In Washington D.C., a new condo building is slated to go up alongside a historic church—and incorporate the church into its design.
Sorg Architects unveiled a design scheme for 40 condos in a six-story building, which will wrap around the church. The church itself is designated a historic site. Four residential units will be built within, one for each floor. Sorg has already done extensive renovations and structural work on the church, given that it acquired the structure in 2006 and has been planning this condo building ever since. (In 2006, the firm presented a similar design to the Historic Presentation Review Board, but the project was shelved during the recession.)
Sorg presented the design for the project on Monday January 27, and it was approved by the Advisory Neighborhood Committee 1B, along with two zoning variances. However, a committee member objected to the design, comparing it to other generic-looking condo buildings in the D.C. area.
Sorg Architects principal Suman Sorg responded that the core of the complex’s design is dictated by the church, and that the finished project would likely look very different from the presented rendering.
“The materiality of this building will be very different,” said said, according to Urban Turf. “Since the basic structure is sort of prescribed, we feel we can accentuate (the architecture) with the material choices.”
The two zoning variances the firm is pursuing involve the rear setback of the building and the lot occupancy, which in the current plan is 10 percent higher than dictated.
Related Stories
| Mar 1, 2012
8 tips for architects to consider before LED installation
Lighting experts offer Building Team members critical information to consider before upgrading lighting systems to LEDs.
| Mar 1, 2012
Reconstruction Awards: Reinvesting in a neighborhood’s future
The reconstruction of a near-century-old derelict public works facility in Minneapolis earns LEED Platinum—and the hearts and minds of the neighboring community.
| Mar 1, 2012
7 keys to ‘Highest value, lowest cost’ for healthcare construction
The healthcare design and construction picture has been muddied by uncertainty over the new healthcare law. Hospital systems are in a bind, not knowing what levels of reimbursement to expect. Building Teams serving this sector will have to work even harder to meet growing client demands.
| Mar 1, 2012
Cornell shortlists six architectural firms for first building on tech campus
Each of the firms will be asked to assemble a team of consultants and prepare for an interview to discuss their team’s capabilities to successfully design the university’s project.
| Mar 1, 2012
Aragon Construction completes 67,000-sf build-out in NYC
Aragon constructed the space in partnership with Milo Kleinberg Design Associates, (MKDA) and the Craven Corp. as the owner’s representative.
| Mar 1, 2012
Bomel completes design-build parking complex at U.C. San Diego
The $24-million facility, which fits into a canyon setting on the university’s East Campus, includes 1,200 stalls in two adjoining garages and a soccer field on a top level.
| Mar 1, 2012
Eidco Construction bolsters Chicago office
Eldco hires Peterson and Vivoda as senior project managers.
| Mar 1, 2012
Reconstruction of L.A.’s Dunbar Hotel underway
Withee Malcolm Architects’ designs for the project include the complete renovation of the Dunbar Hotel and the Somerville Apartments I and II.
| Feb 29, 2012
C.W. Driver opens new office, appoints Castillo regional SVP
Castillo will oversee projects with new and existing clients in northern California within the areas of education, healthcare/biomedical, public sector, military contracting, entertainment, retail, corporate and hospitality.
| Feb 29, 2012
Report says BIPV glass market to reach $6.4 billion by 2016
The report analyzes the opportunities for BIPV glass products using c-Si, thin-film and OPV/DSC materials and provides eight-year forecasts in terms of MW and square footage shipped as well as forecasts of revenue generated.