flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Handheld weather device could help keep construction crews safer

Products and Materials

Handheld weather device could help keep construction crews safer

The INO Weather Pro combines lightning, temperature, atmospheric pressure, and humidity sensors into one device.


By David Malone, Associate Editor | January 19, 2017

Photo courtesy of INO Technologies

When lightning is nearby, high up on a roof or a steel girder is one of the last places you would want to find yourself. With the unpredictability of weather and cell phone and internet service making it difficult to anticipate exactly when and where a storm will hit, a recently released handheld device looks to add one more weapon to the arsenal of outdoor weather intelligence products that can help keep construction crews safe.

The INO Weather Pro is, according to INO Technologies, the first handheld device that combines weather data with lightning detection. Most lightning detection technologies rely on national weather data feeds, which require an internet or cellular connection to update. But cell and internet service may not always be available on a construction site, which is why the INO Weather Pro uses its own sensor to provide real-time local lightning detection and direction. The company claims the INO Weather Pro can detect cloud-to-ground lightning strikes as far away as 40 miles.

When a strike is detected, the device will alert the wearer with both visual and auditory feedback of the strike’s distance. The INO Weather Pro uses updatable software and a customizable touchscreen display that allows users to fill their dashboards with the information that is most pertinent to them. In all, the INO Weather Pro provides seven functions: lightning detection, temperature, atmospheric pressure, humidity, heat index, altitude, and dew point.

The water-resistant device runs on a USB charged Lithium battery and has a suggested retail price of $497.

 

Photo courtesy of INO Technologies.

Related Stories

| Aug 11, 2010

10% of world's skyscraper construction on hold

Emporis, the largest provider of global building data worldwide, reported that 8.7% of all skyscrapers listed as "under construction" in its database had been put on hold. Most of these projects have been halted in the second half of 2008. According to Emporis statistics, the United States had been hit the worst: at the beginning of 2008, "Met 3" in Miami was the only U.S. skyscraper listed as being "on hold". In the second half of the year, 19 projects followed suit.

| Aug 11, 2010

Structure Tone, Turner among the nation's busiest reconstruction contractors, according to BD+C's Giants 300 report

A ranking of the Top 75 Reconstruction Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

IFMA workplace study: Average space per employee up 40 sf since 2007, likely due to corporate layoffs

The International Facility Management Association has released “Operations and Maintenance Benchmarks, Research Report #32,” a study outlining the facility trends affecting workplaces throughout North America. Among the new report’s findings are that the average space per person has risen nearly 40 square feet since 2007, likely due to recent corporate layoffs.

| Aug 11, 2010

ASHRAE research targets tying together BIM and energy efficiency

Ensuring that a common language of “energy efficiency” is spoken by both building information modeling software used by architects and energy analysis and simulation software used by engineers is the goal of new research funded by ASHRAE.

| Aug 11, 2010

M&A deal volume down 67% in engineering/construction sector: PricewaterhouseCoopers

Global Economic Uncertainty Results in Sluggish Deal Activity in U.S.; China Shows Significant Opportunity for Growth

| Aug 11, 2010

New Watt Stopper emergency relay panel

Watt Stopper/Legrand has developed a new relay panel to provide fail-safe emergency lighting in a variety of commercial settings. The Emergency Relay Panel option is UL924 listed for use on emergency circuits. It is available as an option with Watt Stopper’s 24 or 48 relay size Lighting Integrator (LI) low voltage lighting control panels.

| Aug 11, 2010

Three Opus Corporation companies file for bankruptcy

Opus Corporation, a developer headquartered in Minnetonka, Minn., filed for bankruptcy in three of its five regional operating companies: Opus East, Opus South, and Opus West. CEO Mark Rauenhorst said sharp declines in commercial real estate values and tight credit markets caused difficulties in refinancing assets and restructuring lending agreements.

boombox1
boombox2
native1

More In Category

Products and Materials

Top products from AIA 2024

This month, Building Design+Construction editors are bringing you the top products displayed at the 2024 AIA Conference on Architecture & Design. Nearly 550 building product manufacturers showcased their products—here are 17 that caught our eye.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021