flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Heated debate over whether Calif.’s prevailing wage requirement stymies affordable housing

Codes and Standards

Heated debate over whether Calif.’s prevailing wage requirement stymies affordable housing

There’s disagreement around how much pay regulations add to cost of projects.


By Peter Fabris, Contributing Editor | May 30, 2017

Photo: Pixabay

As a shortage of affordable housing plagues California, the state’s mandates that developers pay prevailing wage on most taxpayer-subsidized low-income housing projects are a source of contentious debate.

The cost of constructing low-income housing in California now averages $332,000 per unit. In an effort to determine the causes of high price tags on these projects, in 2014 the state released a report that officially said the impact of prevailing wage couldn’t be determined.

But one of the consultants hired to do the study says that projects that paid prevailing wage were 11% more expensive to build. Labor economists were able to convince the state of enough uncertainties in the prevailing wage analysis so that the study didn’t reach a firm conclusion on the issue, according to the Los Angeles Times.

The prevailing wage requirement continues to have strong support in the state legislature.  Governor Jerry Brown’s housing plan failed last year in large part because of the Building Trades’ opposition to a relaxation of prevailing wage requirements, the Times says. This year, legislators have introduced more limited versions of Brown’s proposal that include prevailing wage requirements.

Related Stories

Codes and Standards | Feb 1, 2022

Biden Administration launches state, local coalition to boost building performance standards

Will focus on energy efficiency and electrification across the buildings sector.

Codes and Standards | Jan 26, 2022

Downtown digital twin to aid Las Vegas in setting policy priorities

Will be used to address energy use, emissions, traffic, parking, noise, and emergency management.

Codes and Standards | Jan 25, 2022

Modeling tool helps compare options for HVAC systems when little known about a building

Compares projected costs and energy usage for all HVAC systems and hot water consumption.

Codes and Standards | Jan 25, 2022

Critics slam proposed revamp of California’s solar net energy metering rate

Could make rooftop solar panels unaffordable for most customers.

Sponsored | Resiliency | Jan 24, 2022

Norshield Products Fortify Critical NYC Infrastructure

New York City has two very large buildings dedicated to answering the 911 calls of its five boroughs. With more than 11 million emergency calls annually, it makes perfect sense. The second of these buildings, the Public Safety Answering Center II (PSAC II) is located on a nine-acre parcel of land in the Bronx. It’s an imposing 450,000 square-foot structure—a 240-foot-wide by 240-foot-tall cube. The gleaming aluminum cube risesthe equivalent of 24 stories from behind a grassy berm, projecting the unlikely impression that it might actually be floating. Like most visually striking structures, the building has drawn as much scorn as it has admiration. 

Codes and Standards | Jan 24, 2022

N.Y. governor calls for ban on natural gas in new buildings

Action follows New York City’s ban.

Codes and Standards | Jan 19, 2022

EPA may expand product lineup that can earn WaterSense label

Would include systems that enhance water quality at the tap.

Codes and Standards | Jan 19, 2022

Canada’s Trudeau seeking building codes changes, net-zero emissions building strategy

Prime minister also wants net-zero electricity grid by 2035.

Codes and Standards | Jan 18, 2022

Greater emphasis on building materials needed to achieve net-zero carbon offices

Engineered wood, straw, and bamboo can be keys to achieving goal.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021