flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Hawaiian architecture firm chooses FRP trellis system over traditional materials

Hawaiian architecture firm chooses FRP trellis system over traditional materials

MGA Architecture plans to add five more trellis systems on the neighboring building. 


By By BD+C Staff | March 22, 2012
Strongwells products were used by Plas-Tech Ltd., a Hawaiian fabricator, for an
Strongwells products were used by Plas-Tech Ltd., a Hawaiian fabricator, for an architectural trellis overlooking Waikiki, Hono

Strongwell’s products were used by Plas-Tech Ltd., a Honolulu, Hawaii fabricator, for an architectural trellis overlooking Waikiki, Honolulu, Hawaii. The trellis sits on top of the Waikiki Shopping Plaza located at the center of the city on world-famous Kalakaua Avenue. The retail center is home to over 50 tenants including national brands GUESS and LeSportSac and also a number of local favorites such as Local Motion, Ukulele House, and Higgins Harte International Galleries.

MGA Architecture, Honolulu, Hawaii, specified the design of the trellis to use Strongwell’s EXTREN 2 x 6-½-in. rectangular tubes. Plas-Tech fabricated the trellis components by molding the outrigger beams and assembling and painting. MGA’s design was inspired by the native Hawaiian culture to evoke sensory response and emotional experience while blending in with the overly urban character of modern-day Waikiki. The trellis system was easily installed and both MGA and Plas-Tech are very happy with the finished product. MGA Architecture was so pleased with Strongwell’s FRP structural shapes, they have plans to add five more trellis systems on the neighboring building. They will also use Strongwell components for another future project.

Project Summary: Waikiki Shopping Plaza, Waikiki, Hawaii

BUILDING TEAM
Architect: MGA Architectures
Fabricator: Plas-Tech Ltd.
Product: Strongwell EXTREN 2 x 6-½-in. rectangular tubes

EXTREN is a proprietary combination of fiberglass reinforcements and thermosetting polyester or vinyl ester resin systems. It is produced in more than 100 standard shapes and has a surface veil to protect against glass fibers penetrating the resin surface in service and to increase corrosion and UV resistance. The features of EXTREN include: corrosion resistant, Low Conductivity – thermally and electrically, non-magnetic – electromagnetic transparency, lightweight, high strength, dimensional stability, and low maintenance.

The features of EXTREN include: corrosion resistant, low conductivity – thermally and electrically, non-magnetic – electromagnetic transparency, lightweight, high strength, dimensional stability, and low maintenance.

EXTREN is offered in three series designed for different environments and applications:

  • Series 500 – an all-purpose series utilizing an isophthalic polyester resin system with a UV inhibitor. Series 500 color is Olive Green
  • Series 525 – An all-purpose series utilizing a fire retardant isophthalic polyester resin system with a UV inhibitor. Series 525 color is Slate Gray (plus certain handrail and fixed ladder components in yellow)
  • Series 625 - A premium series both fire retardant and highly corrosion resistant utilizing a vinyl ester resin system with a UV inhibitor. Series 625 color is Beige

For more information, contact Strongwell at 276-645-8000, webmaster@strongwell.com or visit www.strongwell.com. BD+C

Related Stories

| Aug 7, 2012

Pankow names Lum new CEO

Lum joined Pankow in 1980 in Hawaii and has held leadership roles in Pankow’s Honolulu and Northern California regional offices and was appointed president of the firm in 2009.

| Aug 7, 2012

Suffolk Construction builds new Boston Tea Party Ships & Museum

Construction management firm links history with the future by building museum using state-of-the-art virtual models and BIM technologies.

| Aug 7, 2012

Essex Builders to build church in Somerville, Mass.

The project’s design documents were prepared by Boston Bay Architects and reflect the church’s mission to serve the broader community as well as worship.

| Aug 6, 2012

Johnson Controls GWS appoints Genemaras as COO

Genemaras brings a wealth of experience in international business operations.

| Aug 6, 2012

Welton promoted to principal in Thornton Tomasetti’s Denver office

Welton serves as the manager of the firm’s Denver office and has more than 30 years of structural engineering experience across a range of project types including sports, commercial and residential.

| Aug 6, 2012

Kibby has joins the Harmon team

Kibby has over 24 years of experience in the glazing industry, coming to Harmon from Architectural Wall Systems where he worked in business development.

| Aug 3, 2012

Goettsch Partners opens new Abu Dhabi office

The GP Abu Dhabi office is managed by Steven M. Nilles, FAIA, LEED AP, a partner in the firm and resident of Abu Dhabi.

| Aug 3, 2012

Pinto promoted to VP in Thornton Tomasetti’s Philly office

Project experience includes commercial and residential buildings, government facilities, sports venues, airports and hotels.

| Aug 3, 2012

Nonres construction spending to increase through 2012, growth projected for 2013

Commercial and industrial projects poised to lead building sectors.

| Jul 31, 2012

Thornton Tomasetti announces four promotions in Chicago office

Promotions in Thornton Tomasetti office key on industy veterans.

boombox1
boombox2
native1

More In Category




Museums

UT Dallas opens Morphosis-designed Crow Museum of Asian Art

In Richardson, Tex., the University of Texas at Dallas has opened a second location for the Crow Museum of Asian Art—the first of multiple buildings that will be part of a 12-acre cultural district. When completed, the arts and performance complex, called the Edith and Peter O’Donnell Jr. Athenaeum, will include two museums, a performance hall and music building, a grand plaza, and a dedicated parking structure on the Richardson campus.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021