flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

HGA renovates Rowing Center at Cornell University

HGA renovates Rowing Center at Cornell University

Renovation provides state-of-the-art waterfront facility.


By By BD+C Staff | December 19, 2011
The 31,360-square-foot renovation consists of a two-story addition housing separate locker rooms for the three teams, shower roo

The Cornell University Rowing teams have been on a winning streak recently. Since 2006, the men’s lightweight crew has won threeIRA (Intercollegiate Rowing Association) national championship crowns while the men’s heavyweight and women’s teams have medaled at national regattas and continued to improve their competitive standing.

Now the teams have an expanded Rowing Center to match their athletic gains.

Designed by HGA Architects and Engineers (HGA), Cornell’s updated Rowing Center overlooking Lake Cayuga in Ithaca, N.Y, repositions two existing boathouses into an advanced training facility that competes with the best in the nation.

Cornell’s crews include approximately 150 athletes on three teams—Men’s Heavyweight, Men’s Lightweight, and Women’s. The rowing facility had consisted of the two-story, 15,000-square-foot Collyer Boathouse built in 1957 for the men’s teams, and the adjacent one-story, 5,000-square-foot Robison Boathouse built in 1979 for the women’s team.

While serving their purpose well over the years, the boathouses lacked the infrastructure to fully support the growing teams—especially compared to newer facilities by competitors. The women’s crew, for instance, had tripled since it became a varsity team in the 1970s, yet the locker rooms were one-third the size of the men’s. In addition, neither building had adequate boat storage or indoor training equipment, with the crews splitting training between the Cayuga Inlet and Teagle Hall Fitness Center.

Cornell conducted an earlier study that recommended razing the boathouses for a new facility. However, when funding sources weren't adequate for this plan, the college cut back and looked for other options. Working with HGA, Cornell was able to arrive at a solution that fit the needs of the school, the athletic department, and the crews.

The 31,360-square-foot renovation consists of a two-story addition housing separate locker rooms for the three teams, shower rooms,  laundry facility, a Tradition Room displaying crew memorabilia, and meeting spaces. It is connected to the Collyer Boathouse via a two-story entrance lobby with a second-floor bridge. An outdoor gathering space connects to the lobby.

Collyer’s second-floor has been converted to a multi-purpose training room with state-of-the-art exercise equipment and weightlifting stations. The first level houses boat storage, waterfront offices for coaches, a water safety room, and repair bay.

Robison Boathouse, meanwhile, was cleared of its outdated locker room and offices and now functions solely as rowing shell and equipment storage. Doors were added to the backside of both original buildings to allow the teams to load shell trailers for event travel from the parking lot. The new door at Collyer even allows the teams to pull a loaded trailer into the boat bay in December to streamline departures for winter training. A new launch storage building completes the set of three structures.

Throughout Collyer and the addition, large windows overlook the water and oversized graphics and bold red accents emphasize Big Red traditions. The locker rooms include off-the-shelf resin lockers customized with integral venting and on-demand heating to allow the staff to dry damp rowing gear overnight and exhaust odors fully within the locker.

Exterior upgrades work within the existing buildings’ style and massing. HGA replaced wooden doors with glass doors to open the interior to views of the water, replaced and reconfigured upper windows, repaired stonework, and added metal standing-seam roofs over the three structures to architecturally unify them and provide durable performance over the long term. The crisp existing color palette of nautical white paint, local bluestone accent panels and Cornell Red trim was restored and extended to the addition.

The site itself presented structural challenges due to the soft load-bearing soil conditions. With marginal soil-bearing capacity and bedrock far below affordable levels to reach with piers, HGA's team designed a system that pre-loaded the site to force settlement before pouring a three-foot-thick concrete-slab mat foundation for the addition. New structural framing for the addition cantilevers toward Collyer without actually bearing on the existing structure.

And while Collyer was structurally sound, HGA reinforced the joists on the second level to support increased capacity for the weight-lifting stations.

