HMC Architects has named James Krueger, AIA, NCARB, as the firm’s new director of design. Assuming the role previously occupied by the late Lance Hosey, Krueger will oversee design and lead strategies to add to the impact of HMC’s work.
Formerly serving as design principal, where he led projects for HMC’s PreK-12 and civic practices, Krueger’s creative approach emphasizes the firm’s purpose of “design for good” to support clients with high-performance solutions that aim to have a positive impact.
EMPHASIS ON IMPACT, NOT JUST IMAGE
“I am honored and excited to have James leading design at HMC,” said Brian Staton, HMC president and CEO. “He is a highly talented designer whose work is a testament to everything HMC strives to be. His commitment to carry on Lance’s vision – that architecture should be as much about impact as it is about image – is the perfect step forward.”
A graduate of California Polytechnic State University, Pomona, Krueger received his Bachelor of Architecture degree in 2001 and began his career as a junior designer at HMC that same year.
He was one of the founding members of HMC’s Emerging Leaders Forum, where he served as vice-chair. He also recently served as an advisor to HMC’s Board of Directors.
Krueger’s award-winning portfolio of projects includes the County of San Diego’s North Coastal Live Well Health Center, Irvine Unified School District’s Portola High School, the City of San Clemente Marine Safety Headquarters, and the Quail Hill Community Center in Irvine, Calif.
Krueger has maintained a close connection with Cal Poly Pomona, his alma mater, where he has co-taught vertical studios and participates regularly in design reviews.
LIVING UP TO LANCE HOSEY'S PRINCIPLES
According to Krueger, "The facilities we design have an incredible opportunity to positively impact the communities we serve, and it’s our job to bring that philosophy to everything we create.
“I am incredibly fortunate to have had Lance Hosey as my mentor for the past 14 months, and I truly believe in the design and leadership principles that he helped clarify for us at HMC,” said Krueger. “It’s my mission to live up to those principles and I am honored to share the joy of ‘designing for good’ with project teams across the firm.
Related Stories
| Sep 13, 2010
Second Time Around
A Building Team preserves the historic facade of a Broadway theater en route to creating the first green playhouse on the Great White Way.
| Sep 13, 2010
Palos Community Hospital plans upgrades, expansion
A laboratory, pharmacy, critical care unit, perioperative services, and 192 new patient beds are part of Palos (Ill.) Community Hospital's 617,500-sf expansion and renovation.
| Sep 13, 2010
China's largest single-phase hospital planned for Shanghai
RTKL's Los Angles office is designing the Shanghai Changzheng New Pudong Hospital, which will be the largest new hospital built in China in a single phase.
| Sep 13, 2010
Richmond living/learning complex targets LEED Silver
The 162,000-sf living/learning complex includes a residence hall with 122 units for 459 students with a study center on the ground level and communal and study spaces on each of the residential levels. The project is targeting LEED Silver.
| Sep 13, 2010
World's busiest land port also to be its greenest
A larger, more efficient, and supergreen border crossing facility is planned for the San Ysidro (Calif.) Port of Entry to better handle the more than 100,000 people who cross the U.S.-Mexico border there each day.
| Sep 13, 2010
Triple-LEED for Engineering Firm's HQ
With more than 250 LEED projects in the works, Enermodal Engineering is Canada's most prolific green building consulting firm. In 2007, with the firm outgrowing its home office in Kitchener, Ont., the decision was made go all out with a new green building. The goal: triple Platinum for New Construction, Commercial Interiors, and Existing Buildings: O&M.
| Sep 13, 2010
Stadium Scores Big with Cowboys' Fans
Jerry Jones, controversial billionaire owner of the Dallas Cowboys, wanted the team's new stadium in Arlington, Texas, to really amp up the fan experience. The organization spent $1.2 billion building a massive three-million-sf arena that seats 80,000 (with room for another 20,000) and has more than 300 private suites, some at field level-a first for an NFL stadium.
| Sep 13, 2010
'A Model for the Entire Industry'
How a university and its Building Team forged a relationship with 'the toughest building authority in the country' to bring a replacement hospital in early and under budget.