The Hartford Courant reports that Hartford Hospital will break ground this week on “an architecturally dramatic, $150 million Bone and Joint Institute.”
Two architecture firms collaborated on the Bone and Joint Institute: HDR was responsible for the interiors of clinical and medical spaces, while Perkins+Will was in charge of the building’s exterior and lobby.
In a press release, the hospital announced that the building will be constructed on vacant land that directly connects to Hartford Hospital’s main building. The Institute will consist of five floors of 130,000 sf with ten inpatient and outpatient operating rooms. The plan is to have 52 inpatient beds with the capability of expanding to nearly 80 beds.
The renderings released via the Hartford Courant show two bright-white buildings with curvy exterior walls and rounded edges connected by a skywalk over Seymour Street on the third story, mimicking bones and ligament.
The outpatient ambulatory facility is slated to open in January 2016, while the inpatient hospital building is planned to be finished around Labor Day 2016.
Find out more at the Hartford Courant.
Related Stories
| Feb 2, 2012
VLK Architects selected for new Cypress, Texas elementary school
The Bridgeland Elementary School will be a new prototype school for the District. Designed to meet the requirements of The Collaborative for High Performance Schools.
| Feb 2, 2012
Mortenson Construction to build 2.4 MW solar project in North Carolina
Located on a 12 acre site in the Sandhills region, the 2.4 megawatt (MW) system is expected to generate approximately 3.5 million kilowatt hours (kWhs) of clean electricity on an annual basis.
| Feb 2, 2012
Shawmut Design and Construction launches sports venues division
Expansion caps year of growth for Shawmut.
| Feb 2, 2012
Fire rated glazing helps historic university preserve its past
When the University embarked on its first major addition since the opening of Hutchins Hall in 1933, preserving the Collegiate Gothic-style architecture was of utmost importance.
| Feb 2, 2012
Delk joins Gilbane Building Co.
Delk to focus on healthcare construction programs and highly complex higher education facilities for Gilbane Building Company’s Southwest region.
| Feb 2, 2012
Next phase of construction begins on Scripps Prebys Cardiovascular Institute
$456 million Institute will be comprehensive heart center for 21st Century.
| Feb 1, 2012
Increase notched in construction jobs, but unemployment rate still at 16%
AGC officials said that construction employment likely benefited from unseasonably warm weather across much of the country that extended the building season.
| Feb 1, 2012
Replacement windows eliminate weak link in the building envelope
Replacement or retrofit can help keep energy costs from going out the window.
| Feb 1, 2012
‘Augmented reality’ comes to the job site
A new software tool derived from virtual reality is helping Building Teams use the power of BIM models more effectively.
| Feb 1, 2012
New ways to work with wood
New products like cross-laminated timber are spurring interest in wood as a structural material.