The Hartford Courant reports that Hartford Hospital will break ground this week on “an architecturally dramatic, $150 million Bone and Joint Institute.”
Two architecture firms collaborated on the Bone and Joint Institute: HDR was responsible for the interiors of clinical and medical spaces, while Perkins+Will was in charge of the building’s exterior and lobby.
In a press release, the hospital announced that the building will be constructed on vacant land that directly connects to Hartford Hospital’s main building. The Institute will consist of five floors of 130,000 sf with ten inpatient and outpatient operating rooms. The plan is to have 52 inpatient beds with the capability of expanding to nearly 80 beds.
The renderings released via the Hartford Courant show two bright-white buildings with curvy exterior walls and rounded edges connected by a skywalk over Seymour Street on the third story, mimicking bones and ligament.
The outpatient ambulatory facility is slated to open in January 2016, while the inpatient hospital building is planned to be finished around Labor Day 2016.
Find out more at the Hartford Courant.
Related Stories
| Mar 21, 2012
ABI remains positive for fourth straight month
Highest spike in inquiries for new projects since 2007.
| Mar 21, 2012
Iowa’s Mercy Medical Center’s new Emergency Department constructed using Lean design
New Emergency Department features a "racetrack" design with a central nurses' station encircled by 19 private patient examination rooms and 2 trauma treatment rooms.
| Mar 21, 2012
Clary, Hendrickson named regional directors for HDR Architecture
New directors will be responsible for expanding and strengthening the firm throughout the central region.
| Mar 20, 2012
FMI releases 2012 first quarter construction outlook
The last time construction put in place was at this level was 2000-2001.
| Mar 20, 2012
Ceco Building Systems names Romans marketing director
Romans joins Ceco Building Systems with over 15 years in marketing and customer service.
| Mar 20, 2012
UT Arlington launches David Dillon Center for Texas Architecture
Symposium about Texas architecture planned for April.
| Mar 20, 2012
Stanford’s Knight Management Center Awarded LEED Platinum
The 360,000-sf facility underscores what is taught in many of the school’s electives such as Environmental Entrepreneurship and Environmental Science for Managers and Policy Makers, as well as in core classes covering sustainability across the functions of business.
| Mar 20, 2012
New office designs at San Diego’s Sunroad Corporate Center
Traditional office space being transformed into a modern work environment, complete with private offices, high-tech conference rooms, a break room, and an art gallery, as well as standard facilities and amenities.
| Mar 19, 2012
Obama’s positioned to out-regulate Bush in second term
Proposed ozone rule would cost $19 billion to $90 billion in 2020, according to the White House.
| Mar 19, 2012
Skanska promotes Saunders to VP/GM of Bayshore Concrete Products
During his more than 13 years with Bayshore, Saunders has provided products for Victory Bridge in New Jersey, Route 52 Causeway in Ocean City, N.J., and for numerous piers at Naval Station Norfolk and the Norfolk Naval Shipyard.