flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Hoar Program Management wins Airbus manufacturing facility job in Mobile, Ala.

Hoar Program Management wins Airbus manufacturing facility job in Mobile, Ala.


February 1, 2013


Airbus Appoints Program Manager for its Mobile Assembly Line

Alabama-based Company Now Responsible for All Aspects of Facility’s Construction

 

February 1, 2013: Airbus  announced the selection of Hoar Program Management (HPM), an Alabama-based company, as program manager for its A320 Family assembly line in Mobile, Alabama. In this role, HPM will be responsible for managing all aspects of the design and construction of the facility, including supporting procurement of design and construction service providers and suppliers. Construction is scheduled to begin this summer.

HPM’s staff has been responsible for total projects valued in excess of $3.5 billion in recent years. HPM currently has offices in Birmingham, Huntsville and Mobile, Alabama; Houston, Texas; Nashville, Tennessee; Tampa, Florida; and Charlotte, North Carolina. The company is well known as a distinct leader and provider of program management services, serving clients such as Regions Bank, Auburn University, the University of Alabama, Mobile Infirmary, the City of Mobile, Disney, Apple, Coca-Cola and Alabama Power.  

“After a vigorous competitive process, we’ve reached another major milestone with the appointment of a program manager,” said Airbus Americas Chairman Allan McArtor. “Working together with Hoar, we are ready to begin construction on Airbus’ first industrial facility in the U.S. Once finished, the new A320 assembly facility will be the most modern and technologically advanced in Airbus’ global assembly network.”

“This is truly an honor and a privilege,” said Mike Lanier, President of HPM. “Our folks have been working for months learning about Airbus, getting to understand their needs, their North American strategy, and how this complex in Mobile fits into their global strategy. Each of us is humbled at this selection and the opportunity and responsibility we have been given to lead this project. I believe our selection for this assignment is a testament to the outstanding people we have in our firm and the passion they bring to their roles in serving each of our clients every day. Airbus is the latest to recognize the value we add to their projects and the leadership our teams provide.”

On July 2, 2012 Airbus announced it will establish a manufacturing facility in the United States to assemble and deliver A319, A320 and A321 aircraft. Located at the Brookley Aeroplex in Mobile, Alabama, it will be the company’s first U.S.-based production facility. The assembly line, which will create jobs and strengthen the aerospace industry, is part of its strategy to enhance Airbus’ global competitiveness by meeting the growing needs of its customers in the United States and elsewhere.

Aircraft assembly is planned to start in 2015, with first deliveries from the Mobile facility beginning in 2016. Airbus anticipates the facility will produce between 40 and 50 aircraft per year by 2018

About Airbus Americas: Airbus manufactures the most modern and eco-efficient family of airliners available, ranging from 100 to over 500 seats. At its facilities in Wichita, Kansas and Mobile, Alabama, Airbus Americas helps engineer the entire product line. Additionally, Airbus supports, trains and sells to customers in the Americas from its centers in suburban Washington D.C. and Miami. Airbus has spent more than $140 billion in the U.S. since 1990 with hundreds of American suppliers in more than 40 states.

About Hoar Program Management (HPM): HPM was created in the mid 1990s as a way to offer years of comprehensive capital project experience to clients who lack sufficient professional design and construction management staff. HPM works with clients in the manufacturing, industrial, healthcare, institutional, retail and commercial markets.

Related Stories

| Oct 27, 2010

Grid-neutral education complex to serve students, community

MVE Institutional designed the Downtown Educational Complex in Oakland, Calif., to serve as an educational facility, community center, and grid-neutral green building. The 123,000-sf complex, now under construction on a 5.5-acre site in the city’s Lake Merritt neighborhood, will be built in two phases, the first expected to be completed in spring 2012 and the second in fall 2014.

| Oct 21, 2010

GSA confirms new LEED Gold requirement

The General Services Administration has increased its sustainability requirements and now mandates LEED Gold for its projects.

| Oct 18, 2010

World’s first zero-carbon city on track in Abu Dhabi

Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.

| Oct 13, 2010

Editorial

The AEC industry shares a widespread obsession with the new. New is fresh. New is youthful. New is cool. But “old” or “slightly used” can be financially profitable and professionally rewarding, too.

| Oct 13, 2010

Test run on the HP Z200 SFF Good Value in a Small Package

Contributing Editor Jeff Yoders tests a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.

| Oct 13, 2010

Prefab Trailblazer

The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.

| Oct 13, 2010

Thought Leader

Sundra L. Ryce, President and CEO of SLR Contracting & Service Company, Buffalo, N.Y., talks about her firm’s success in new construction, renovation, CM, and design-build projects for the Navy, Air Force, and Buffalo Public Schools.

| Oct 13, 2010

Hospital tower gets modern makeover

The Wellmont Holston Valley Medical Center in Kingsport, Tenn., expanded its D unit, a project that includes a 243,443-sf addition with a 12-room operating suite, a 36-bed intensive care unit, and an enlarged emergency department.

| Oct 13, 2010

Modern office design accentuates skyline views

Intercontinental|Exchange, a Chicago-based financial firm, hired design/engineering firm Epstein to create a modern, new 31st-floor headquarters.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021