flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Harvard’s District Energy Facility showcases a new infrastructure typology

University Buildings

Harvard’s District Energy Facility showcases a new infrastructure typology

The building is currently under construction.


By David Malone, Associate Editor | March 14, 2018
The DEF at night

Rendering courtesy of Leers Weinzapfel Associates

The 58,000-sf Harvard University Allston Campus District Energy Facility (DEF) will provide electricity, hot water, and chilled water to the Allston campus. The building represents a new infrastructure typology dubbed the cogeneration plant.

Designed by Leers Weinzapfel Associates, the DEF uses a compact cubic form with rounded corners that allows for maximum flexibility of future development and is a visible demonstration of cost-effective sustainability in building. The facility is wrapped in metal fins that form a screen around it, with “petal-like” elements set at varying degrees of openness to reveal or conceal the various equipment areas within.

 

Harvard's DEF as seen from across the riverRendering courtesy of Leers Weinzapfel Associates.

 

The fins are most open at the building’s corner entry and round the thermal energy storage tank. They are most closed on the service sides. The fins are raised above the ground on the public face of the building to reveal the main equipment hall to passersby.

The DEF’s transparent interior allows it to be used as a teaching tool for the university’s new science and engineering campus. People can observe the cogeneration plant’s complicated system of chillers, boilers, piping, pumps and flues, and electrical tools.

 

Rendering of Harvard's DEFRendering courtesy of Leers Weinzapfel Associates.

 

RMF Engineering designed the DEF’s equipment systems, which are efficient, resilient, and adaptable to the campus’s future needs. A chilled water reserve tank provides thermal energy to support efficient equipment use and equipment elevated above flood levels supports resiliency for continuous independent operation of the facility, even in the event of electrical grid failure. 

The project is slated for completion in 2019.

 

Rendering courtesy of Leers Weinzapfel Associates.

Tags

Related Stories

University Buildings | Oct 19, 2016

UC Merced to nearly double its size by 2020

Its growth strategy includes adding 1.2 million sf of space for teaching, housing, and research. 

University Buildings | Oct 12, 2016

The new Hancher Auditorium opens on University of Iowa campus

The building replaces the previous Hancher, which was irreparably damaged in the 2008 flood.

University Buildings | Oct 11, 2016

The University of Iowa gets a new Visual Arts Building

The building was a collaborative effort between BNIM and Steven Holl Architects and marks the sixth facility the two firms have worked together on

Sponsored | University Buildings | Oct 3, 2016

Enhancing university life: The smart shower bead

Residential spaces that need to meet high traffic demands while accommodating an ever-changing populace creates a unique set of obstacles for any educational institution’s housing.

Sponsored | University Buildings | Sep 29, 2016

UWM’s Kenwood Interdisciplinary Research Complex: The most distinctive building on campus

The largest building on campus, it was designed by Flad Architects to comply with LEED Gold Certification standards and to meet a wide range of current and future academic needs.

University Buildings | Sep 12, 2016

The University of Chicago’s newest residence halls are designed to be more like home

Abundant common spaces give students more chances to interact.

University Buildings | Aug 17, 2016

Supporting communities of motivated learners: reflections on SCUP-51

The two themes that were consistently woven into different topics were institutional transformation and connection with students.

University Buildings | Aug 16, 2016

New images of Rice University’s Moody Center for the Arts revealed by Michael Maltzan Architecture

The arts center will foster creativity for making and presenting works across all disciplines

| Aug 10, 2016

UNIVERSITY GIANTS: Facing money woes, the nation's colleges double down on innovative ideas

Budget constraints are compelling some public institutions to pursue alternative methods of financing their major building projects. 

| Aug 9, 2016

Top 70 University Engineering Firms

AECOM, WSP | Parsons Brinckerhoff, and Jacobs top Building Design+Construction’s annual ranking of the nation’s largest university sector engineering and E/A firms, as reported in the 2016 Giants 300 Report.

boombox1
boombox2
native1

More In Category




Student Housing

The University of Michigan addresses a decades-long student housing shortage with a new housing-dining facility

The University of Michigan has faced a decades-long shortage of on-campus student housing. In a couple of years, the situation should significantly improve with the addition of a new residential community on Central Campus in Ann Arbor, Mich. The University of Michigan has engaged American Campus Communities in a public-private partnership to lead the development of the environmentally sustainable living-learning student community.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021