flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Herzog & de Meuron completes Switzerland’s largest children’s hospital

Healthcare Facilities

Herzog & de Meuron completes Switzerland’s largest children’s hospital

The new University Children’s Hospital Zurich features 114 rooftop patient rooms designed like wooden cottages with their own roofs.


By Novid Parsi, Contributing Editor  | October 8, 2024
Herzog & de Meuron completes Switzerland’s largest children’s hospital, Photo: © Maris Mezulis, courtesy Herzog & de Meuron
Photo: © Maris Mezulis, courtesy Herzog & de Meuron

With 114 rooms, the new University Children’s Hospital Zurich is the largest healthcare facility for children and adolescents in Switzerland. Located in a residential neighborhood, the roughly CHF761 million (US$887 million) project comprises two buildings: an acute care hospital and a research and teaching facility.

The acute care hospital functions like a town, with the medical specialties as neighborhoods. On each of the hospital’s three floors, a central main street runs past the green courtyard, providing orientation and allowing sunlight into the building. 

The patient rooms are located on the hospital’s top floor. Each room has been designed like a wooden cottage with its own roof—providing both privacy and a view of the outdoors. The staggered rooms have rooftops at varying inclines, emphasizing the singular identity of each patient. The rooms also offer enough space for parents to spend the night with their children.

The hospital’s abundant daylight, outdoor views, and biophilic design aim to contribute to healing, according to a statement from the design architect, Herzog & de Meuron.

The white, cylindrical teaching and research building features an open, five-story atrium in the center. The research fields are arranged around this central core to encourage collaboration and communication. The building has one 320-seat lecture hall and two 100-seat seminar rooms, as well as study areas. With movable walls, the lecture/seminar rooms, lobby, and café can be reconfigured to form one large event space that can accommodate 670 people. On the floors above, research laboratories and accompanying offices have unobstructed views of the surrounding landscape.

Boulders unearthed during construction have been placed in and around the buildings. The project team also planted over 250 trees. 

On the building team:
Design architect: Herzog & de Meuron
Architect of record: ARGE KISPI (Herzog & de Meuron and Gruner)
Electrical engineer: Amstein + Walthert
Plumbing engineer: Ingenieurbüro Riesen
Structural engineer: ZPF Ingenieure
Building automation and smart building: Jobst Willers Engineering
Construction manager: Gruner

Herzog & de Meuron completes Switzerland’s largest children’s hospital, Photo: © Maris Mezulis, courtesy Herzog & de Meuron
Photo: © Maris Mezulis, courtesy Herzog & de Meuron
Herzog & de Meuron completes Switzerland’s largest children’s hospital, Photo: © Maris Mezulis, courtesy Herzog & de Meuron
Photo: © Maris Mezulis, courtesy Herzog & de Meuron
Herzog & de Meuron completes Switzerland’s largest children’s hospital, Photo: © Maris Mezulis, courtesy Herzog & de Meuron
Photo: © Maris Mezulis, courtesy Herzog & de Meuron
Herzog & de Meuron completes Switzerland’s largest children’s hospital, Photo: © Maris Mezulis, courtesy Herzog & de Meuron
Photo: © Maris Mezulis, courtesy Herzog & de Meuron
Herzog & de Meuron completes Switzerland’s largest children’s hospital, Photo: © Herzog & de Meuron, Foto Michael Schmidt
© Herzog & de Meuron, Foto Michael Schmidt
Herzog & de Meuron completes Switzerland’s largest children’s hospital, Photo: © Herzog & de Meuron, Foto Michael Schmidt
© Herzog & de Meuron, Foto Michael Schmidt
Herzog & de Meuron completes Switzerland’s largest children’s hospital, courtesy Herzog & de Meuron
© Herzog & de Meuron
Herzog & de Meuron completes Switzerland’s largest children’s hospital, Photo: © Maris Mezulis, courtesy Herzog & de Meuron
Photo: © Maris Mezulis, courtesy Herzog & de Meuron

 

Related Stories

| Oct 21, 2014

Hartford Hospital plans $150 million expansion for Bone and Joint Institute

The bright-white structures will feature a curvilinear form, mimicking bones and ligament. 

| Oct 16, 2014

Perkins+Will white paper examines alternatives to flame retardant building materials

The white paper includes a list of 193 flame retardants, including 29 discovered in building and household products, 50 found in the indoor environment, and 33 in human blood, milk, and tissues.

| Oct 15, 2014

Harvard launches ‘design-centric’ center for green buildings and cities

The impetus behind Harvard's Center for Green Buildings and Cities is what the design school’s dean, Mohsen Mostafavi, describes as a “rapidly urbanizing global economy,” in which cities are building new structures “on a massive scale.” 

| Oct 13, 2014

Debunking the 5 myths of health data and sustainable design

The path to more extensive use of health data in green building is blocked by certain myths that have to be debunked before such data can be successfully incorporated into the project delivery process.

| Oct 12, 2014

AIA 2030 commitment: Five years on, are we any closer to net-zero?

This year marks the fifth anniversary of the American Institute of Architects’ effort to have architecture firms voluntarily pledge net-zero energy design for all their buildings by 2030. 

| Oct 8, 2014

Massive ‘healthcare village’ in Nevada touted as world’s largest healthcare project

The $1.2 billion Union Village project is expected to create 12,000 permanent jobs when completed by 2024.  

| Oct 3, 2014

Designing for women's health: Helping patients survive and thrive

In their quest for total wellness, women today are more savvy healthcare consumers than ever before. They expect personalized, top-notch clinical care with seamless coordination at a reasonable cost, and in a convenient location. Is that too much to ask? 

| Sep 29, 2014

10 common deficiencies in aging healthcare facilities

VOA's Douglas King pinpoints the top issues that arise during healthcare facilities assessments, including missing fire/smoke dampers, out-of-place fire alarms, and poorly constructed doorways. 

| Sep 25, 2014

Look to history warily when gauging where the construction industry may be headed

Precedents and patterns may not tell you all that much about future spending or demand.

| Sep 24, 2014

Architecture billings see continued strength, led by institutional sector

On the heels of recording its strongest pace of growth since 2007, there continues to be an increasing level of demand for design services signaled in the latest Architecture Billings Index.

boombox1
boombox2
native1

More In Category



Healthcare Facilities

New El Paso VA healthcare center includes 47 departments, brain and spinal cord injury treatment services

A new 492,000 sf Veterans Administration ambulatory care facility on the William Beaumont Army Medical Center campus near El Paso, Texas will include 47 medical departments and provide brain and spinal cord injury treatment services. A design-build team of Clark Construction, SmithGroup, and HKS is spearheading the project that recently broke ground with anticipated completion in 2028.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021