flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

HDR acquires healthcare design-build firm Cooper Medical

HDR acquires healthcare design-build firm Cooper Medical


March 3, 2011

HDR, a global architecture, engineering and consulting firm, has announced it has acquired Cooper Medical, a firm providing integrated design and construction services for healthcare facilities throughout the U.S. The new alliance, HDR Cooper Medical, will provide a full service design and construction delivery model to healthcare clients ranging from small outpatient clinics and specialty centers to large multi-specialty clinics as well as critical access and community hospitals.

“Economic conditions and pending healthcare legislation will undoubtedly foster continued growth in the integrated design and construction market for medical facilities,” said Doug Wignall, International Director of Healthcare for HDR. “As that market sector grows, so too will the need for maximizing each facility’s operational efficiencies. HDR Cooper Medical will combine the design and planning expertise of HDR’s designers, planners and consultants with the design-build know-how of Cooper Medical. This new partnership will help ensure quality healthcare environments at an affordable cost to clients.”

Cooper Medical is based in Oklahoma City, OK, and provides feasibility/financing services, program management, design-build and construction management. Its operations will continue under the previous leadership of Steve Cooper and Chris Cooper.

“When architects and builders work together from the start, clients benefit,” noted Steve Cooper, Director of the combined company. “Better design, more cost effective facilities, shorter schedules, reduced risk, and no surprises are some of the advantages of an integrated approach to healthcare facility design and construction.”

“The combination of these two companies is a good fit, not only because of the complementary services we provide to the healthcare industry, but because both firms believe in a ‘client for life’ philosophy,” added Doug Lisak, President of HDR Constructors. “That attitude is further strengthened by our common emphasis on technical competence, reliability, and responsiveness to client expectations.”

Cooper Medical has successfully completed hundreds of projects including hospitals, medical office buildings, surgery centers, group practices, and diagnostic facilities. The firm currently employs 25 professionals who know the critical demands of complex healthcare facilities. Clients rely on the firm’s rigorous and thorough quality assurance program to ensure quality at every stage of construction, keeping projects on schedule and on budget. Safety is a priority as demonstrated by Cooper Medical’s excellent safety record.

For more information about HDR Cooper Medical, visit www.hdrcoopermed.com.

About HDR

HDR is a global leader in integrated multidisciplinary design. Its nearly 8,000 employee owners are located in more than 185 offices and represent hundreds of disciplines and partner on blended teams to provide integrated solutions for our clients beyond the scope of traditional A/E/C firms. For more than 50 years, HDR has delivered award-winning integrated healthcare planning and design for some of the world’s foremost medical centers and health systems. Its global healthcare practice uses evidence-based design methodologies to fully integrate clinical, operational and facility planning to support an organization's strategic objectives in design. HDR has been consistently ranked the No. 1 Healthcare Design firm because its clients rely on it for the advanced planning, programming and design expertise needed to deliver 21st-century healthcare. Visit www.hdrinc.com.

Related Stories

| Nov 3, 2010

Senior housing will be affordable, sustainable

Horizons at Morgan Hill, a 49-unit affordable senior housing community in Morgan Hill, Calif., was designed by KTGY Group and developed by Urban Housing Communities. The $21.2 million, three-story building will offer 36 one-bed/bath units (773 sf) and 13 two-bed/bath units (1,025 sf) on a 2.6-acre site.

| Nov 3, 2010

Designs complete for new elementary school

SchenkelShultz has completed design of the new 101,270-sf elementary Highlands Elementary School, as well as designs for three existing buildings that will be renovated, in Kissimmee, Fla. The school will provide 48 classrooms for 920 students, a cafeteria, a media center, and a music/art suite with outdoor patio. Three facilities scheduled for renovations total 19,459 sf and include an eight-classroom building that will be used as an exceptional student education center, a older media center that will be used as a multipurpose building, and another building that will be reworked as a parent center, with two meeting rooms for community use. W.G. Mills/Ranger is serving as CM for the $15.1 million project.

| Nov 3, 2010

Chengdu retail center offers a blend of old and new China

The first phase of Pearl River New Town, an 80-acre project in Chengdu, in China’s Wenjiang District, is under way along the banks of the Jiang’an River. Chengdu was at one time a leading center for broadcloth production, and RTKL, which is overseeing the project’s master planning, architecture, branding, and landscape architecture, designed the project’s streets, pedestrian pathways, and bridges to resemble a woven fabric.

| Nov 3, 2010

Rotating atriums give Riyadh’s first Hilton an unusual twist

Goettsch Partners, in collaboration with Omrania & Associates (architect of record) and David Wrenn Interiors (interior designer), is serving as design architect for the five-star, 900-key Hilton Riyadh.

| Nov 3, 2010

Virginia biofuel research center moving along

The Sustainable Energy Technology Center has broken ground in October on the Danville, Va., campus of the Institute for Advanced Learning and Research. The 25,000-sf facility will be used to develop enhanced bio-based fuels, and will house research laboratories, support labs, graduate student research space, and faculty offices. Rainwater harvesting, a vegetated roof, low-VOC and recycled materials, photovoltaic panels, high-efficiency plumbing fixtures and water-saving systems, and LED light fixtures will be deployed. Dewberry served as lead architect, with Lord Aeck & Sargent serving as laboratory designer and sustainability consultant. Perigon Engineering consulted on high-bay process labs. New Atlantic Contracting is building the facility.

| Nov 3, 2010

Dining center cooks up LEED Platinum rating

Students at Bowling Green State University in Ohio will be eating in a new LEED Platinum multiuse dining center next fall. The 30,000-sf McDonald Dining Center will have a 700-seat main dining room, a quick-service restaurant, retail space, and multiple areas for students to gather inside and out, including a fire pit and several patios—one of them on the rooftop.

| Nov 2, 2010

11 Tips for Breathing New Life into Old Office Spaces

A slowdown in new construction has firms focusing on office reconstruction and interior renovations. Three experts from Hixson Architecture Engineering Interiors offer 11 tips for office renovation success. Tip #1: Check the landscaping.

| Nov 2, 2010

Cypress Siding Helps Nature Center Look its Part

The Trinity River Audubon Center, which sits within a 6,000-acre forest just outside Dallas, utilizes sustainable materials that help the $12.5 million nature center fit its wooded setting and put it on a path to earning LEED Gold.

| Nov 2, 2010

A Look Back at the Navy’s First LEED Gold

Building Design+Construction takes a retrospective tour of a pace-setting LEED project.

| Nov 2, 2010

Wind Power, Windy City-style

Building-integrated wind turbines lend a futuristic look to a parking structure in Chicago’s trendy River North neighborhood. Only time will tell how much power the wind devices will generate.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021