flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Historic church will be part of new condo building in D.C.

Historic church will be part of new condo building in D.C.

Sorg Architects released a plan to incorporate a historic church into a new condo project


By BD+C Staff | January 29, 2014
sorg architects, d.c., churches, sorg
Photo: Courtesy of Sorg Architects

In Washington D.C., a new condo building is slated to go up alongside a historic church—and incorporate the church into its design.

Sorg Architects unveiled a design scheme for 40 condos in a six-story building, which will wrap around the church. The church itself is designated a historic site. Four residential units will be built within, one for each floor. Sorg has already done extensive renovations and structural work on the church, given that it acquired the structure in 2006 and has been planning this condo building ever since. (In 2006, the firm presented a similar design to the Historic Presentation Review Board, but the project was shelved during the recession.)

Sorg presented the design for the project on Monday January 27, and it was approved by the Advisory Neighborhood Committee 1B, along with two zoning variances. However, a committee member objected to the design, comparing it to other generic-looking condo buildings in the D.C. area.

Sorg Architects principal Suman Sorg responded that the core of the complex’s design is dictated by the church, and that the finished project would likely look very different from the presented rendering.

“The materiality of this building will be very different,” said said, according to Urban Turf. “Since the basic structure is sort of prescribed, we feel we can accentuate (the architecture) with the material choices.”

The two zoning variances the firm is pursuing involve the rear setback of the building and the lot occupancy, which in the current plan is 10 percent higher than dictated.

Related Stories

| Jan 15, 2012

Hollister Construction Services oversees interior office fit-out for Harding Loevner

The work includes constructing open space areas, new conference, trading and training rooms, along with multiple kitchenettes. 

| Jan 15, 2012

Smith Consulting Architects designs Flower Hill Promenade expansion in Del Mar, Calif.

The $22 million expansion includes a 75,000-square-foot, two-story retail/office building and a 397-car parking structure, along with parking and circulation improvements and new landscaping throughout.

| Jan 15, 2012

535 Madison Avenue achieves LEED Gold certification

Class-A commercial building meets sustainability requirements of LEED Program.

| Jan 12, 2012

CSHQA receives AIA Northwest & Pacific Region Merit Award for Idaho State Capitol restoration

After a century of service, use, and countless modifications which eroded the historical character of the building and grounds, the restoration brought the 200,000-sf building back to its former grandeur by restoring historical elements, preserving existing materials, and rehabilitating spaces for contemporary uses.

| Jan 12, 2012

Stellar earns construction industry's most prestigious safety award

Now widely accepted as the construction industry's standard measure of safety performance, the STEP awards were established in 1989 to evaluate and improve safety practices and recognize outstanding safety efforts. 

| Jan 12, 2012

Building independence: New take on female power

Memoir explores historic engineering project, women's empowerment era.

| Jan 12, 2012

3M takes part in Better Buildings Challenge

As a partner in the challenge, 3M has committed to reduce energy use by 25% in 78 of its plants, encompassing nearly 38 million-sf of building space.

| Jan 11, 2012

DOE announces guide for 50% more energy efficient retail buildings

The 50% AEDG series provides a practical approach for designers and builders of retail stores, and other major commercial building types, to achieve 50% energy savings compared to the building energy code used in many parts of the nation. 

| Jan 11, 2012

Mortenson starts construction of Rim Rock Wind Project

Renewable energy contractor to build 189-megawatt wind project in Sunburst, Mont.

| Jan 9, 2012

FGM Architects acquires SRBL Architects

The firm reviewed gaps in each of the markets and identified a need in the municipal market for stronger police facility design expertise as well as additional project management and design expertise for this market.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021