flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Hawaiian architecture firm chooses FRP trellis system over traditional materials

Hawaiian architecture firm chooses FRP trellis system over traditional materials

MGA Architecture plans to add five more trellis systems on the neighboring building. 


By By BD+C Staff | March 22, 2012
Strongwells products were used by Plas-Tech Ltd., a Hawaiian fabricator, for an
Strongwells products were used by Plas-Tech Ltd., a Hawaiian fabricator, for an architectural trellis overlooking Waikiki, Hono

Strongwell’s products were used by Plas-Tech Ltd., a Honolulu, Hawaii fabricator, for an architectural trellis overlooking Waikiki, Honolulu, Hawaii. The trellis sits on top of the Waikiki Shopping Plaza located at the center of the city on world-famous Kalakaua Avenue. The retail center is home to over 50 tenants including national brands GUESS and LeSportSac and also a number of local favorites such as Local Motion, Ukulele House, and Higgins Harte International Galleries.

MGA Architecture, Honolulu, Hawaii, specified the design of the trellis to use Strongwell’s EXTREN 2 x 6-½-in. rectangular tubes. Plas-Tech fabricated the trellis components by molding the outrigger beams and assembling and painting. MGA’s design was inspired by the native Hawaiian culture to evoke sensory response and emotional experience while blending in with the overly urban character of modern-day Waikiki. The trellis system was easily installed and both MGA and Plas-Tech are very happy with the finished product. MGA Architecture was so pleased with Strongwell’s FRP structural shapes, they have plans to add five more trellis systems on the neighboring building. They will also use Strongwell components for another future project.

Project Summary: Waikiki Shopping Plaza, Waikiki, Hawaii

BUILDING TEAM
Architect: MGA Architectures
Fabricator: Plas-Tech Ltd.
Product: Strongwell EXTREN 2 x 6-½-in. rectangular tubes

EXTREN is a proprietary combination of fiberglass reinforcements and thermosetting polyester or vinyl ester resin systems. It is produced in more than 100 standard shapes and has a surface veil to protect against glass fibers penetrating the resin surface in service and to increase corrosion and UV resistance. The features of EXTREN include: corrosion resistant, Low Conductivity – thermally and electrically, non-magnetic – electromagnetic transparency, lightweight, high strength, dimensional stability, and low maintenance.

The features of EXTREN include: corrosion resistant, low conductivity – thermally and electrically, non-magnetic – electromagnetic transparency, lightweight, high strength, dimensional stability, and low maintenance.

EXTREN is offered in three series designed for different environments and applications:

  • Series 500 – an all-purpose series utilizing an isophthalic polyester resin system with a UV inhibitor. Series 500 color is Olive Green
  • Series 525 – An all-purpose series utilizing a fire retardant isophthalic polyester resin system with a UV inhibitor. Series 525 color is Slate Gray (plus certain handrail and fixed ladder components in yellow)
  • Series 625 - A premium series both fire retardant and highly corrosion resistant utilizing a vinyl ester resin system with a UV inhibitor. Series 625 color is Beige

For more information, contact Strongwell at 276-645-8000, webmaster@strongwell.com or visit www.strongwell.com. BD+C

Related Stories

Building Team Awards | Apr 10, 2015

Virtual collaboration helps complete a hospital in 24 months

PinnacleHealth needed a new hospital STAT! This team delivered it in two years, start to finish.

Building Team Awards | Apr 10, 2015

New arts venue reinvigorates Virginia Tech's campus

The STV-led Building Team creates a world-class performance and arts venue with learning and entrepreneurial dimensions.

BIM and Information Technology | Apr 9, 2015

A carboard box by Google can bring virtual reality to architecture

The global search engine giant has launched a new product, Google Cardboard, that easily allows users to experience virtual reality.

Building Team Awards | Apr 9, 2015

Multifaced fitness center becomes campus landmark

A sloped running track and open-concept design put this Building Team to the test. 

Building Team Awards | Apr 9, 2015

Nation's first LEED-certified bus depot

A bus garage in Harlem shows that even the most mundane of facilities can strut its environmentally sensitive stuff.

Building Team Awards | Apr 9, 2015

Setting the bar for port-of-entry design

Whenever you eat a tomato from Mexico, there’s a one-in-three chance it came through this LEED Gold gateway.

Building Team Awards | Apr 9, 2015

Big D’s billion-dollar baby: New Parkland Hospital Tops the Chart | BD+C

Dallas’s new $1.27 billion public hospital preserves an important civic anchor, Texas-style.

Building Team Awards | Apr 9, 2015

IPD-driven fusion facility serves science and student life in Chicago

In dire need of modern science labs and a student union, North Park University built both—in the same building.

Building Team Awards | Apr 9, 2015

‘Prudent, not opulent’ sets the tone for this Catholic hospital

This Building Team stuck with a project for seven years to get a new hospital built for a faithful client.

Building Team Awards | Apr 9, 2015

9/11 museum triumphs over controversy

The Building Team for this highly visible project had much more than design, engineering, and construction problems to deal with.

boombox1
boombox2
native1

More In Category


Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021