The Hartford Courant reports that Hartford Hospital will break ground this week on “an architecturally dramatic, $150 million Bone and Joint Institute.”
Two architecture firms collaborated on the Bone and Joint Institute: HDR was responsible for the interiors of clinical and medical spaces, while Perkins+Will was in charge of the building’s exterior and lobby.
In a press release, the hospital announced that the building will be constructed on vacant land that directly connects to Hartford Hospital’s main building. The Institute will consist of five floors of 130,000 sf with ten inpatient and outpatient operating rooms. The plan is to have 52 inpatient beds with the capability of expanding to nearly 80 beds.
The renderings released via the Hartford Courant show two bright-white buildings with curvy exterior walls and rounded edges connected by a skywalk over Seymour Street on the third story, mimicking bones and ligament.
The outpatient ambulatory facility is slated to open in January 2016, while the inpatient hospital building is planned to be finished around Labor Day 2016.
Find out more at the Hartford Courant.
Related Stories
| Dec 9, 2012
Modular classroom building makes the grade
SAGE modular classroom opens eyes, minds at Greenbuild 2012.
| Dec 9, 2012
14 great solutions
Welcome to the third installment of Building Design+Construction’s “Great Solutions,” highlighting 14 innovative technologies and products that you can put to work in your next project.
| Dec 9, 2012
AEC professionals cautiously optimistic about commercial construction in ’13
Most economists say the U.S. is slowly emerging from the Great Recession, a view that was confirmed to some extent by an exclusive survey of 498 BD+C subscribers whose views we sought on the commercial construction industry’s outlook on business prospects for 2013.
| Dec 7, 2012
Structural glazing sealant protects solar-rooftop stadium in Taiwan
Designers of the Kaohsiung World Games Main Stadium in Gaoxiong, Taiwan, powered by almost 9,000 rooftop solar panels, required an effective panel fixing design offering optimum energy transfer rate, plus thermal and weathertight performance. Dow Corning specialists recommended a four-sided structural sealant solution featuring Dow Corning 983 Structural Glazing Sealant.
| Dec 6, 2012
Ziegler Cooper names Soto as Director of Design, Broadens Design Capabilities
Soto will oversee design efforts, bringing a high level of quality and problem solving capabilities through active engagement with clients and studios firm wide.
| Dec 5, 2012
Gilbane publishes Winter 2012 construction economic report
Report outlines impact of recent events; predicts continued movement, while slow, toward recovery.
| Dec 5, 2012
Gehry-designed New York City tower receives Emporis Skyscraper Award
8 Spruce Street is now the third New York tower to win the Emporis Skyscraper Award.
| Dec 4, 2012
MKK’s Denver Human Services Eastside Building wins ACEC Excellence Award
MKK provided mechanical, plumbing and fire protection consulting services on this LEED-NC Gold project.
| Dec 4, 2012
Thornton Tomasetti opens new office in São Paulo, Brazil
The move to São Paulo is strategic and timely, as the country continues preparations for the 2014 World Cup and 2016 Olympic Games in Rio de Janeiro.