Herzog & de Meuron has unveiled its design for the revamping of the Basel, Germany, campus of pharmaceutical giant Roche. The project includes the addition of a 205-meter-high tower and research center.
The corporate headquarters of the research-focused campus is already under construction, according to Dezeen. This first building, which will begin operation in 2015, will make up four blocks. The HQ will accommodate 950 office and 950 laboratory workstations.
"With the Roche area development plan, we see a basic principle of our work realized, and that is densification," said the architecture firm said in a statement.
The development will also involve the renovation of an historic office building designed by Swiss architect Otto R. Salvisber in 1937. The building's original facade will be preserved, a priority for the owners.
Related Stories
| May 30, 2012
Hill International to manage construction of Al Risafa Stadium in Iraq
The three-year contract has an estimated value to Hill of approximately $3.3 million.
| May 29, 2012
Torrance Memorial Medical Center’s pediatric burn patients create their version of new Patient Tower using Legos
McCarthy workers joined the patients, donning construction gear and hard hats, to help with their building efforts.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 29, 2012
AIA expands Documents-On-Demand service??
Six new documents added, DOD offers nearly 100 contract documents.
| May 29, 2012
Legrand achieves over 20% energy-intensity reduction in Presidential Challenge
West Hartford headquarters announced as Better Buildings, Better Plants “Showcase” site.
| May 29, 2012
Thornton Tomasetti/Fore Solutions provides consulting for Phase I of Acadia Gateway Center
Project receives LEED Gold certification.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| May 24, 2012
Gilbane’s Spring 2012 economic report identifies multiple positive economic and market factors
Anticipating increasing escalation in owner costs through 2014.
| May 24, 2012
Construction backlog declines 5.4% in the first quarter of 2012?
The nation’s nonresidential construction activity will remain soft during the summer months, with flat to declining nonresidential construction spending.