flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

GWWO Architects unveils design of the new Niagara Falls Visitor Center

Museums

GWWO Architects unveils design of the new Niagara Falls Visitor Center

The project will replace the current outdated and cramped facility.


By David Malone, Associate Editor | April 27, 2021
Niagara Falls Visitor Center interior and exterior space

All renderings courtesy GWWO Architects

The new Niagara Falls Visitor Center, located within Niagara Falls State Park, will offer an immersive experience, both inside the building and out, as it takes visitors on a journey spanning the eras of geological formation and human impacts on the falls and highlighting the flora and fauna of the environs.

Designed by GWWO Architects, the 29,000-sf center will include visitor orientation, a lobby, interactive exhibits, a gift shop, dining, outdoor terraces, and an overlook. The building frames views to the head of the falls and gracefully transitions visitors between the formal entrance gardens in the upper site and the Frederick Law Olmsted- designed landscape of the lower grove.

 

Niagara Falls Visitor Center interior exhibits

 

The expansive glass facade maximizes views and offers continuous connections to the falls throughout the lobby and exhibit areas. The building will be integrated with its site and history via natural materials such as limestone sourced from the Niagara escarpment, wood ceilings, and blackened metal roof and soffit.

The facility’s design will emphasize nature and allow visitors to choose their own path and level of discovery, which will allow for social distancing and crowd control. Outdoor interpretation, dining, and a new accessible path will provide safe spaces for visitors to gather.

 

Niagara Falls Visitor Center exterior main entry

 

The new visitor center will also include sustainable features such as bifacial photovoltaic panels that will be expressed around the perimeter of the roof of the building, with openings in the entrance canopy that will allow them to be viewed from below. Two cisterns will be installed to capture water from the building’s roof to irrigate native plantings on the site.

The Niagara Falls Visitor Center is expected to open in Spring 2023.

 

Niagara Falls Visitor Center interior stairs

 

Niagara Falls Visitor Center interior space

 

Niagara Falls Visitor Center exhibit space

 

Niagara Falls Visitor Center exhibition space

Tags

Related Stories

| Jun 12, 2014

Austrian university develops 'inflatable' concrete dome method

Constructing a concrete dome is a costly process, but this may change soon. A team from the Vienna University of Technology has developed a method that allows concrete domes to form with the use of air and steel cables instead of expensive, timber supporting structures.

| Jun 11, 2014

David Adjaye’s housing project in Sugar Hill nears completion

A new development in New York's historic Sugar Hill district nears completion, designed to be an icon for the neighborhood's rich history.

| Jun 9, 2014

Green Building Initiative launches Green Globes for Sustainable Interiors program

The new program focuses exclusively on the sustainable design and construction of interior spaces in nonresidential buildings and can be pursued by both building owners and individual lessees of commercial spaces.

| Jun 9, 2014

Eli Broad museum files $19.8 million lawsuit over delays

The museum, meant to hold Eli and Edythe Borad's collection of contemporary art, is suing the German company Seele for what the museum describes as delays in the creation of building blocks for its façade.

| Jun 4, 2014

Want to design a Guggenheim? Foundation launches open competition for proposed Helsinki museum

This is the first time the Guggenheim Foundation has sought a design through an open competition. Anonymous submissions for stage one of the competition are due September 10, 2014.

| May 29, 2014

7 cost-effective ways to make U.S. infrastructure more resilient

Moving critical elements to higher ground and designing for longer lifespans are just some of the ways cities and governments can make infrastructure more resilient to natural disasters and climate change, writes Richard Cavallaro, President of Skanska USA Civil.

| May 23, 2014

Big design, small package: AIA Chicago names 2014 Small Project Awards winners

Winning projects include an events center for Mies van der Rohe's landmark Farnsworth House and a new boathouse along the Chicago river.

| May 22, 2014

IKEA to convert original store into company museum

Due to open next year, the museum is expected to attract 200,000 people annually to rural Älmhult, Sweden, home of the first ever IKEA store.  

| May 21, 2014

Gehry unveils plan for renovation, expansion of Philadelphia Museum of Art [slideshow]

Gehry's final design reorganizes and expands the building, adding more than 169,000 sf of space, much of it below the iconic structure.

| May 20, 2014

Kinetic Architecture: New book explores innovations in active façades

The book, co-authored by Arup's Russell Fortmeyer, illustrates the various ways architects, consultants, and engineers approach energy and comfort by manipulating air, water, and light through the layers of passive and active building envelope systems.

boombox1
boombox2
native1

More In Category

Museums

Connecticut’s Bruce Museum more than doubles its size with a 42,000-sf, three-floor addition

In Greenwich, Conn., the Bruce Museum, a multidisciplinary institution highlighting art, science, and history, has undergone a campus revitalization and expansion that more than doubles the museum’s size. Designed by EskewDumezRipple and built by Turner Construction, the project includes a 42,000-sf, three-floor addition as well as a comprehensive renovation of the 32,500-sf museum, which was originally built as a private home in the mid-19th century and expanded in the early 1990s. 




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021

Â