Southfield, Mich.-based architectural firm Harley Ellis Devereaux (HED) is joining forces with Deems Lewis McKinley (DLM), a 57-year-old architecture and engineering services firm headquartered in San Franicisco.
The merger, whose terms were not disclosed, is expected to strengthen HED’s presence in the K-12 and Community Education markets, where DLM has established itself as a recognized leader. (Its tagline is “Improving Education through Design,” and 95% of its clients are educational institutions.)
Among its featured projects in that sector is the Bay Farm Elementary School in the Alameda (Calif.) Unified School District, whose eight-acre campus is surrounded on three sides by single-family residences, and adjoined by a five-acre city park. DLM also designed the new 44,000-sf Susan B. Anthony School in Daly City, Calif., which resembles a modern version of a red brick schoolhouse.
This merger expands HED’s presence in California’s Bay Area and Sacramento, DLM’s two primary markets. Prior to this agreement, HED had been managing its accounts and projects in Northern California mostly out of its office in Los Angeles, according to a company spokesperson. Next month, DLM’s staff in San Francisco will relocate to HED’s San Francisco office, which is currently being enlarged. DLM’s employees working out of its Sacramento office will stay there.
“We are looking forward to merging the talents of our two teams and are excited to be part of a very talented studio with deep resources,” says Wallace B. (Wally) Gordon, AIA, LEED AP, President and Chief Executive Officer of DLM, who is staying stay on with HED along with DLM’s principals and senior associates. The one person working in DLM’s office in San Diego—where the firm was founded—will now work from HED’s 20-person office in that city.
Prior to this agreement, HED had 380 employees working from offices in Chicago, Detroit, L.A., San Diego, and San Francisco.
Related Stories
| Nov 14, 2011
Summit Design+Build selected at GC for new Office Concepts headquarters
The new headquarters will include 17,000 sf of office space and 15,000 sf of warehouse and feature 24 ft ceilings, an open floor plan, two conference rooms and one training room and will feature sustainable finishes throughout.
| Nov 14, 2011
Griffin Electric completes electrical work at Cary Arts Center
The Griffin Electric team was responsible for replacing the previous electrical service on-site with a 1000A, 480/277V service and providing electrical feeds for a new fire pump chiller, six air-handlers and two elevators.
| Nov 14, 2011
303 East 33rd Street building achieves LEED-NC
The 165,000 sf 12-story residential building is the first green development to be LEED certified in the Murray Hill neighborhood of Manhattan.
| Nov 14, 2011
VanSumeren appointed to Traco general manager
VanSumeren will draw on his more than 20 years of experience in manufacturing management and engineering to deliver operational and service excellence and drive profitable growth for Traco.
| Nov 11, 2011
By the Numbers
What do ‘46.9,’ ‘886.2,’ and ‘171,271’ mean to you? Check here for the answer.
| Nov 11, 2011
Streamline Design-build with BIM
How construction manager Barton Malow utilized BIM and design-build to deliver a quick turnaround for Georgia Tech’s new practice facility.
| Nov 11, 2011
AIA: Engineered Brick + Masonry for Commercial Buildings
Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam.
| Nov 11, 2011
How Your Firm Can Win Federal + Military Projects
The civilian and military branches of the federal government are looking for innovative, smart-thinking AEC firms to design and construct their capital projects. Our sources give you the inside story.
| Nov 10, 2011
BD+C's 28th Annual Reconstruction Awards
A total of 13 projects recognized as part of BD+C's 28th Annual Reconstruction Awards.