flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Gypsum Association releases updates to wallboard repair standards

Gypsum Association releases updates to wallboard repair standards

Recommendations for repairing joint ridging and fastener pops featured


By BD+C Staff | July 31, 2014
Photo: Findoutwhy via Wikimedia Commons
Photo: Findoutwhy via Wikimedia Commons

The Gypsum Association released updates to both GA-221 Repair of Joint Ridging and GA-222 Repairing Screw or Nail Pops standards publications. Each set of recommendations clarifies best practices associated with common wallboard repairs.

Joint ridging, or beading, is a uniform, fine linear deformation that occurs at the joints of finished and decorated gypsum panel products. Compression at the edges or ends of the panels due to extreme fluctuations of temperature and humidity is the most common cause of ridging; however, misaligned framing can also contribute to the problem. The Gypsum Association recommends waiting until a new structure has experienced at least one complete heating/cooling cycle before making repairs.

Fastener popping occurs most commonly from lumber shrinkage due to initially high moisture content in newly constructed wood framing. Overly long fastener length contributes to the problem. While fastener popping that appears before or during finishing and decoration should be repaired immediately; popping that occurs a month or more into the heating season should wait for repair until the season’s end.

In the case of fastener popping, the secure reattachment of the gypsum panel product to the framing is essential. All new screws or nails should be of the proper length. Key to the repair methods outlined in both GA-221-14 and GA-222-14 is careful sanding and treatment with joint compound as well as observing recommended drying times prior to redecoration.

(https://www.gypsum.org/2014/07/just-released-updated-recommendations-for-gypsum-panel-product-repairs/)

Related Stories

Codes and Standards | Nov 15, 2018

New versions of DOE’s EnergyPlus engine and the OpenStudio software development kit released

New offerings resolve over 70 bugs and offer new features.

Codes and Standards | Nov 14, 2018

Obsolete safety standards may have been used in cleanup of former naval shipyard

San Francisco redevelopment site work may have been racked by fraud.

Codes and Standards | Nov 13, 2018

New York City’s new construction safety requirements are delayed

Some contractors say they weren’t ready for ‘massive initiative’.

Codes and Standards | Nov 9, 2018

Cities have multiple strategies to reduce parking requirements

Each community has to find its own mix of solutions.

Codes and Standards | Nov 8, 2018

Denver replaces green roof mandate with cool roof option

Less costly light-colored roofs can cut project costs by about 1.5%.

Codes and Standards | Nov 7, 2018

New report addresses sound transmission of wood-framed assemblies

AWC document provides empirical sound transmission model.

Codes and Standards | Nov 6, 2018

AIA releases 13 new and updated contract documents

Includes new Contractor-Subcontractor Master Agreement.

Codes and Standards | Nov 1, 2018

Several barriers holding back widespread construction of zero energy buildings

Code improvements and voluntary programs could add momentum.

Codes and Standards | Oct 31, 2018

Boston’s new flood protection plan centers on new parks

Initiative would add 67 acres of public open space.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021