HBD Construction has been chosen to build a new $12 million training facility campus for the Plumbers & Pipefitters Local 562. The current facility, located at the north St. Louis County headquarters, will be expanded to include two new buildings comprised of 97,000-sf of training and classroom space.
“The members of Local 562 are committed to the investment of this project, to ensure that our region will be served by a very highly skilled and well-trained, professional workforce for generations to come. This newly designed campus will significantly increase our capacity to serve 562 members and United Association members throughout the U.S. and Canada,” said John O’Mara, Business Manager for Local 562. “This year with Local 562 celebrating its centennial and HBD celebrating its 90th, there is a lot of tradition and history in this relationship. For a number of reasons, the board felt this was the right company for the job.”
HBD’s promise of service includes senior leader involvement throughout every project. HBD President Mike Perry will serve as Project Executive; Steve Meeks, Vice President, will serve as Project Director and Grant Smith will serve as Project Manager. The building team also includes M+H Architects, Jarrell Contracting and Guarantee Electric who will serve as the architect, design/build mechanical and design/build electrical contractor on this project. +
Related Stories
| Feb 29, 2012
Shepley Bulfinch selected to design new Children’s Hospital of Buffalo
The firm was selected because of their past experience in designing clinically complex facilities that emphasize patient- and family-centered care and operational efficiency as well as distinctive architectural forms for many other children's and women's hospitals.
| Feb 28, 2012
Roofing contractors recognized for workmanship
Sika Sarnafil announces Project of the Year winners; competition highlights visually stunning, energy efficient, and sustainable roofs.
| Feb 28, 2012
Waste Management awards companies for sustainable construction
This recognition, highlighting sustainable performances within the construction industry, looks to celebrate the builders who achieved important sustainability milestones in 2011, as determined by Waste Management’s online Diversion and Recycling Tracking Tool.
| Feb 28, 2012
Salem State University Library & Learning Commons topped off
When it opens to students in the fall of 2013, the $60 million facility will offer new archival space; circulation and reference areas; collections; reading spaces; study rooms; instruction labs and a Dean’s suite.
| Feb 28, 2012
More than 1,000 have earned EDAC certification since 2009
Milestone achieved as evidence-based design becomes a top 2012 strategy for healthcare organizations.
| Feb 28, 2012
McCarthy completes second phase of San Diego’s Scripps Hospital
Representing the second phase of a four-phased, $41.3 million expansion and remodeling project, the new addition doubles the size of the existing emergency department and trauma center to encompass a combined 27,000 square feet of space.
| Feb 28, 2012
LUMEnergi names Weinbaum president and CEO
Weinbaum’s experience spans communications, nanotechnology, electronics components, consumer products, semiconductors, software, wireless and lighting.
| Feb 28, 2012
Griffin Electric completes Medical University of South Carolina project
The 210,000-sf complex is comprised of two buildings, and houses research, teaching and office areas, plus conference spaces for the University.
| Feb 27, 2012
Consigli complete first building for Bigelow Ocean Sciences Campus
Designed by WBRC Architects Engineers in association with Perkins + Will.
| Feb 27, 2012
Hollister completes fit-out of 41,500-sf office space in Princeton, N.J.
Intricate interior project involved construction of more than 80 offices.