flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Hank Adams Named to Lead HDR’s Healthcare Program

Hank Adams Named to Lead HDR’s Healthcare Program

With more than 25 years of experience, HDR vice president is tapped to lead firm's healthcare projects.


By Posted by Raissa Rocha, Associate Editor | October 11, 2012

Hank Adams, AIA, ACHA, EDAC has been promoted to director of the healthcare program for HDR Architecture. A vice president with the firm, Adams has more than 25 years of healthcare architectural experience and has managed dozens of healthcare projects ranging from complete replacement facilities to multi-phased master plan implementations.

“All of us at HDR are proud of the design creativity, intellectual capital, and hard work that have contributed to building our global design and consulting practice. I am both honored and humbled to be leading the healthcare program; our work is not only a catalyst for change in healthcare delivery, but it impacts the health and well-being of the world,” Adams noted. “As we move forward, my vision for HDR is to be a trusted partner to our healthcare clients. We are helping them successfully navigate through the rapid evolution of modern medicine, economic shifts, and health policy changes toward a sustainable healthcare delivery system that meets the needs of both current and future generations. We’re curious, energized, and prepared to meet this challenge.”

“Hank’s passion for healthcare and his insight into the entire continuum of care made him the natural choice for leading our healthcare program,” said Doug Wignall, AIA, LEED AP, president of HDR Architecture. “His experience provides a unique and comprehensive understanding of the design, management, and technical aspects of complex healthcare projects.  He also works diligently to foster an environment that will continue to inspire our skilled and imaginative leaders who are staying one step ahead of the changing paradigm that is 21st-century healthcare.”

Adams has extensive firm leadership experience as a healthcare principal, project manager, healthcare planner, and business developer. As director of HDR’s healthcare program, he provides strategic leadership and overall direction for the program and commits the necessary resources of the firm to successfully complete healthcare projects that embody the firm's clients’ visions and goals. In addition, Adams is an integral member of the design team for the $1.2 billion Parkland replacement hospital project in Dallas, serving as the design manager for the HDR + Corgan Joint Venture Design Team and providing overall leadership and direction to the integrated project delivery team of healthcare design and construction experts.

Adams is based in the firm’s Dallas office. He holds a Bachelor of Architecture degree from Oklahoma State University, and is an active member of the American College of Healthcare Architects (ACHA).

Related Stories

Industry Research | Jun 15, 2023

Exurbs and emerging suburbs having fastest population growth, says Cushman & Wakefield

Recently released county and metro-level population growth data by the U.S. Census Bureau shows that the fastest growing areas are found in exurbs and emerging suburbs. 

Healthcare Facilities | Jun 14, 2023

Design considerations for behavioral health patients

The surrounding environment plays a huge role in the mental state of the occupants of a space, especially behavioral health patients whose perception of safety can be heightened. When patients do not feel comfortable in a space, the relationships between patients and therapists are negatively affected.

Engineers | Jun 14, 2023

The high cost of low maintenance

Walter P Moore’s Javier Balma, PhD, PE, SE, and Webb Wright, PE, identify the primary causes of engineering failures, define proactive versus reactive maintenance, recognize the reasons for deferred maintenance, and identify the financial and safety risks related to deferred maintenance.

University Buildings | Jun 14, 2023

Calif. State University’s new ‘library-plus’ building bridges upper and lower campuses

A three-story “library-plus” building at California State University, East Bay (CSUEB) that ties together the upper and lower campuses was recently completed. The 100,977-sf facility, known as the Collaborative Opportunities for Research & Engagement (“CORE”) Building, is one of the busiest libraries in the CSU system. The previous library served 1.2 million visitors annually.

Higher Education | Jun 14, 2023

Designing higher education facilities without knowing the end users

A team of architects with Page offers five important factors to consider when designing spaces for multiple—and potentially changing—stakeholders.

Resiliency | Jun 14, 2023

HUD offers $4.8 billion in funding for green and resilient building retrofit projects

The Department of Housing and Urban Development (HUD) recently released guidelines for its Green and Resilient Retrofit Program (GRRP) that has $4.8 billion for funding green projects.

Arenas | Jun 14, 2023

A multipurpose arena helps revitalize a historic African American community in Georgia

In Savannah, Ga., Enmarket Arena, a multipurpose arena that opened last year, has helped revitalize the city’s historic Canal District—home to a largely African American community that has been historically separated from the rest of downtown.

Building Materials | Jun 14, 2023

Construction input prices fall 0.6% in May 2023

Construction input prices fell 0.6% in May compared to the previous month, according to an Associated Builders and Contractors analysis of the U.S. Bureau of Labor Statistics’ Producer Price Index data released today. Nonresidential construction input prices declined 0.5% for the month.

Mass Timber | Jun 13, 2023

Mass timber construction featured in two-story mixed-use art gallery and wine bar in Silicon Valley

The Edes Building, a two-story art gallery and wine bar in the Silicon Valley community of Morgan Hill, will prominently feature mass timber. Cross-laminated timber (CLT) and glulam posts and beams were specified for aesthetics, biophilic properties, and a reduced carbon footprint compared to concrete and steel alternatives.

Mixed-Use | Jun 12, 2023

Goettsch Partners completes its largest China project to date: a mixed-used, five-tower complex

Chicago-based global architecture firm Goettsch Partners (GP) recently announced the completion of its largest project in China to date: the China Resources Qianhai Center, a mixed-use complex in the Qianhai district of Shenzhen. Developed by CR Land, the project includes five towers totaling almost 472,000 square meters (4.6 million sf). 

boombox1
boombox2
native1

More In Category


Urban Planning

The magic of L.A.’s Melrose Mile

Great streets are generally not initially curated or willed into being. Rather, they emerge organically from unintentional synergies of commercial, business, cultural and economic drivers. L.A.’s Melrose Avenue is a prime example. 


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021