The project provides significant savings for the Athletic Department through a number of sustainable features, including an upgraded exterior envelope with added insulation and thermal-pane windows, energy-efficient fixtures, room occupancy sensors, lighting control systems, and an air-to-air heat exchanger to temper the high fresh air loads. In addition, the tight site integrates native plantings and pervious pavement to treat surface storm water and creates a right-of-way for the Cayuga Waterfront Trail, a public bike/pedestrian path.

Since its dedication this summer, the Rowing Center has proved a winner on all counts. The Athletic Department has a cost-efficient facility that provides effective training and team support, adds much-needed boat storage, upholds the University’s gender equity standards, preserves the heritage of the existing structures, and provides an outstanding environment for recruiting and alumni events.

HGA directed architecture, interior, structural, mechanical and electrical services. HGA’s project team included d’Andre Willis, AIA, principal and project manager; Loren Ahles, FAIA, project lead designer; Kendra Beaubien, AIA, project architect; Kevin Allebach, RA, project architect; Amy Tasch, LEED AP, interior designer; Sarah Jorczak, PE, structural engineer; Lance Kempf, PE, mechanical engineer; and Ben Gutierrez, electrical. The team also included Welliver McGuire, Inc., general contractor; CHA, civil engineer; and CHA, landscape architect. BD+C

Related Stories

University Buildings | May 10, 2024

UNC Chapel Hill’s new medical education building offers seminar rooms and midsize classrooms—and notably, no lecture halls

The University of North Carolina at Chapel Hill has unveiled a new medical education building, Roper Hall. Designed by The S/L/A/M Collaborative (SLAM) and Flad Architects, the UNC School of Medicine’s new building intends to train new generations of physicians through dynamic and active modes of learning.

Sustainability | May 10, 2024

Perkins&Will’s first ESG report discloses operational performance data across key metrics

Perkins&Will recently released its first ESG report that discloses the firm’s operational performance data across key metrics and assesses its strengths and opportunities.

MFPRO+ News | May 10, 2024

HUD strengthens flood protection rules for new and rebuilt residential buildings

The U.S. Department of Housing and Urban Development (HUD) issued more stringent flood protection requirements for new and rebuilt homes that are developed with, or financed with, federal funds. The rule strengthens standards by increasing elevations and flood-proofing requirements of new properties in areas at risk of flooding. 

Government Buildings | May 10, 2024

New federal buildings must be all-electric by 2030

A new Biden Administration rule bans the use of fossil fuels in new federal buildings beginning in 2030. The announcement came despite longstanding opposition to the rule by the natural gas industry. 

Sustainable Development | May 10, 2024

Nature as the city: Why it’s time for a new framework to guide development

NBBJ leaders Jonathan Ward and Margaret Montgomery explore five inspirational ideas they are actively integrating into projects to ensure more healthy, natural cities.

Mass Timber | May 8, 2024

Portland's Timberview VIII mass timber multifamily development will offer more than 100 affordable units

An eight-story, 72,000-sf mass timber apartment building in Portland, Ore., topped out this winter and will soon offer over 100 affordable units. The structure is the tallest affordable housing mass timber building and the first Type IV-C affordable housing building in the city. 

Architects | May 8, 2024

Ivan O’Garro, AIA joins LEO A DALY as a vice president

Integrated design firm LEO A DALY welcomes Ivan O’Garro, AIA, as a vice president and managing principal of its Atlanta studio.

K-12 Schools | May 7, 2024

World's first K-12 school to achieve both LEED for Schools Platinum and WELL Platinum

A new K-12 school in Washington, D.C., is the first school in the world to achieve both LEED for Schools Platinum and WELL Platinum, according to its architect, Perkins Eastman. The John Lewis Elementary School is also the first school in the District of Columbia designed to achieve net-zero energy (NZE). 

Healthcare Facilities | May 6, 2024

Hospital construction costs for 2024

Data from Gordian breaks down the average cost per square foot for a three-story hospital across 10 U.S. cities.

Biophilic Design | May 6, 2024

The benefits of biophilic design in the built environment

Biophilic design in the built environment supports the health and wellbeing of individuals, as they spend most of their time indoors.

boombox1
boombox2
native1

More In Category




Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021