flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

HOK offers guidance for reducing operational and embodied carbon in labs

Codes and Standards

HOK offers guidance for reducing operational and embodied carbon in labs

Pathway to Net Zero Carbon Labs report released,


By Peter Fabris, Contributing Editor | March 10, 2022
Reducing Carbon
Courtesy Pixabay.

Global design firm HOK has released research providing lab owners and developers guidance for reducing operational and embodied carbon to meet net zero goals.
 
HOK’s initial analysis indicates that it is possible to build and operate labs in accordance with the sustainable design goals of the RIBA and AIA 2030 challenges, according to the report’s executive summary. “The approaches studied in this analysis can significantly reduce the whole-life carbon (operational carbon + embodied carbon × building lifespan) of a lab building,” the document says.
 
Modelling revealed little difference between vertical and linear lab building forms in achieving net zero. But linear labs’ expansive roofs provide an advantage by allowing for more solar panel arrays.
 
The analysis examined new lab buildings, but the most sustainable option is to reuse and adapt existing buildings, HOK says. Lab buildings are significantly more energy intensive to operate than commercial office buildings and their embodied carbon also is much higher than typical commercial space. Labs demand far greater ventilation than most building types and are home to highly energy-intensive equipment that is often in operation 24 hours a day. Labs also require robust structural systems to limit building vibration and support heavy building loads.
 
HOK’s analysis looked at numerous strategies to reduce carbon footprint in lab structures. The report provides technical details on these approaches.

Related Stories

| Mar 15, 2012

New Florida building code establishes flood and storm surge provisions

The new 2010 code establishes minimum design and construction requirements to protect buildings from wind, rain, floods, and storm surges.

| Mar 15, 2012

Illinois city rejects international code due to home sprinkler requirement

Macomb, Illinois aldermen voted to recommend that the city not adopt 2012 international building and residential code standards requiring the installation of overhead sprinkler systems in newly constructed one-family and two-family homes.

| Mar 15, 2012

Tenant advocates propose licensing landlords in New York City

With thousands of New York City rental units posing potential dangers to tenants, city advocates are proposing measures to make landlords improve building safety.

| Mar 15, 2012

Construction industry a big winner in federal small disadvantaged business procurement

Last year, only 5% of federal contract dollars went to small disadvantaged businesses. Construction and facilities support firms were the biggest beneficiaries.

| Mar 15, 2012

ANSI approves new fall protection standards

The American National Standards Institute (ANSI) has approved two American Society of Safety Engineers' (ASSE) standards addressing fall protection.

| Mar 8, 2012

Engineering innovation provides new option for meeting seismic codes in skyscrapers

Two University of Toronto engineers have developed “viscoelastic-energy-dissipating dampers” to replace many of the heavy concrete beams used in tall structures.

| Mar 8, 2012

CSI webinar on building code compliance March 22

A March 22 webinar will provide an overview of a 28-step process during the design of a building to ensure compliance with building codes.

| Mar 8, 2012

Federal silica dust rule caught in bureaucratic limbo

A federal rule meant to protect the lungs of workers has been caught in bureaucratic purgatory for more than a year.

| Mar 8, 2012

New LEED-EBOM rating has requirements for specific project types

Several key changes are proposed for the LEED-EBOM Rating System in 2012.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021