design, and planning firm unveils its sixth office, plus a new visual identity system and website

boombox1
boombox2
native1

More In Category

Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021