flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

HDR acquires healthcare design-build firm Cooper Medical

HDR acquires healthcare design-build firm Cooper Medical


March 3, 2011

HDR, a global architecture, engineering and consulting firm, has announced it has acquired Cooper Medical, a firm providing integrated design and construction services for healthcare facilities throughout the U.S. The new alliance, HDR Cooper Medical, will provide a full service design and construction delivery model to healthcare clients ranging from small outpatient clinics and specialty centers to large multi-specialty clinics as well as critical access and community hospitals.

“Economic conditions and pending healthcare legislation will undoubtedly foster continued growth in the integrated design and construction market for medical facilities,” said Doug Wignall, International Director of Healthcare for HDR. “As that market sector grows, so too will the need for maximizing each facility’s operational efficiencies. HDR Cooper Medical will combine the design and planning expertise of HDR’s designers, planners and consultants with the design-build know-how of Cooper Medical. This new partnership will help ensure quality healthcare environments at an affordable cost to clients.”

Cooper Medical is based in Oklahoma City, OK, and provides feasibility/financing services, program management, design-build and construction management. Its operations will continue under the previous leadership of Steve Cooper and Chris Cooper.

“When architects and builders work together from the start, clients benefit,” noted Steve Cooper, Director of the combined company. “Better design, more cost effective facilities, shorter schedules, reduced risk, and no surprises are some of the advantages of an integrated approach to healthcare facility design and construction.”

“The combination of these two companies is a good fit, not only because of the complementary services we provide to the healthcare industry, but because both firms believe in a ‘client for life’ philosophy,” added Doug Lisak, President of HDR Constructors. “That attitude is further strengthened by our common emphasis on technical competence, reliability, and responsiveness to client expectations.”

Cooper Medical has successfully completed hundreds of projects including hospitals, medical office buildings, surgery centers, group practices, and diagnostic facilities. The firm currently employs 25 professionals who know the critical demands of complex healthcare facilities. Clients rely on the firm’s rigorous and thorough quality assurance program to ensure quality at every stage of construction, keeping projects on schedule and on budget. Safety is a priority as demonstrated by Cooper Medical’s excellent safety record.

For more information about HDR Cooper Medical, visit www.hdrcoopermed.com.

About HDR

HDR is a global leader in integrated multidisciplinary design. Its nearly 8,000 employee owners are located in more than 185 offices and represent hundreds of disciplines and partner on blended teams to provide integrated solutions for our clients beyond the scope of traditional A/E/C firms. For more than 50 years, HDR has delivered award-winning integrated healthcare planning and design for some of the world’s foremost medical centers and health systems. Its global healthcare practice uses evidence-based design methodologies to fully integrate clinical, operational and facility planning to support an organization's strategic objectives in design. HDR has been consistently ranked the No. 1 Healthcare Design firm because its clients rely on it for the advanced planning, programming and design expertise needed to deliver 21st-century healthcare. Visit www.hdrinc.com.

Related Stories

| Oct 4, 2012

Foundation tightens HMC Architects bond with local communities

Founded in 2009 with an initial endowment of $1.9 million, HMC’s nonprofit Designing Futures Foundation (DFF) has donated about $230,000 in its three years of existence, including $105,000 in scholarships to California students. The grants help promising high schoolers with an interest in architecture, design, engineering, education, or healthcare pay for expenses like test preparation services, computers, and college entrance exam fees and tuition. The scholarships can be extended for up to five years of college.

| Oct 4, 2012

Gilbane publishes Fall 2012 construction industry economic report

Report outlines fluctuation in construction spending; predicts continued movement toward recovery.

| Oct 3, 2012

Fifth public comment period now open for update to USGBC's LEED Green Building Program

LEED v4 drafts and the public comment tool are now available on the newly re-launched, re-envisioned USGBC.org website.

| Oct 2, 2012

Mirvish and Gehry unveil conceptual design to transform Toronto’s entertainment district

Reimagining of King Street Entertainment District supports Toronto’s cultural corridor.

| Oct 2, 2012

Dow Business Services Center building named 2012 “America’s Best Buildings of the Year” winner

Building constructed with air sealing and insulation products from Dow Building Solutions.

| Oct 2, 2012

Bernards working on project at L.A. White Memorial Medical Center

The new facility is a $15-million, 41,000-sf concrete structure which includes three stories of medical office space atop a three-level parking garage.

| Oct 1, 2012

Tyco completes separation process, now largest pure-play fire protection and security business

Tyco Integrated Security focused on delivering security solutions to commercial businesses.

| Sep 28, 2012

Seattle is home to first LEED-certified modular radiation center

By using modular construction and strategic site design, RAD Medical Systems built the first radiation center to receive LEED certification.

| Sep 26, 2012

EDITORIAL OPPORTUNITY – BD+C Greenbuild 2012 Issue

Your firm is invited to contribute to this special issue, which will be distributed at Greenbuild San Francisco, Nov. 14-16, 2012.

| Sep 24, 2012

Reed Construction completes Lafarge headquarters in Chicago

Reed Construction was contracted to complete the full third floor build-out which included the construction of new open area work space, private offices, four conference rooms with videoconferencing capabilities and an executive conference boardroom.

boombox1
boombox2
native1

More In Category




Resiliency

U.S. is reducing floodplain development in most areas

The perception that the U.S. has not been able to curb development in flood-prone areas is mostly inaccurate, according to new research from climate adaptation experts. A national survey of floodplain development between 2001 and 2019 found that fewer structures were built in floodplains than might be expected if cities were building at random.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021