flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Herzog & de Meuron’s triangle tower stirs controversy in Paris

High-rise Construction

Herzog & de Meuron’s triangle tower stirs controversy in Paris

The 590-foot glass pyramid building will include a 120-room hotel, 754,000 sf of office space, and cultural facilities.


By BD+C Staff | July 13, 2015
Herzog & de Meuron’s triangle tower design stirs controversy in Paris

Residents of the Porte de Versailles neighborhood, in Paris’ 15th arrondissement where the tower is proposed, claim the tower will overshadow them. Renderings courtesy Herzog & de Meuron

More than 40 years have passed since the last skyscraper in Paris, the Tour Montparnasse, was built.

Earlier this month news spread that city officials have approved the construction of a 590-foot tower designed by Swiss practice Herzog & de Meuron, the creative minds behind Beijing’s Bird’s Nest for the 2008 Olympics and London’s Tate Modern museum. The design was originally rejected by the same committee in November 2014, Dezeen reports.

Herzog & de Meuron's scheme for the new addition to Paris’ skyline is a triangular tower with a trapezoid base made of glass. It is proposed for Paris’ 15th arrondissement, in the Porte de Versailles neighborhood. However, according to Dezeen, residents of the neighborhood criticized the building, saying it will overshadow them. Moreover, some politicians alleged that the design is unsustainable.

The project is backed by developer Unibail-Rodamco, and will include a 120-room hotel, 754,000 sf of office space, and cultural facilities, costing $720 million, News.com.au reports.

Pro-development mayor of Paris Anne Hidalgo tweeted that she is “proud and happy that Triangle can be born in Paris.” She estimates 5,000 jobs will be created during construction, and an additional 5,000 jobs once the building is completed, planned for 2018.

 

Related Stories

| Jul 9, 2012

Modular Construction Delivers Model for New York Housing in Record Time

A 65-unit supportive housing facility in Brooklyn, N.Y., was completed in record time using modular construction with six stories set in just 12 days.

| Jul 2, 2012

San Francisco lays claim to the greenest building in North America

The 13-floor building can hold around 900 people, but consumes 60% less water and 32% less energy than most buildings of its kind.

| Jun 13, 2012

Thornton Tomasetti founding principals receive CTBUH Fazlur R. Khan Lifetime Achievement Medal

This is the first time the CTBUH Board of Trustees has awarded the prize to two individuals jointly.

| Jun 6, 2012

KPF designs tower for Yongsan IBD

The master plan, created by Studio Daniel Libeskind, is a dynamic urban environment containing contributions from 19 different architects practicing in diverse locations around the globe.

| Jun 6, 2012

SOM urges Chicago tenants to partner with landlords to cut energy use

Tenants can exceed building energy challenge targets recently announced by Mayor Emanuel.

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

| May 15, 2012

One World Trade Center goes to new height of sustainability

One of the biggest challenges in developing this concrete mixture was meeting the Port Authority of New York/New Jersey’s strict requirement for the replacement of cement.

boombox1
boombox2
native1

More In Category



Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021