flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

HGA Architects & Engineers moves offices in San Francisco

HGA Architects & Engineers moves offices in San Francisco

HGA’s San Francisco office has grown by nearly 25% in the past two years, adding shared expertise to the 120-person California practice, which includes the Sacramento and Los Angeles offices.


By Posted by Tim Gregorski, Senior Editor | September 19, 2012

 HGA Architects and Engineers (HGA) has relocated to expanded offices in San Francisco to accommodate its growing practice serving healthcare, higher education and cultural clients. HGA’s San Francisco office has grown by nearly 25% in the past two years, adding shared expertise to the 120-person California practice, which includes the Sacramento and Los Angeles offices.

The new office is located in an eight-story, brick-and-masonry commercial building at 170 Maiden Lane at Union Square. The 7,400-sf, full-floor office on the fifth floor features an open studio environment with flexible work stations, two conference rooms, high ceilings and operable windows that offer abundant daylight and natural ventilation. Finishes and detailing feature a design-forward image, with LEED Certification anticipated.

The San Francisco office was established in 2000 to pursue cultural and higher education work, and in 2007 the firm acquired Thistlethwaite Architectural Group (TAG) to strengthen its healthcare portfolio in northern California.

HGA’s recent northern California projects include Lucile Packard Children’s Hospital Addition at Stanford under construction in Palo Alto, Calif.; a new Medical Office Building for Kaiser Permanente in San Ramon, Calif.; the Student Services Center at Monterey Peninsula College; and the Performing Arts Center at Napa Valley College. +

Related Stories

| Jan 27, 2012

Columbia University’s New Core Laboratory aims for LEED Silver

Construction manager Sordoni Construction Co. along with the design team of Payette Architects and Vanderweil Engineers will provide design and construction services to renovate the majority of the existing Core Lab building to create the new Lamont Center for Bio-Geochemistry.

| Jan 26, 2012

Three dead, 16 missing in Rio buildings collapse

The buildings, one 20 floors high, collapsed on Wednesday night in a cloud of dust and smoke just one block away from the city's historic Municipal Theater.

| Jan 26, 2012

Siemens launches smoke detection knowledge center

New knowledge center web site demonstrates efficacy of smoke detection. 

| Jan 26, 2012

Hendrick Construction completes Osso Restaurant in Charlotte

Designed by François Fossard, Osso's upscale interior includes tapered, twisted decorative columns and an elegant fireplace in the center of the lounge. 

| Jan 26, 2012

HOK partners with USGBC on design of Haiti children's center

Passive design principles give form to a sustainable, restorative environment for the children of Haiti.

| Jan 26, 2012

American Standard names Gould as president and CEO

Gould succeeds Don Devine, who led the successful turnaround of American Standard Brands.

| Jan 26, 2012

Summit Design+Build completes law office in Chicago

Applegate & Thorne-Thomsen's new office suite features private offices, open office area, conference rooms, reception area, exposed wood beams and columns, and exposed brick. 

| Jan 24, 2012

New iPad app ready for prime time

Siemens’ versatile application connects users to APOGEE BAS control and monitoring functions via wireless network connectivity. The application directly interacts with BACnet/IP and Siemens APOGEE P2 field panels. 

| Jan 24, 2012

Vyhanek joins Thornton Tomasetti’s Kansas City office

Vyhanek will assemble a new MEP team in the Midwest to support Building Performance and Property Loss Consulting practices. 

| Jan 24, 2012

U of M installs new lighting at Crisler Player Development Center

Energy efficient lighting installed at PDC reduce costs and improves player performance.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021