flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Half of Manhattan’s new residential skyscrapers are empty

Codes and Standards

Half of Manhattan’s new residential skyscrapers are empty

Excess comes as middle class housing shortage worsens.


By Peter Fabris, Contributing Editor | January 29, 2020

Courtesy Pixabay

When it comes to housing, New York is a literally a tale of two cities.

About half of the luxury-condo units that have come onto the market in the past five years are still unsold. Meanwhile, 80,000 people sleep in New York City’s shelters or in makeshift shelters on the streets. Many of the sleek glass and steel condo high rises were intended for foreign buyers, but the Chinese economy slowed, and declining oil prices reduced demand from the wealthy Russian and Middle Eastern markets. As a result, many multi-million dollar units are empty.

Affordable housing was central to Mayor Bill De Blasio’s administration, but progress has stalled. The reasons: onerous zoning regulations, limited federal subsidies, construction delays, and blocked pro-tenant bills. Over the past 10 years, New York City real-estate prices have skyrocketed. From 2010 to 2019, for example, the average sale price of homes doubled in many Brooklyn neighborhoods.

The New York City area is losing about 300 residents every day, with a lack of housing a major factor. New York isn’t alone among big cities with an affordable housing crisis. Across the country, the supply of housing hasn’t kept up with population growth. Single-family-home sales are stuck at 1996 levels, even though the United States has added 60 million people since the mid-’90s.

Related Stories

Codes and Standards | Apr 20, 2021

U.S. electric grid is halfway to zero carbon

Other sectors including buildings lag power industry.

Codes and Standards | Apr 19, 2021

Failed landmark preservation effort in Chicago provides lessons for planners

Gentrification fears heightened among Pilsen neighborhood residents doomed ambitious preservation plan.

Codes and Standards | Apr 14, 2021

New Phase 1 Environmental Site Assessment standard debuts in 2021

Will affect 250,000 commercial real estate deals a year.

Codes and Standards | Apr 13, 2021

British Columbia moves to accelerate mass timber construction

Province funds demonstration projects as part of economic recovery.

Codes and Standards | Apr 12, 2021

WoodWorks and Think Wood release first Mass Timber Design Manual

Interactive collection of information on mass timber products, design best practices, taller wood construction and sustainability.

Codes and Standards | Apr 8, 2021

Sensors used in tunable lighting systems found to have high reliability

DOE study investigated items used to control lumen depreciation, chromaticity shifts, and changes in drivers.

Codes and Standards | Apr 7, 2021

Red tape ruined the U.K.’s home retrofit program

Lessons learned could help US avoid that fate.

Codes and Standards | Apr 6, 2021

Lendlease achieves net-zero carbon in Boston, Chicago multifamily portfolio

New projects in New York, Los Angeles on track to reach goal.

Codes and Standards | Apr 5, 2021

Specification for sliding door, lift and slide roller assemblies updated

Addresses market trend toward heavy sliding doors.

Codes and Standards | Apr 5, 2021

Construction employment rebounds in March following February drop

Rising costs, supply-chain woes, and cancellations threaten outlook.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021