flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Hermosa Village earns 2021 NAHB Best in American Living Award

Multifamily Housing

Hermosa Village earns 2021 NAHB Best in American Living Award

Hermosa Village, a 238-unit apartment complex in Leander, Texas, won top honors in this year's BALA competition in the low-rise multifamily rental category.


By Malcolm Crumbley, Associate Editor | March 15, 2022
Hermosa Village Exterior
Hermosa Village stands out in the category of "Multifamily Developments Up to 3-stories Rent."

Cadence McShane Construction Company has announced that its Hermosa Village Apartments received first place in this year's National Association of Home Builders (NAHB) Best in American Living Award, in the category of "Multifamily Developments Up to 3-stories for Rent."

The project was selected out of hundreds of BALA entries based on the criteria of exterior and interior design, efficient land use, site plan creativity, building plans, innovative material application, and the ability to meet the client needs.

Hermosa Village Exterior Design
The "farmhouse" design of Hermosa Village captured the attention of the BALA judges.

Hermosa Village, in Leander, Texas, was completed by Cadence McShane in 2020. The apartment complex features 238 garden-style units that are designed to resemble farmhouses.

Retort-style pool
The large retort-style pool is one of the many stand-out amenities of Hermosa Village.

NUMEROUS AMENITIES FOR RESIDENTS TO ENJOY 

  • Custom European cabinets 
  • Oversized walk-In closets
  • ENERGY STAR stainless steel appliances
  • Quartz countertops
  • Private patios
  • Direct-access garages
  • LED lighting
  • Large retort-style pool
  • Fitness center
  • Outdoor kitchen (four grills)
  • Bark park (Half acre)
  • Community farm
  • Herb garden

Hermosa Village is also a 100% electric vehicle–ready apartment complex, the first of its kind in Texas.

Uniquely designed
The community farm at Hermosa Village, which was constructed by Cadence McShane.

 

Related Stories

Coronavirus | May 26, 2020

Multifamily developers report mounting delays in permitting and starts due to coronavirus pandemic

More than half (53%) of multifamily developer respondents reported construction delays in the jurisdictions where they operate, according to the third edition of the National Multifamily Housing Council (NMHC) COVID-19 Construction Survey.

Multifamily Housing | May 8, 2020

Nashville's newest residential tower will rise 416 feet

Goettsch Partners is designing the project.  

Multifamily Housing | May 8, 2020

'Lakehouse' is the first multifamily project in Colorado to receive WELL Precertification

Stantec and Muñoz + Albin are the project's architects.  

Senior Living Design | May 5, 2020

5 memory care communities with a strong sense of mission

Communities in California, Colorado, Florida, Maryland, and Virginia display excellence in memory care facility development, design, and construction.

Multifamily Housing | Apr 23, 2020

Tankless water heaters: 12 things to know about these energy savers for multifamily housing

Twelve factors to consider in using tankless water heaters in multifamily housing.

Multifamily Housing | Apr 20, 2020

Multifamily market flattens as construction proposal activity sinks

Multifamily has consistently been one of the strongest performers among 58 submarkets measured in PSMJ Resources’ quarterly survey.

Coronavirus | Apr 15, 2020

COVID-19 alert: 93% of renters in professionally managed multifamily housing paid some or all of their rent, says NMHC

In its second survey of 11.5 million units of professionally managed apartment units across the country, the National Multifamily Housing Council (NMHC) found that 84% of apartment households made a full or partial rent payment by April 12, up 15 percentage points from April 5.

Multifamily Housing | Apr 15, 2020

Related Group picks Stantec to design and engineer Manor Miramar residences in Florida

Related Group picks Stantec to design and engineer Manor Miramar residences in Florida.

Coronavirus | Apr 5, 2020

COVID-19: Most multifamily contractors experiencing delays in projects due to coronavirus pandemic

The NMHC Construction Survey is intended to gauge the magnitude of the disruption caused by the COVID-19 outbreak on multifamily construction.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021