flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

HDR acquires healthcare design-build firm Cooper Medical

HDR acquires healthcare design-build firm Cooper Medical


March 3, 2011

HDR, a global architecture, engineering and consulting firm, has announced it has acquired Cooper Medical, a firm providing integrated design and construction services for healthcare facilities throughout the U.S. The new alliance, HDR Cooper Medical, will provide a full service design and construction delivery model to healthcare clients ranging from small outpatient clinics and specialty centers to large multi-specialty clinics as well as critical access and community hospitals.

“Economic conditions and pending healthcare legislation will undoubtedly foster continued growth in the integrated design and construction market for medical facilities,” said Doug Wignall, International Director of Healthcare for HDR. “As that market sector grows, so too will the need for maximizing each facility’s operational efficiencies. HDR Cooper Medical will combine the design and planning expertise of HDR’s designers, planners and consultants with the design-build know-how of Cooper Medical. This new partnership will help ensure quality healthcare environments at an affordable cost to clients.”

Cooper Medical is based in Oklahoma City, OK, and provides feasibility/financing services, program management, design-build and construction management. Its operations will continue under the previous leadership of Steve Cooper and Chris Cooper.

“When architects and builders work together from the start, clients benefit,” noted Steve Cooper, Director of the combined company. “Better design, more cost effective facilities, shorter schedules, reduced risk, and no surprises are some of the advantages of an integrated approach to healthcare facility design and construction.”

“The combination of these two companies is a good fit, not only because of the complementary services we provide to the healthcare industry, but because both firms believe in a ‘client for life’ philosophy,” added Doug Lisak, President of HDR Constructors. “That attitude is further strengthened by our common emphasis on technical competence, reliability, and responsiveness to client expectations.”

Cooper Medical has successfully completed hundreds of projects including hospitals, medical office buildings, surgery centers, group practices, and diagnostic facilities. The firm currently employs 25 professionals who know the critical demands of complex healthcare facilities. Clients rely on the firm’s rigorous and thorough quality assurance program to ensure quality at every stage of construction, keeping projects on schedule and on budget. Safety is a priority as demonstrated by Cooper Medical’s excellent safety record.

For more information about HDR Cooper Medical, visit www.hdrcoopermed.com.

About HDR

HDR is a global leader in integrated multidisciplinary design. Its nearly 8,000 employee owners are located in more than 185 offices and represent hundreds of disciplines and partner on blended teams to provide integrated solutions for our clients beyond the scope of traditional A/E/C firms. For more than 50 years, HDR has delivered award-winning integrated healthcare planning and design for some of the world’s foremost medical centers and health systems. Its global healthcare practice uses evidence-based design methodologies to fully integrate clinical, operational and facility planning to support an organization's strategic objectives in design. HDR has been consistently ranked the No. 1 Healthcare Design firm because its clients rely on it for the advanced planning, programming and design expertise needed to deliver 21st-century healthcare. Visit www.hdrinc.com.

Related Stories

Contractors | Apr 20, 2015

Too many construction projects don’t meet owners’ expectations: KPMG report

Causes for delays, overruns, and underperformance include project management talent shortages, distrust between owners and contractors, and the lack of fully integrated project management systems.     

High-rise Construction | Apr 17, 2015

Construction begins on Goettsch Partners-designed Nanning China Resources Center Tower

The tower's design is derived from its multiple uses, which include 170,000 sm of Class A office space, 5,000 sm of boutique retail, and a 45,000-sm luxury Shangri-La hotel.

Museums | Apr 16, 2015

SANAA and Snøhetta tie at first place for Budapest museum bid

The two firms submitted designs for the New National Gallery and Ludwig Museum, one of five planned museums to be constructed in a park just outside the urban center of Hungary’s capital. 

High-rise Construction | Apr 16, 2015

Construction begins on Seattle's Tibet-inspired Potala Tower

Construction on the 41-story Potala Tower in Seattle finally kicked off following a ground-breaking ceremony seven months ago.

Architects | Apr 14, 2015

Jeanne Gang, Bjarke Ingels among participants for inaugural Chicago Architecture Biennial

Some big names include Bjarke Ingels Group and Studio Gang Architects

Sports and Recreational Facilities | Apr 13, 2015

USTA breaks ground on what will be the country’s largest tennis complex

The 63-acre facility is being positioned as a cornerstone for a sports innovation and performance district in Lake Nona, Fla., a 7,000-acre master planned community that continues to expand.

Building Team Awards | Apr 10, 2015

14 projects that push AEC teaming to the limits

From Lean construction to tri-party IPD to advanced BIM/VDC coordination, these 14 Building Teams demonstrate the power of collaboration in delivering award-winning buildings. These are the 2015 Building Team Award winners.

Building Team Awards | Apr 10, 2015

Prefab saves the day for Denver hospital

Mortenson Construction and its partners completed the 831,000-sf, $623 million Saint Joseph Hospital well before the January 1, 2015, deadline, thanks largely to their extensive use of offsite prefabrication.

Building Team Awards | Apr 10, 2015

Anaheim’s soaring intermodal hub

Anaheim's Regional Transportations Intermodal Center is the largest ETFE project in North America.

Building Team Awards | Apr 10, 2015

Virtual collaboration helps complete a hospital in 24 months

PinnacleHealth needed a new hospital STAT! This team delivered it in two years, start to finish.

boombox1
boombox2
native1

More In Category

Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021