flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Gypsum Association releases updates to wallboard repair standards

Gypsum Association releases updates to wallboard repair standards

Recommendations for repairing joint ridging and fastener pops featured


By BD+C Staff | July 31, 2014
Photo: Findoutwhy via Wikimedia Commons
Photo: Findoutwhy via Wikimedia Commons

The Gypsum Association released updates to both GA-221 Repair of Joint Ridging and GA-222 Repairing Screw or Nail Pops standards publications. Each set of recommendations clarifies best practices associated with common wallboard repairs.

Joint ridging, or beading, is a uniform, fine linear deformation that occurs at the joints of finished and decorated gypsum panel products. Compression at the edges or ends of the panels due to extreme fluctuations of temperature and humidity is the most common cause of ridging; however, misaligned framing can also contribute to the problem. The Gypsum Association recommends waiting until a new structure has experienced at least one complete heating/cooling cycle before making repairs.

Fastener popping occurs most commonly from lumber shrinkage due to initially high moisture content in newly constructed wood framing. Overly long fastener length contributes to the problem. While fastener popping that appears before or during finishing and decoration should be repaired immediately; popping that occurs a month or more into the heating season should wait for repair until the season’s end.

In the case of fastener popping, the secure reattachment of the gypsum panel product to the framing is essential. All new screws or nails should be of the proper length. Key to the repair methods outlined in both GA-221-14 and GA-222-14 is careful sanding and treatment with joint compound as well as observing recommended drying times prior to redecoration.

(https://www.gypsum.org/2014/07/just-released-updated-recommendations-for-gypsum-panel-product-repairs/)

Related Stories

Codes and Standards | Jun 10, 2019

Intl. Code Council releases Natural Disaster Preparedness Guide

Provides tips for staying safe during and after a hurricane or severe weather.

Codes and Standards | Jun 7, 2019

Market conditions indicate slower growth in industrial real estate sector

E-commerce, market oversupply, rising interest rates to dampen hot market.

Codes and Standards | Jun 3, 2019

Haskell invests in BLOX, creator of modular-based delivery method

‘Represents important part of Haskell’s future strategy,’ says CEO.

Codes and Standards | May 31, 2019

RELi 2.0 standard for sustainability, resilience being piloted

Will be open to LEED-registered or -certified projects, with introductory pricing and support.

Codes and Standards | May 24, 2019

USGBC receives funding for LEED for Cities and Communities Program

Bank of America provides $500,000 grant to certify 15 U.S. cities.

Codes and Standards | May 24, 2019

AIA updates Interiors Contract Documents

Six revised documents available for interior construction projects.

Codes and Standards | May 23, 2019

Northern California casino offers a template for resilient microgrids

Solar power with batteries and backup generators provide weeks of self-reliance.

Codes and Standards | May 23, 2019

Austin creates innovative plan to boost affordable housing

Approach includes loosened zoning, incentives for higher density in lower-cost and mixed-income developments.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021