flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

HBD Construction names Steven Meeks vice president

HBD Construction names Steven Meeks vice president

Meeks will provide expertise for the company in its many diverse areas of construction projects including health care, senior living, education and retail.


By By BD+C Staff | April 19, 2012
Steven Meeks
Steven Meeks
This article first appeared in the May 2012 issue of BD+C.

HBD Construction announced the hiring of Steven Meeks as vice president, a position that expands their leadership team at the company.

Meeks will provide expertise for the company in its many diverse areas of construction projects including health care, senior living, education and retail. HBD's promise of service includes senior leader involvement throughout every project.

Meeks has gained a wide variety of construction-related experience during his tenure in the industry. Prior to joining HBD, Meeks held several senior-level positions with leading construction companies in the St. Louis area. He has had a significant role in the following notable projects including: The Ballpark Hilton, River City Casino, Meramec Bluffs Retirement Community, and Gander Hall at Maryville University. Meeks, a native St. Louisan, obtained a Bachelor of Science degree in Civil Engineering from Washington University in 1979. BD+C

Related Stories

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 29, 2012

AIA expands Documents-On-Demand service??

Six new documents added, DOD offers nearly 100 contract documents.  

| May 29, 2012

Legrand achieves over 20% energy-intensity reduction in Presidential Challenge

West Hartford headquarters announced as Better Buildings, Better Plants “Showcase” site.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

| May 24, 2012

Gilbane’s Spring 2012 economic report identifies multiple positive economic and market factors

Anticipating increasing escalation in owner costs through 2014.

| May 24, 2012

Construction backlog declines 5.4% in the first quarter of 2012?

The nation’s nonresidential construction activity will remain soft during the summer months, with flat to declining nonresidential construction spending.

| May 24, 2012

Stellar completes St. Mark’s Episcopal Church and Day School renovation and expansion

The project united the school campus and church campus including a 1,200-sf chapel expansion, a new 10,000-sf commons building, 7,400-sf of new covered walkways, and a drop-off pavilion.

| May 23, 2012

MBI Modular Construction Campus Launched on BDCUniversity.com

White Papers, Case Studies, Industry Annual Reports, published articles and more are offered.

boombox1
boombox2
native1

More In Category




Resiliency

U.S. is reducing floodplain development in most areas

The perception that the U.S. has not been able to curb development in flood-prone areas is mostly inaccurate, according to new research from climate adaptation experts. A national survey of floodplain development between 2001 and 2019 found that fewer structures were built in floodplains than might be expected if cities were building at random.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021