flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

‘Healing Oasis’ will provide healthcare services to veterans in northern California

Healthcare Facilities

‘Healing Oasis’ will provide healthcare services to veterans in northern California

Hoefer Wysocki designed the $40 million facility.


By David Malone, Associate Editor | December 19, 2017
VA outpatient clinic San Jose

Rendering courtesy Hoefer Wysocki

A 95,000-sf, three-story healthcare facility is currently under construction directly adjacent to the 101 Freeway overlooking a wooded park site in San Jose, Calif. The $40 million V.A. San Jose Community-Based Outpatient Clinic will provide veterans and their families with healthcare services.

The building is being designed as a “healing oasis” that is inspired by scenic views of the Santa Cruz Mountains. It will allow patients, families, and care providers to connect with the outdoors via a park and other outdoor recreational areas. “The concept is based on incorporating air, light and space so the design becomes a part of the healing process for patients,” says Hosam Habib, AIA, Lead Designer, Hoefer Wysocki, in a release.

 

Interior of the new VA Outpatient Clinic San JoseRendering courtesy Hoefer Wysocki.

 

The space will use a modular floor plan to separate patient and staff corridors, which reduces noise and activity levels and contributes to a better healing environment.

The first floor will include general registration, imaging, a lab and pharmacy, and a mental health outpatient clinic. The second floor will be designed for outpatient services including primary care, audiology and speech pathology, podiatry, optometry, and dermatology. The third floor will be dedicated to specialty services such as a women’s health clinic. An outdoor terrace will also be located on the third floor to provide a space for patients, their families, and clinic staff to relax. The campus will also feature a memorial park to honor and thank veterans for their service.

 

Exterior view from Memorial ParkRendering courtesy Hoefer Wysocki.

 

The clinic is under construction and scheduled for occupancy in first quarter 2018. The Building Team includes Smith and Boucher (MEP), BKF (CE), BDC (structural engineer), and Gates and Associates (landscape consultant).

 

Main Lobby of the VA Outpatient Clinic San JoseRendering courtesy Hoefer Wysocki.

Related Stories

| Jul 28, 2014

Reconstruction market benefits from improving economy, new technology [2014 Giants 300 Report]

Following years of fairly lackluster demand for commercial property remodeling, reconstruction revenue is improving, according to the 2014 Giants 300 report.

| Jul 28, 2014

Reconstruction Sector Construction Firms [2014 Giants 300 Report]

Structure Tone, Turner, and Gilbane top Building Design+Construction's 2014 ranking of the largest reconstruction contractor and construction management firms in the U.S.

| Jul 28, 2014

Reconstruction Sector Engineering Firms [2014 Giants 300 Report]

Jacobs, URS, and Wiss, Janney, Elstner top Building Design+Construction's 2014 ranking of the largest reconstruction engineering and engineering/architecture firms in the U.S.

| Jul 28, 2014

Reconstruction Sector Architecture Firms [2014 Giants 300 Report]

Stantec, HDR, and HOK top Building Design+Construction's 2014 ranking of the largest reconstruction architecture and architecture/engineering firms in the U.S.

| Jul 28, 2014

LEO A DALY hires Peter Yakowicz to oversee VA projects

New hire will work with healthcare and federal market sectors on programs specifically for the Department of Veterans Affairs.

| Jul 23, 2014

Holistic care model, regulatory changes make outpatient facilities a high priority [2014 Giants 300 Report]

With the Affordable Care Act still in its infancy, Building Teams are seeing reverberations in the investment decisions of healthcare providers, including new ideas about the types of buildings they are asked to create.

| Jul 23, 2014

Top Healthcare Sector Construction Firms [2014 Giants 300 Report]

Turner, McCarthy, and Skanska USA top Building Design+Construction's 2014 ranking of the largest healthcare contractors and construction management firms in the U.S.

| Jul 23, 2014

Top Healthcare Sector Engineering Firms [2014 Giants 300 Report]

AECOM, Jacobs, and URS Corp. top Building Design+Construction's 2014 ranking of the largest healthcare engineering and engineering/architecture firms in the U.S.

| Jul 23, 2014

Top Healthcare Sector Architecture Firms [2014 Giants 300 Report]

HDR, Stantec, and HKS top Building Design+Construction's 2014 ranking of the largest healthcare architecture and architecture/engineering firms in the U.S.

boombox1
boombox2
native1

More In Category

Healthcare Facilities

Watch on-demand: Key Trends in the Healthcare Facilities Market for 2024-2025

Join the Building Design+Construction editorial team for this on-demand webinar on key trends, innovations, and opportunities in the $65 billion U.S. healthcare buildings market. A panel of healthcare design and construction experts present their latest projects, trends, innovations, opportunities, and data/research on key healthcare facilities sub-sectors. A 2024-2025 U.S. healthcare facilities market outlook is also presented.




Mass Timber

British Columbia hospital features mass timber community hall

The Cowichan District Hospital Replacement Project in Duncan, British Columbia, features an expansive community hall featuring mass timber construction. The hall, designed to promote social interaction and connection to give patients, families, and staff a warm and welcoming environment, connects a Diagnostic and Treatment (“D&T”) Block and Inpatient Tower.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021