A 95,000-sf, three-story healthcare facility is currently under construction directly adjacent to the 101 Freeway overlooking a wooded park site in San Jose, Calif. The $40 million V.A. San Jose Community-Based Outpatient Clinic will provide veterans and their families with healthcare services.
The building is being designed as a “healing oasis” that is inspired by scenic views of the Santa Cruz Mountains. It will allow patients, families, and care providers to connect with the outdoors via a park and other outdoor recreational areas. “The concept is based on incorporating air, light and space so the design becomes a part of the healing process for patients,” says Hosam Habib, AIA, Lead Designer, Hoefer Wysocki, in a release.
Rendering courtesy Hoefer Wysocki.
The space will use a modular floor plan to separate patient and staff corridors, which reduces noise and activity levels and contributes to a better healing environment.
The first floor will include general registration, imaging, a lab and pharmacy, and a mental health outpatient clinic. The second floor will be designed for outpatient services including primary care, audiology and speech pathology, podiatry, optometry, and dermatology. The third floor will be dedicated to specialty services such as a women’s health clinic. An outdoor terrace will also be located on the third floor to provide a space for patients, their families, and clinic staff to relax. The campus will also feature a memorial park to honor and thank veterans for their service.
Rendering courtesy Hoefer Wysocki.
The clinic is under construction and scheduled for occupancy in first quarter 2018. The Building Team includes Smith and Boucher (MEP), BKF (CE), BDC (structural engineer), and Gates and Associates (landscape consultant).
Rendering courtesy Hoefer Wysocki.
Related Stories
Healthcare Facilities | Jul 6, 2015
The main noisemakers in healthcare facilities: behavior and technology
Over the past few decades, numerous research studies have concluded that noise in hospitals can have a deleterious effect on patient care and recovery.
University Buildings | Jun 29, 2015
Ensuring today’s medical education facilities fit tomorrow’s healthcare
Through thought-leading design, medical schools have the unique opportunity to meet the needs of today’s medical students and more fully prepare them for their future healthcare careers. Perkins+Will’s Heidi Costello offers five key design factors to improve and influence medical education.
Sponsored | Healthcare Facilities | Jun 23, 2015
Texas eye surgery center captures attention in commercial neighborhood
The team wanted to build an eye surgery center in an already established area but provide something clean and fresh compared to neighboring buildings.
Healthcare Facilities | Jun 16, 2015
Heatherwick’s design for cancer center branch has ‘healing power’
The architect describes it as “a collection of stepped planter elements”
Healthcare Facilities | May 27, 2015
Roadmap for creating an effective sustainability program in healthcare environments
With a constant drive for operational efficiencies and reduction of costs under an outcome-based healthcare environment, there are increasing pressures to ensure that sustainability initiatives are not only cost effective, but socially and environmentally responsible. CBRE's Dyann Hamilton offers tips on establishing a strong program.
Healthcare Facilities | May 27, 2015
Rochester, Minn., looks to escape Twin Cities’ shadow with $6.5 billion biotech development
The 20-year plan would also be a boon to Mayo Clinic, this city’s best-known address.
Healthcare Facilities | Apr 28, 2015
10 things about Ebola from Eagleson Institute's infectious disease colloquium
Research institutions know how to handle life-threatening, highly contagious diseases like Ebola in the lab, but how do we handle them in healthcare settings?
Green | Apr 22, 2015
AIA Committee on the Environment recognizes Top 10 Green Projects
Seattle's Bullitt Center and the University Center at The New School are among AIA's top 10 green buildings for 2015.
Building Team Awards | Apr 10, 2015
14 projects that push AEC teaming to the limits
From Lean construction to tri-party IPD to advanced BIM/VDC coordination, these 14 Building Teams demonstrate the power of collaboration in delivering award-winning buildings. These are the 2015 Building Team Award winners.
Building Team Awards | Apr 10, 2015
Prefab saves the day for Denver hospital
Mortenson Construction and its partners completed the 831,000-sf, $623 million Saint Joseph Hospital well before the January 1, 2015, deadline, thanks largely to their extensive use of offsite prefabrication.