A 95,000-sf, three-story healthcare facility is currently under construction directly adjacent to the 101 Freeway overlooking a wooded park site in San Jose, Calif. The $40 million V.A. San Jose Community-Based Outpatient Clinic will provide veterans and their families with healthcare services.
The building is being designed as a “healing oasis” that is inspired by scenic views of the Santa Cruz Mountains. It will allow patients, families, and care providers to connect with the outdoors via a park and other outdoor recreational areas. “The concept is based on incorporating air, light and space so the design becomes a part of the healing process for patients,” says Hosam Habib, AIA, Lead Designer, Hoefer Wysocki, in a release.
Rendering courtesy Hoefer Wysocki.
The space will use a modular floor plan to separate patient and staff corridors, which reduces noise and activity levels and contributes to a better healing environment.
The first floor will include general registration, imaging, a lab and pharmacy, and a mental health outpatient clinic. The second floor will be designed for outpatient services including primary care, audiology and speech pathology, podiatry, optometry, and dermatology. The third floor will be dedicated to specialty services such as a women’s health clinic. An outdoor terrace will also be located on the third floor to provide a space for patients, their families, and clinic staff to relax. The campus will also feature a memorial park to honor and thank veterans for their service.
Rendering courtesy Hoefer Wysocki.
The clinic is under construction and scheduled for occupancy in first quarter 2018. The Building Team includes Smith and Boucher (MEP), BKF (CE), BDC (structural engineer), and Gates and Associates (landscape consultant).
Rendering courtesy Hoefer Wysocki.
Related Stories
Coronavirus | Apr 26, 2020
PCL Construction rolls out portable coronavirus testing centers
The prefabricated boxes offer walk-up and drive-thru options.
Coronavirus | Apr 21, 2020
COVID-19 update: CallisonRTKL, Patriot, PODS, and USACE collaborate on repurposed containers for ACFs
CallisonRTKL and PODS collaborate on repurposed containers for ACFs
Coronavirus | Apr 14, 2020
COVID-19 alert: Missouri’s first Alternate Care Facility ready for coronavirus patients
Missouri’s first Alternate Care Facility ready for coronavirus patients
Coronavirus | Apr 10, 2020
COVID-19: Converting existing hospitals, hotels, convention centers, and other alternate care sites for coronavirus patients
COVID-19: Converting existing unused or underused hospitals, hotels, convention centers, and other alternate care sites for coronavirus patients
Coronavirus | Apr 9, 2020
COVID-19 alert: Robins & Morton to convert Miami Beach Convention Center into a 450-bed field hospital
COVID-19 alert: Robins & Morton to convert Miami Beach Convention Center into a 450-bed field hospital
Coronavirus | Apr 4, 2020
COVID-19: Construction completed on first phase of Chicago's McCormick Place into Alternate Care Facility
Walsh Construction, one of the largest contractors in the city of Chicago and in the United States, is leading the temporary conversion of a portion of the McCormick Place Convention Center into an Alternate Care Facility (ACF) for novel coronavirus patients. Construction on the first 500 beds was completed on April 3.
Coronavirus | Apr 1, 2020
TLC’s Michael Sheerin offers guidance on ventilation in COVID-19 healthcare settings
Ventilation engineering guidance for COVID-19 patient rooms
Healthcare Facilities | Mar 29, 2020
A ‘roadmap’ for building hospitals in rural and underfunded markets
Hoar Construction’s formula emphasizes preconstruction planning and input from healthcare workers.
Healthcare Facilities | Mar 27, 2020
Designing healthcare for surge capacity
We believe that part of the longer-term answer lies not just with traditional health providers, but in the potential of our cities and communities to adapt and change.
Modular Building | Mar 17, 2020
Danish hospital is constructed from 24 steel frame modules
Onsite construction was completed in two weeks.