flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Historic church will be part of new condo building in D.C.

Historic church will be part of new condo building in D.C.

Sorg Architects released a plan to incorporate a historic church into a new condo project


By BD+C Staff | January 29, 2014
sorg architects, d.c., churches, sorg
Photo: Courtesy of Sorg Architects

In Washington D.C., a new condo building is slated to go up alongside a historic church—and incorporate the church into its design.

Sorg Architects unveiled a design scheme for 40 condos in a six-story building, which will wrap around the church. The church itself is designated a historic site. Four residential units will be built within, one for each floor. Sorg has already done extensive renovations and structural work on the church, given that it acquired the structure in 2006 and has been planning this condo building ever since. (In 2006, the firm presented a similar design to the Historic Presentation Review Board, but the project was shelved during the recession.)

Sorg presented the design for the project on Monday January 27, and it was approved by the Advisory Neighborhood Committee 1B, along with two zoning variances. However, a committee member objected to the design, comparing it to other generic-looking condo buildings in the D.C. area.

Sorg Architects principal Suman Sorg responded that the core of the complex’s design is dictated by the church, and that the finished project would likely look very different from the presented rendering.

“The materiality of this building will be very different,” said said, according to Urban Turf. “Since the basic structure is sort of prescribed, we feel we can accentuate (the architecture) with the material choices.”

The two zoning variances the firm is pursuing involve the rear setback of the building and the lot occupancy, which in the current plan is 10 percent higher than dictated.

Related Stories

| Oct 18, 2011

St. Martin’s Episcopal School expands facilities

  Evergreen commences construction on environmentally sustainable campus expansion.

| Oct 17, 2011

THOUGHT LEADER: Allan Bilka, Senior Staff Architect and Secretariat to the IGCC

Allan Bilka, RA, is a Senior Staff Architect and Secretariat to the International Green Construction Code (IgCC) with the International Code Council, based in the ICC’s Chicago district office. He also serves as staff liaison to the ICC-700 National Green Building Standard. He has written several ICC white papers on green building and numerous green-related articles for the ICC. A registered architect, Bilka has over 30 years of combined residential design/build and commercial consulting engineering experience.

| Oct 17, 2011

Austin's newest urban apartment complex under construction

Complex sits on a four-acre waterfront site along Lady Bird Lake with spectacular city and lake views, and is slated to open spring 2013.

| Oct 17, 2011

Aerialogics announces technology partnership with CertainTeed Corp.

  CertainTeed to provide Aerialogics’ Aerial Measurement Services to its credentialed contractor base and utilize the technology in its Roofing Products Division.

| Oct 17, 2011

Big D Floor covering supplies to offer Johnsonite Products??

Strategic partnership expands offering to south and west coast customers. 

| Oct 17, 2011

Clery Act report reveals community colleges lacking integrated mass notification systems

  “Detailed Analysis of U.S. College and University Annual Clery Act Reports” study now available. 

| Oct 17, 2011

USGBC L.A. Chapter's Green Gala to feature Jason McLennan as keynote speaker

  Chapter to presents inaugural Sustainable Innovation Awards,

| Oct 17, 2011

Schneider Electric introduces UL924 emergency lighting control devices

The emergency lighting control devices require fewer maintenance costs and testing requirements than backup batteries because they comply with the UL924 standard, reducing installation time. 

| Oct 14, 2011

AISC develops new interoperability strategy to move construction industry forward

AISC is working to bring that vision to reality by developing a three-step interoperability strategy to evaluate data exchanges and integrate structural steel information into buildingSMART's Industry Foundation Classes.

boombox1
boombox2
native1

More In Category



Urban Planning

The magic of L.A.’s Melrose Mile

Great streets are generally not initially curated or willed into being. Rather, they emerge organically from unintentional synergies of commercial, business, cultural and economic drivers. L.A.’s Melrose Avenue is a prime example. 


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021