The Hartford Courant reports that Hartford Hospital will break ground this week on “an architecturally dramatic, $150 million Bone and Joint Institute.”
Two architecture firms collaborated on the Bone and Joint Institute: HDR was responsible for the interiors of clinical and medical spaces, while Perkins+Will was in charge of the building’s exterior and lobby.
In a press release, the hospital announced that the building will be constructed on vacant land that directly connects to Hartford Hospital’s main building. The Institute will consist of five floors of 130,000 sf with ten inpatient and outpatient operating rooms. The plan is to have 52 inpatient beds with the capability of expanding to nearly 80 beds.
The renderings released via the Hartford Courant show two bright-white buildings with curvy exterior walls and rounded edges connected by a skywalk over Seymour Street on the third story, mimicking bones and ligament.
The outpatient ambulatory facility is slated to open in January 2016, while the inpatient hospital building is planned to be finished around Labor Day 2016.
Find out more at the Hartford Courant.
Related Stories
| Dec 8, 2011
HDR opens office in Shanghai
The office, located in the Chong Hing Finance Center in Shanghai’s busy Huangpu District, will support HDR’s design efforts throughout Asia.
| Dec 8, 2011
HOK elevates the green office standard
Firm achieves LEED Platinum certification in New York office that overlooks Bryant Park.
| Dec 7, 2011
ACE Mentor Program receives Presidential Award for Excellence in Science, Math and Engineering Mentoring
Thornton Tomasetti founding principal Charles H. Thornton responsible for launching ACE.
| Dec 7, 2011
NSF International qualifies first wallcoverings distributor to the New American National Standard for Sustainable Wallcoverings
TRI-KES demonstrates leadership in environmental stewardship as the first distributor to earn qualification.
| Dec 7, 2011
DPR Foundation awards $590,000 to youth organizations
Grants will fund programs for disadvantaged kids across six states.
| Dec 7, 2011
Autodesk agrees to acquire Horizontal Systems
Acquisition extends and accelerates cloud-based BIM solutions for collaboration, data, and lifecycle management.
| Dec 7, 2011
ICS Builders and BKSK Architects complete St. Hilda’s House in Manhattan
The facility's design highlights the inherent link between environmental consciousness and religious reverence.
| Dec 6, 2011
Construction industry leaders gather for forum on diversity
Declared a “groundbreaking” event for the industry, Gilbane’s First Annual National Partners Council Forum addressed diversity and inclusion as well as building partnerships with minority, veteran, and women-owned businesses.
| Dec 6, 2011
Mortenson Construction completes Elk Wind Project in Iowa
By the end of 2011, Mortenson will have built 17 wind projects in the state generating a total of 1894 megawatts of renewable power.
| Dec 6, 2011
?ThyssenKrupp acquires Sterling Elevators Services
The acquisition of Sterling Elevator Services Corporation is the third acquisition completed by ThyssenKrupp Elevator AG in the last three months in North America.