flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

HGA-designed hotel becomes one of the tallest buildings in Rochester, Minn.

Hotel Facilities

HGA-designed hotel becomes one of the tallest buildings in Rochester, Minn.

The project is part of the city’s Destination Medical Center initiative.


By David Malone, Associate Editor | February 12, 2020
Hilton Lobby

All photos: Peter J. Sieger

The Hilton Rochester Mayo Clinic Area hotel is now open in Rochester, Minn. 

The 264-room, 20-story hotel is one of the first completed projects in Rochester’s Destination Medical Center initiative – a public-private partnership to position Rochester as the world’s leading destination for health and wellness. The hotel offers a blend of dining, hospitality, conferencing, and wellness options for area residents, the business community, and medical tourism. 

 

Hilton Ballroom

 

The 371,000-sf, L-shaped tower’s first five floors offer visitors retail options, two grand ballrooms, a 24-hour fitness center with a heated infinity pool, a spa, and an outdoor terrace. Two restaurants will also be included. 

A two-way steel truss system and specialized vibration analysis methods allowed the design team to stack two 9,000-sf ballrooms on top of each other to create more space for conferences and programs. The solution lowered the height of the building by 10 feet compared to a traditional truss system, resulting in significant cost savings.

 

HIlton rochester lobby

 

See Also: New York City’s largest freestanding cancer center opens

 

Building amenities and features include:

Level 1

Guest check-in, hotel lobby, business center, Pittsburgh Blue, 

The Social Wine and Martini Bar, support spaces

 

Level 2

Skyway and parking ramp access, retail, offices, J. Powers at the Hilton,

Benedict’s restaurant, Cambria showroom, Healing Touch Spa 

 

Level 3

Ballroom 1 and pre-function space

 

Level 4

Ballroom 2 and flexible break-out space

 

Level 5

24-hour fitness center with heated, indoor infinity pool; sauna; steam room; roof terrace

 

Levels 6-15

Guest room and corner suites

 

Levels 16-18

Executive levels, connected via an internal stair, with access to an Executive Lounge 

 

Level 19

Governor and Presidential Suites, VIP Lounge

 

Level 20

Elevator machine room and mechanical penthouse

 

Hilton Pool

 

Titan Development & Investments and Harbor Bay Real Estate Advisors were the project developers. Kraus-Anderson was the cm.

 

 

Related Stories

Mixed-Use | Feb 13, 2015

First Look: Sacramento Planning Commission approves mixed-use tower by the new Kings arena

The project, named Downtown Plaza Tower, will have 16 stories and will include a public lobby, retail and office space, 250 hotel rooms, and residences at the top of the tower. 

Codes and Standards | Feb 12, 2015

New Appraisal Institute form aids in analysis of green commercial building features

The Institute’s Commercial Green and Energy Efficient Addendum offers a communication tool that lenders can use as part of the scope of work. 

Architects | Feb 11, 2015

Shortlist for 2015 Mies van der Rohe Award announced

Copenhagen, Berlin, and Rotterdam are the cities where most of the shortlisted works have been built. 

| Jan 20, 2015

Daring hotel design scheme takes the shape of cut amethyst stone

The Dutch practice NL Architects designed a proposal for a chain of hotels shaped like a rock cut in half to reveal a gemstone inside. 

| Jan 2, 2015

Construction put in place enjoyed healthy gains in 2014

Construction consultant FMI foresees—with some caveats—continuing growth in the office, lodging, and manufacturing sectors. But funding uncertainties raise red flags in education and healthcare.

| Dec 28, 2014

AIA course: Enhancing interior comfort while improving overall building efficacy

Providing more comfortable conditions to building occupants has become a top priority in today’s interior designs. This course is worth 1.0 AIA LU/HSW.

| Dec 28, 2014

7 fresh retail design strategies

Generic ‘boxes’ and indifferent service won’t cut it with today’s savvy shoppers. Retailers are seeking a technology-rich-but-handmade vibe, plus greater speed to market and adaptability. 

| Dec 2, 2014

Nonresidential construction spending rebounds in October

This month's increase in nonresidential construction spending is far more consistent with the anecdotal information floating around the industry, says ABC's Chief Economist Anirban Basu.

| Nov 29, 2014

20 tallest towers that were never completed

Remember the Chicago Spire? What about Russia Tower? These are two of the tallest building projects that were started, but never completed, according to the Council on Tall Buildings and Urban Habitat. The CTBUH Research team offers a roundup of the top 20 stalled skyscrapers across the globe.

| Oct 16, 2014

Perkins+Will white paper examines alternatives to flame retardant building materials

The white paper includes a list of 193 flame retardants, including 29 discovered in building and household products, 50 found in the indoor environment, and 33 in human blood, milk, and tissues.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021