Harvard University’s Graduate School of Design (GSD) has launched a new research center that is focused on advancing the energy efficiency of buildings through better design.
The impetus behind the Center for Green Buildings and Cities is what the design school’s dean, Mohsen Mostafavi, describes as a “rapidly urbanizing global economy,” in which cities are building new structures “on a massive scale.” Mohsen contends that this dynamic has led to energy consumption patterns that need to be changed to avoid “dramatic environmental consequences. Improving the energy efficiency of buildings is absolutely critical.”
The Center’s director is Ali Malkawi, a GSD professor who specializes in architectural technology and computation. Dr. Malkawi has also consulted on numerous construction projects, including airport designs, super towers, factories, and commercial and residential building.
The Center is pursuing a “design-centric strategy,” which links research outcomes to the development of new processes, systems, and products. To stimulate ideas and set its agenda, the Center will hold its inaugural Challenge Conference on Nov. 7, whose presenters will include James Carpenter, founder of James Carpenter Design Associates; Gordon Gill, a founding partner of Adrian Smith + Gordon Gill Architecture; Phil Harrison, president and CEO of Perkins + Will; Alejandro Murat, CEO of Infonavit, which provides financing for affordable housing in Mexico; and Joshua Prince-Ramus, a principal of Rex-NYC.
“As the Center gains momentum, its research trajectory will be guided by the outcome of both our preliminary research projects and the feedback from the focused symposia organized by the Center,” its website states.
The Center is backed by Evergrande Group, the giant China-based property developer that recently announced that it would invest nearly $15 billion to build 9.2 gigawatts of photovoltaic projects in that country, according to the National Business Daily newspaper. The terms of Evergrande’s support of the Center were not disclosed.
Related Stories
| May 29, 2012
Torrance Memorial Medical Center’s pediatric burn patients create their version of new Patient Tower using Legos
McCarthy workers joined the patients, donning construction gear and hard hats, to help with their building efforts.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 29, 2012
AIA expands Documents-On-Demand service??
Six new documents added, DOD offers nearly 100 contract documents.
| May 29, 2012
Legrand achieves over 20% energy-intensity reduction in Presidential Challenge
West Hartford headquarters announced as Better Buildings, Better Plants “Showcase” site.
| May 29, 2012
Thornton Tomasetti/Fore Solutions provides consulting for Phase I of Acadia Gateway Center
Project receives LEED Gold certification.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| May 24, 2012
Gilbane’s Spring 2012 economic report identifies multiple positive economic and market factors
Anticipating increasing escalation in owner costs through 2014.
| May 24, 2012
Construction backlog declines 5.4% in the first quarter of 2012?
The nation’s nonresidential construction activity will remain soft during the summer months, with flat to declining nonresidential construction spending.
| May 24, 2012
Stellar completes St. Mark’s Episcopal Church and Day School renovation and expansion
The project united the school campus and church campus including a 1,200-sf chapel expansion, a new 10,000-sf commons building, 7,400-sf of new covered walkways, and a drop-off pavilion.