HOK was recently recognized with an architectural award from the Los Angeles Business Council at a celebration that drew hundreds of the region’s leading architects, designers and building professionals.
Nearly 30 projects from across the architectural spectrum were recognized for design excellence and community impact at the event. More than 500 professionals gathered at the Beverly Hilton Hotel for the event, keynoted by Los Angeles County Museum of Art Director Michael Govan, the bold leader behind LACMA’s recent evolution. Mayor Antonio Villaraigosa was also among the event’s featured speakers, acknowledging the outstanding projects that make LA livable, beautiful and economically vibrant.
HOK worked with Cedars?Sinai on a "transformational" project at the landmark medical center, a major beautification featuring lush gardens, landscaped walkways and freshly painted buildings ? a renewal meant to turn the campus into an urban oasis to benefit not only the institution's 18,000?20,000 patients, medical staff and visitors daily but also the surrounding community. When completed in 2014, the work will include water fountains, sculptures and roadways framed by palm trees and other greenery. To freshen the well? known Cedars?Sinai buildings with a "champagne metallic" color to match the newest building on campus, the Saperstein Critical Care Tower, painters will apply 5,875 gallons of acrylic paint over 885,250-sf of exterior walls.
A distinguished jury of owners, contractors, architects and civic leaders selected this year’s outstanding winners from hundreds of submissions. The Grand Prize went to LACMA Transformation Phase II: Resnick Pavilion, Ray’s Restaurant and Stark Bar. The Community Impact Award honored Baldwin Hills Crenshaw Plaza; Cedars?Sinai Medical Center; and Westfield Culver City. +
Related Stories
| May 31, 2012
Perkins+Will-designed engineering building at University of Buffalo opens
Clad in glass and copper-colored panels, the three-story building thrusts outward from the core of the campus to establish a new identity for the School of Engineering and Applied Sciences and the campus at large.
| May 30, 2012
Construction milestone reached for $1B expansion of San Diego International Airport
Components of the $9-million structural concrete construction phase included a 700-foot-long, below-grade baggage-handling tunnel; metal decks covered in poured-in-place concrete; slab-on-grade for the new terminal; and 10 exterior architectural columns––each 56-feet tall and erected at a 14-degree angle.
| May 30, 2012
Pringle Brandon in discussions to join forces with Perkins+Will
The London offices would be known as Pringle Brandon Perkins+Will.
| May 30, 2012
Boral Bricks announces winners of “Live.Work.Learn” student architecture contest
Eun Grace Ko, a student at the Ryerson University in Toronto, Canada, named winner of annual contest.
| May 30, 2012
Hill International to manage construction of Al Risafa Stadium in Iraq
The three-year contract has an estimated value to Hill of approximately $3.3 million.
| May 29, 2012
Torrance Memorial Medical Center’s pediatric burn patients create their version of new Patient Tower using Legos
McCarthy workers joined the patients, donning construction gear and hard hats, to help with their building efforts.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 29, 2012
AIA expands Documents-On-Demand service??
Six new documents added, DOD offers nearly 100 contract documents.
| May 29, 2012
Legrand achieves over 20% energy-intensity reduction in Presidential Challenge
West Hartford headquarters announced as Better Buildings, Better Plants “Showcase” site.